OEM/ODM-fabrikant van slimme brilmonturen · Shenzhen, China +86 19835872450 sales@cynrin.com

Core Technology · Interaction

Aanraakbediening

A capacitive touch surface on the temple turns natural taps and swipes into controls for capture, calls, playback and navigation — no phone in hand. Gesture recognition, false-touch filtering and feedback are tuned together.

Fingertip tapping the capacitive touch strip on a matte-black glasses temple
Tap and swipe, by feel

Overzicht

Intuitive temple touch interaction

Once information and audio live on the glasses, users need a way to control them without reaching for a phone. A temple-mounted touch surface maps familiar gestures — tap, double-tap, swipe forward and back — to the actions users use most.

  • Eyes- and hands-free control. Capture a photo, answer a call or skip a track by feel, even while riding or working.
  • False-touch filtering. Capacitive tuning distinguishes deliberate gestures from adjusting the glasses, helmet contact and sweat.
  • Consistent gesture language. The same gestures work across camera and audio platforms, with haptic or audio confirmation.

Exact gesture mappings and sensitivity are part of firmware configuration and can be reviewed in ODM programs.

Smart glasses temple detail showing the integrated touch and acoustic area
One gesture language runs across camera and audio platforms.
Tap & double-tapSwipe forward / backFalse-touch filteringAudio & haptic confirmation

Hoe het werkt

De end-to-end keten

Van input tot gebruikerservaring, ontworpen als één systeem in plaats van gestapelde modules.

1 Stap

Capacitive sensing

A touch-sensitive area on the temple detects tap and swipe input through the frame material.

2 Stap

Gesture logic

Firmware classifies gestures and rejects accidental contact from handling, headwear and weather.

3 Stap

Feedback

Audio cues or haptic response confirm actions so users do not need to look at a screen.

In de technologie

Hoe de onderdelen bij elkaar passen

Een structureel overzicht van de mogelijkheden. Configuratieafhankelijke cijfers worden per programma bevestigd en niet als algemene hoofdcijfers gepubliceerd.

CAPACITIEVE AANRAAKVLAKTE Tap Double-tap Swipe back Swipe forward Foutieve-aanrakingenfiltering het aanpassen van de bril · contact met de helm · afstoten van zweet en regen
Aanraakbediening — functionele architectuur (illustratief, niet op schaal).
SensingCapacitive surface under the frame detects tap and swipe gestures through the temple.
LogicFirmware rejects false contact from adjusting the glasses, headwear, sweat and weather.
Program detailGesture mapping and sensitivity are firmware-configurable within ODM programs.

FAQ

Aanraakbediening FAQ

Does the touch surface work with gloves or rain?
Behavior varies by platform and configuration; gesture tuning for sport and work conditions — including sensitivity and false-touch filtering — is discussed per program and validated in reliability testing.
Can gestures be remapped?
A standard gesture set ships on the platform, and firmware-level mapping can be reviewed within ODM programs together with the companion app.

Integreer deze technologie in uw brillenlijn

Geef ons uw doelmarkt en platformvereisten door. De afdeling engineering zal reageren met een configuratievoorstel, een overzicht van de aanpassingsmogelijkheden en het proces voor het maken van monsters.

Chatten op WhatsApp
Uw ervaring op deze site wordt verbeterd door cookies toe te staan.