Smart eyewear OEM/ODM manufacturer · Shenzhen, China +86 19835872450 sales@cynrin.com

Core Technology · Optical Display

Optical Waveguide Display

Optical waveguide displays project glanceable information into the lens, keeping navigation, prompts and notifications in the wearer’s line of sight instead of on a phone. Below is how the optical stack is built and integrated; configuration-dependent figures are confirmed per program.

Glowing indigo and violet light traveling through an AR smart-glasses waveguide lens
Micro-display → coupler → waveguide combiner

Overview

AR optical display inside the lens

Smart glasses need to show information without turning the wearer’s attention away from the task. A waveguide display moves that information into the lens: a micro-display generates the image, the waveguide carries and expands it across an optical combiner, and the eye sees a virtual image at a comfortable viewing distance.

  • Eyes-up interaction. Turn-by-turn cues, workflow prompts and notifications are read without looking down at a handset.
  • Balanced as eyewear first. Display brightness, weight balance and lens tinting are co-engineered so the product stays comfortable as everyday glasses.
  • Platform-level integration. The display is engineered together with processor, battery and firmware rather than added as a separate module.

CYNRIN is developing its waveguide-enabled platform family. Detailed field-of-view, brightness and resolution specifications are shared with qualified programs under NDA.

Engineering building blocks

Core elements our teams tune together when shipping this capability on a platform.

Micro-display engineInput & output couplersExit-pupil expansionTinted combiners

How it works

The end-to-end chain

From input to user experience, engineered as one system rather than stacked modules.

1 Step

Micro-display engine

Compact display panels generate the source image sized for wearable optics and power budgets.

2 Step

Waveguide coupling & expansion

Input and output couplers guide light through the lens and expand the exit pupil for a usable eye box.

3 Step

Eyewear integration

Optical combiners, tinting, temple weight and thermal design are tuned together for wearable balance.

Inside the technology

How the pieces fit together

A structural view of the capability. Configuration-dependent figures are confirmed per program rather than published as generic headline numbers.

MICRO DISPLAY Micro-display Input coupler Waveguide · total internal reflection Output coupler Eye box
Optical Waveguide Display — functional architecture (illustrative, not to scale).
Display pathImage generated by a micro-display and carried through the lens by an optical waveguide combiner.
IntegrationProcessor, battery, thermal stack and lens tinting engineered as one platform.
Program detailField of view, brightness and resolution are shared under NDA and confirmed per program.

Platforms

Proven starting points for your line

Platform configurations that ship this capability for OEM, ODM and private-label programs.

FAQ

Optical Waveguide Display FAQ

Are waveguide displays available on every CYNRIN platform?
No — waveguide display belongs to a separate AR display platform family. Camera and audio platforms (V03-T5, E13, K01) do not include an in-lens display. Platform availability is confirmed per program.
Can the display UI be branded and customized?
Yes. Within ODM programs, firmware identity, pairing name, companion-app branding and elements of the display UI can carry your brand; customization scope is agreed before tooling. See the ODM service.

Build this technology into your eyewear line

Tell us your target market and platform requirements. Engineering will reply with a configuration proposal, customization scope and sampling path.

Chat on WhatsApp
Your experience on this site will be improved by allowing cookies.