OEM/ODM-tillverkare av smarta glasögon · Shenzhen, Kina +86 19835872450 sales@cynrin.com

Core Technology · Interaction

Pekkontroll

A capacitive touch surface on the temple turns natural taps and swipes into controls for capture, calls, playback and navigation — no phone in hand. Gesture recognition, false-touch filtering and feedback are tuned together.

Fingertip tapping the capacitive touch strip on a matte-black glasses temple
Tap and swipe, by feel

Översikt

Intuitive temple touch interaction

Once information and audio live on the glasses, users need a way to control them without reaching for a phone. A temple-mounted touch surface maps familiar gestures — tap, double-tap, swipe forward and back — to the actions users use most.

  • Eyes- and hands-free control. Capture a photo, answer a call or skip a track by feel, even while riding or working.
  • False-touch filtering. Capacitive tuning distinguishes deliberate gestures from adjusting the glasses, helmet contact and sweat.
  • Consistent gesture language. The same gestures work across camera and audio platforms, with haptic or audio confirmation.

Exact gesture mappings and sensitivity are part of firmware configuration and can be reviewed in ODM programs.

Smart glasses temple detail showing the integrated touch and acoustic area
One gesture language runs across camera and audio platforms.
Tap & double-tapSwipe forward / backFalse-touch filteringAudio & haptic confirmation

Så fungerar det

Kedjan från början till slut

Från insamling av data till användarupplevelsen, utformad som ett enda system snarare än staplade moduler.

1 Steg

Capacitive sensing

A touch-sensitive area on the temple detects tap and swipe input through the frame material.

2 Steg

Gesture logic

Firmware classifies gestures and rejects accidental contact from handling, headwear and weather.

3 Steg

Feedback

Audio cues or haptic response confirm actions so users do not need to look at a screen.

Inuti tekniken

Hur delarna passar ihop

Ett strukturellt sätt att se på kapaciteten. Konfigurationsberoende siffror bekräftas per program snarare än att publiceras som generella övergripande värden.

KAPACITIVT KÄNSLYTT UNDERLAG Tap Double-tap Swipe back Swipe forward Falskt-känslig filtrering justering av glasögonen · hjälmtillslutning · svett och regn avvisas
Pekkontroll — funktionell arkitektur (schematisk, inte i skala).
SensingCapacitive surface under the frame detects tap and swipe gestures through the temple.
LogicFirmware rejects false contact from adjusting the glasses, headwear, sweat and weather.
Program detailGesture mapping and sensitivity are firmware-configurable within ODM programs.

Vanliga frågor

Pekkontroll FAQ

Does the touch surface work with gloves or rain?
Behavior varies by platform and configuration; gesture tuning for sport and work conditions — including sensitivity and false-touch filtering — is discussed per program and validated in reliability testing.
Can gestures be remapped?
A standard gesture set ships on the platform, and firmware-level mapping can be reviewed within ODM programs together with the companion app.

Bygg in denna teknik i din glasögonlinje

Tala om för oss din målgrupp och dina plattformskrav. Ingenjörerna återkommer med ett konfigurationsförslag, information om anpassningsmöjligheter och hur provtagningen går till.

Chatta på WhatsApp
Din upplevelse på denna webbplats kommer att förbättras genom att tillåta cookies.