Non-inductive wearing Thin flagship smart audio glasses Ultra-elastic Ultra-thin Ultra-light Ultra-large sound range
Coupled automatic switch machine
Micro-transparent texture

With innovative technology Create 'a slim gift 」
Create slim temple design,
Solve the problem of body width and weight,Bring smart glasses to sensorless wear.Foryou who want to trys mart glasses.

160m㎡large sound range Pleasant to the ears
Enjoy an immersive listening experience with nothingin your ears.
Open listening design preserves clarity and enhances layering.Equipped with a 160m㎡ super-large sound range,it brings the surging spatial stereo sound to the ears.
Lighter this time Easy to wear
The temple shell is made ofTR90 materialBoth light and resilient

This elasticity is just right
Elastic hinge design for easy adjustment.
Ergonomic camber fitting head shape,
Suitable for more face shapes,Constantly improve the comfort of wearing


Elastic hinge
The super-elastic and flexible hinge can significantly reduce the clamping feeling of the temples,Reduce frame distortion and provide the same comfort for all-weather wear.
Innovation and self-development
Coupled automatic switch machine
Small operations do bigthings
Micro-transparent texture The beauty of crafts manship

Power on
Open the temples and the glasses will automatically power on.
Power off
Close the temples and the glasses will automatically power off

Intelligent controlDouble-sidedsliding touch sensor
The raised line design on the shell improves the blind touch experience.During use, you don't need to take
out your phone frequently,and the multi-functions can bereached with one touch.
Left touch area:
Increase the volume:Slide forward in the touch area ofleft leg
Reduce the volume:
Slide back in the touch area of the left leg
Longpressingthe lraised line ofthe left leg:
Activate the voice assistant
Incoming call:
1.Answer the call: Swipe in the touch area ofthe left or rightleg to answer the call
2.Hangup: Long press the raised line of thelegto hangup the phone
Better fit the curvature of the head ergonomic design
The ends of the temples are ergonomically designed Fits the shape of the head like traditional glasses,lmprove wearing comfort.
Technology,Withstand wind and waves