Fabricante OEM/ODM de óculos inteligentes · Shenzhen, China +86 19835872450 sales@cynrin.com

Core Technology · Interaction

Controle por toque

A capacitive touch surface on the temple turns natural taps and swipes into controls for capture, calls, playback and navigation — no phone in hand. Gesture recognition, false-touch filtering and feedback are tuned together.

Fingertip tapping the capacitive touch strip on a matte-black glasses temple
Tap and swipe, by feel

Visão Geral

Intuitive temple touch interaction

Once information and audio live on the glasses, users need a way to control them without reaching for a phone. A temple-mounted touch surface maps familiar gestures — tap, double-tap, swipe forward and back — to the actions users use most.

  • Eyes- and hands-free control. Capture a photo, answer a call or skip a track by feel, even while riding or working.
  • False-touch filtering. Capacitive tuning distinguishes deliberate gestures from adjusting the glasses, helmet contact and sweat.
  • Consistent gesture language. The same gestures work across camera and audio platforms, with haptic or audio confirmation.

Exact gesture mappings and sensitivity are part of firmware configuration and can be reviewed in ODM programs.

Smart glasses temple detail showing the integrated touch and acoustic area
One gesture language runs across camera and audio platforms.
Tap & double-tapSwipe forward / backFalse-touch filteringAudio & haptic confirmation

Como funciona

A cadeia de ponta a ponta

Desde o input até à experiência do usuário, projetada como um único sistema em vez de módulos empilhados.

1 Etapas

Capacitive sensing

A touch-sensitive area on the temple detects tap and swipe input through the frame material.

2 Etapas

Gesture logic

Firmware classifies gestures and rejects accidental contact from handling, headwear and weather.

3 Etapas

Feedback

Audio cues or haptic response confirm actions so users do not need to look at a screen.

No interior da tecnologia

Como as peças se encaixam

Uma visão estrutural da capacidade. Os valores dependentes da configuração são confirmados por programa, em vez de serem publicados como números genéricos de destaque.

Superfície de TOQUE CAPACITIVO Tap Double-tap Swipe back Swipe forward Filtragem de toques indesejados ajustando os óculos · contato com o capacete · suor e chuva rejeitados
Controle por toque — arquitetura funcional (ilustrativa, não à escala).
SensingCapacitive surface under the frame detects tap and swipe gestures through the temple.
LogicFirmware rejects false contact from adjusting the glasses, headwear, sweat and weather.
Program detailGesture mapping and sensitivity are firmware-configurable within ODM programs.

Perguntas frequentes

Controle por toque FAQ

Does the touch surface work with gloves or rain?
Behavior varies by platform and configuration; gesture tuning for sport and work conditions — including sensitivity and false-touch filtering — is discussed per program and validated in reliability testing.
Can gestures be remapped?
A standard gesture set ships on the platform, and firmware-level mapping can be reviewed within ODM programs together with the companion app.

Integre esta tecnologia à sua linha de óculos

Informe-nos seu mercado-alvo e seus requisitos de plataforma. A equipe de engenharia responderá com uma proposta de configuração, escopo de personalização e rota de amostragem.

Conversar no WhatsApp
A sua experiência neste site será melhorada ao permitir cookies.