Fabricante OEM/ODM de óculos inteligentes · Shenzhen, China +86 19835872450 sales@cynrin.com

Core Technology · Optical Display

Optical Waveguide Display

Optical waveguide displays project glanceable information into the lens, keeping navigation, prompts and notifications in the wearer’s line of sight instead of on a phone. Below is how the optical stack is built and integrated; configuration-dependent figures are confirmed per program.

Glowing indigo and violet light traveling through an AR smart-glasses waveguide lens
Micro-display → coupler → waveguide combiner

Visão Geral

AR optical display inside the lens

Smart glasses need to show information without turning the wearer’s attention away from the task. A waveguide display moves that information into the lens: a micro-display generates the image, the waveguide carries and expands it across an optical combiner, and the eye sees a virtual image at a comfortable viewing distance.

  • Eyes-up interaction. Turn-by-turn cues, workflow prompts and notifications are read without looking down at a handset.
  • Balanced as eyewear first. Display brightness, weight balance and lens tinting are co-engineered so the product stays comfortable as everyday glasses.
  • Platform-level integration. The display is engineered together with processor, battery and firmware rather than added as a separate module.

CYNRIN is developing its waveguide-enabled platform family. Detailed field-of-view, brightness and resolution specifications are shared with qualified programs under NDA.

Blocos de construção de engenharia

Elementos centrais que nossas equipes ajustam em conjunto ao disponibilizar essa capacidade em uma plataforma.

Micro-display engineInput & output couplersExit-pupil expansionTinted combiners

Como funciona

A cadeia de ponta a ponta

Desde o input até à experiência do usuário, projetada como um único sistema em vez de módulos empilhados.

1 Etapas

Micro-display engine

Compact display panels generate the source image sized for wearable optics and power budgets.

2 Etapas

Waveguide coupling & expansion

Input and output couplers guide light through the lens and expand the exit pupil for a usable eye box.

3 Etapas

Eyewear integration

Optical combiners, tinting, temple weight and thermal design are tuned together for wearable balance.

No interior da tecnologia

Como as peças se encaixam

Uma visão estrutural da capacidade. Os valores dependentes da configuração são confirmados por programa, em vez de serem publicados como números genéricos de destaque.

MICRO EXIBIÇÃO Microdisplay Coplador de entrada Ondoguia · reflexão interna total Coplador de saída Caixa ocular
Optical Waveguide Display — arquitetura funcional (ilustrativa, não à escala).
Display pathImage generated by a micro-display and carried through the lens by an optical waveguide combiner.
IntegrationProcessor, battery, thermal stack and lens tinting engineered as one platform.
Program detailField of view, brightness and resolution are shared under NDA and confirmed per program.

Plataformas

Pontos de partida comprovados para sua linha

Configurações de plataforma que entregam essa capacidade para programas OEM, ODM e de marca própria.

Perguntas frequentes

Optical Waveguide Display FAQ

Are waveguide displays available on every CYNRIN platform?
No — waveguide display belongs to a separate AR display platform family. Camera and audio platforms (V03-T5, E13, K01) do not include an in-lens display. Platform availability is confirmed per program.
Can the display UI be branded and customized?
Yes. Within ODM programs, firmware identity, pairing name, companion-app branding and elements of the display UI can carry your brand; customization scope is agreed before tooling. See the ODM service.

Integre esta tecnologia à sua linha de óculos

Informe-nos seu mercado-alvo e seus requisitos de plataforma. A equipe de engenharia responderá com uma proposta de configuração, escopo de personalização e rota de amostragem.

Conversar no WhatsApp
A sua experiência neste site será melhorada ao permitir cookies.