Issues related to the collaborative process
Q1:What is the basic process for carrying out OEM cooperation with your factory?
A:Our cooperation process generally covers the following links: First, we communicate the preliminary requirements and confirm the intention of cooperation. Then, customers can provide their design schemes or work with us to carry out the design work. After the design is completed, it enters the quotation and confirmation stage, followed by the production of and waiting for the confirmation of the sample machine. Once the sample machine is confirmed, large-scale production begins. During the production process, quality inspection is strictly implemented. the products are qualified, they are packaged and delivered. After delivery, we will also provide you with perfect after-sales service.
Q2: How to start a discussion on cooperation with your factory?
A:You can contact us through our official website, sending an email, or directly calling us. Our sales team will reply to you within 2 hours and arrange a one-to-one detailed consultation service to answer your questions.
Products and customization capabilities
Q3:What products can your factory provide OEM services for?
A:We focus on the manufacturing of smart audio glasses, and can provide one-stop OEM services from design, template development to mass production. You can check our catalog, and if you have specific product line requirements, you can also contact us directly.
A: Of course we support! We have a strong R&D and design team, and can customize the design and production according to your specific needs covering various aspects such as the material of the temples, the choice of lens material, the appearance modeling of glasses, the color matching of glasses, the function setting of, and the size and appearance material of the packaging box, fully meeting your personalized needs.
Q4:Is custom design and production supported?
Q5: Quality and certification
How to ensure product quality?
A: We always strictly follow the ISO9001 quality management system, and implement quality control throughout the entire production process. Every product must multiple strict quality inspection processes before leaving the factory, from raw material inspection, production process sampling inspection to finished product full inspection, to ensure that the product quality is beyond. In addition, if customers have any requirements, we can also provide test reports issued by authoritative third-party institutions, as well as relevant industry certifications, to fully the high quality and compliance of the products.
Q6:Is the product certified to environmental or industry-specific standards?
A: Of course, we place great importance on the environmental performance of our products and compliance with industry standards. Our products fully comply with numerous environmental standards, such as RoHS (Restriction of Hazardous Substances Directive) and REACH (Regulation on the Registration, Evaluation, Authorization and Restriction Chemicals). At the same time, we are also able to obtain industry-specific certifications such as CE (European Conformity), UL (Underwriter Laboratories), and (Federal Communications Commission) for our products according to the specific requirements of different markets, ensuring that our products can smoothly enter various global markets.