Smart glasses with magnetic lens Multifunctional glasses Thin flagship
① 5.3 chipset ② 360°stereo ③ Magnetic lens ④ Noise reduction ⑤ Automatic switch

Withinnovative technologyCreate ra slim gift 」
Create slim temple design,
Solve the problem of body width and weight,Bringsmart glasses to sensorless wear.For you who want to try smart glasses.

160mm?large soundrangePleasant to the ears
Enjoy an immersive listeningexperiencewith nothingin your ears.
Open listeningdesign preserves clarityand enhances layering.Equipped with a 160mm?super-large sound range,it brings the surging spatial stereo sound to the ears.

Lighter this timeEasy to wear
The temple shell is made ofTR90 material Bothlight and resilient
~35g The whole machine is as light as
Light weight design
Innovation and self-development Coupled automatic switch machine Small operations do big things

Power on
Open the temples and the glasses will automatically power on.

Power off
Close the temples and the glasses will automatically power off.
Micro-transparent texture
The beauty of craftsmanship

Intelligent controlDouble-sidedsliding touch sensor
The raised line design on the shell improves the blind touch experience.During use, you don't need to take
out your phone frequently,and the multi-functions can bereached with one touch.
Left touch area:
Increase the volume:Slide forward in the touch area ofleft leg
Reduce the volume:
Slide back in the touch area of the left leg
Longpressingthe lraised line ofthe left leg:
Activate the voice assistant
Incoming call:
1.Answer the call: Swipe in the touch area ofthe left or rightleg to answer the call
2.Hangup: Long press the raised line of thelegto hangup the phone
Better fit the curvature of the head ergonomic design
The ends of the temples are ergonomically designed Fits the shape ofthe head like traditional glasses lmprove wearing comfort.
Technology,Withstand wind and waves
Classic three-stage waterproof design,Waterproof seals are segmented by area to reduce water vapor penetration.Easily cope with all kinds of waterproof life
Sufficient power long-lasting battery life
Magnetic charging,the connector has its own magnetic force,which can automatically absorb the temples in place.Dual battery design,the power can be used at any time,Make charging more convenient,

Temple materials: TR90,Micro-transparent
Bluetooth : V5.3
Power on/off : Coupling switch
Batterycapacity: 90mAh*2
Charging time : ~1.5hours
Usage time : ~6hours
Compatible system : ioS/Android

