Fabricante OEM/ODM de óculos inteligentes · Shenzhen, China +86 19835872450 sales@cynrin.com

Core Technology · Child Eye Care

Proteção para uso à distância

Child distance protection uses sensing and firmware logic to detect when a child’s viewing distance is too close and gives a gentle reminder, helping build healthier viewing habits. Parents can see behavior trends in the companion app.

Child-sized pink smart glasses with distance protection for healthy viewing habits
Gentle reminders, parent visibility

Visão Geral

Smart viewing-distance alerts

Children often hold reading material and screens closer than recommended. Distance-protection eyewear embeds sensing into familiar-looking kids’ frames, watches viewing distance during near-work and reminds the child to sit back before eye strain builds.

  • Real-time distance sensing. Proximity sensing estimates viewing distance during reading and homework.
  • Gentle, repeatable reminders. Light or sound alerts nudge the child without interrupting concentration.
  • Parent visibility. The companion app summarizes usage and posture trends for parents rather than shaming the child.

Sensing method, alert types and data handling are platform-specific; kids’ programs also include material-safety and certification scoping for the target market.

Blocos de construção de engenharia

Elementos centrais que nossas equipes ajustam em conjunto ao disponibilizar essa capacidade em uma plataforma.

Real-time proximity sensingGentle timed remindersParent trend summaryKids-material compliance

Como funciona

A cadeia de ponta a ponta

Desde o input até à experiência do usuário, projetada como um único sistema em vez de módulos empilhados.

1 Etapas

Sensing

Proximity sensors in the frame estimate the distance between the face and the reading surface.

2 Etapas

Reminder logic

Firmware tracks sustained too-close viewing and triggers a gentle timed reminder.

3 Etapas

Parent summary

Trends are summarized in the companion app for parents, with privacy-conscious data handling.

No interior da tecnologia

Como as peças se encaixam

Uma visão estrutural da capacidade. Os valores dependentes da configuração são confirmados por programa, em vez de serem publicados como números genéricos de destaque.

Moldura em tamanho infantil Perto demais Distância saudável Sinal luminoso / sonoro suave Aplicativo para pais tendências semanais de postura
Proteção para uso à distância — arquitetura funcional (ilustrativa, não à escala).
SensingProximity sensing in the frame estimates face-to-reading-surface distance during near-work.
ReminderFirmware reacts to sustained too-close viewing with gentle, non-shaming light or sound cues.
Program detailThreshold logic, age-group tuning and kids’ material-safety scope confirmed per program.

Plataformas

Pontos de partida comprovados para sua linha

Configurações de plataforma que entregam essa capacidade para programas OEM, ODM e de marca própria.

Perguntas frequentes

Proteção para uso à distância FAQ

At what distance does it alert?
The reminder threshold and timing are firmware parameters tuned to the platform and the intended age group; the default logic and customization options are shared in the program documentation.
What child-safety certifications apply?
Kids’ electronics require market-specific material-safety and electronics compliance. Requirements are scoped to your destination markets and confirmed per program, following the same process described on the certifications page.

Integre esta tecnologia à sua linha de óculos

Informe-nos seu mercado-alvo e seus requisitos de plataforma. A equipe de engenharia responderá com uma proposta de configuração, escopo de personalização e rota de amostragem.

Conversar no WhatsApp
A sua experiência neste site será melhorada ao permitir cookies.