Smart eyewear OEM/ODM manufacturer · Shenzhen, China +86 19835872450 sales@cynrin.com
CAREERS AT CYNRIN

Build the next computing interface

Smart glasses are a hardware problem before they are anything else: electronics that fit behind a hinge, optics measured to a degree, firmware that ships and keeps shipping. If you want to solve those problems on products that reach real customers in forty-plus markets, this is where you do it.

  • Ship work in production volumes, not demo units
  • Work across EE, firmware, optics, ID and manufacturing in one building
  • Direct contact with overseas brands and their product teams
Shenzhen · Guangdong · ChinaCYNRIN engineering and commercial teams working at the Shenzhen office
Cross-functional engineering and sales team meeting at CYNRIN
WHY CYNRIN

A product company that happens to run a factory

CYNRIN is the smart-glasses manufacturing brand of Shenzhen Kingring Technology Co., Ltd. Unlike trading companies that resell whatever the nearest line produces, we engineer the reference platforms — V03-T5, E13, K01 — and then manufacture them for brands worldwide. R&D sits minutes from the SMT floor, so a firmware fix can be validated on hardware the same afternoon.

We hire people who want the full loop: spec, prototype, pilot, mass production, field feedback, next generation. Roles are based at our Shenzhen facility; English is the working language for customer-facing work.

1 siteR&D and manufacturing co-located in Shenzhen
6 stagesSMT to packing owned in-house
40+ marketswhere CYNRIN-built products are sold
12 monthswarranty programs teams stand behind
WHERE YOU FIT

Teams and departments

Engineering depth meets production discipline. Every department is staffed around the same goal: repeatable, shippable smart glasses for demanding overseas customers.

01

R&D — Electronics (EE)

Mainboard and flex PCB architecture, BLE audio/camera SoCs, power management, sensors and high-speed signal work from EVT through mass production.

02

R&D — Firmware & App

Embedded firmware, OTA channels, voice and camera features, and the companion-app integration branded customers rely on after launch.

03

R&D — Optical & Acoustic

Lens geometry, transmittance and UV400 validation on optical benches, plus speaker and microphone tuning on acoustic fixtures.

04

Industrial Design (ID)

Frame architecture, materials (TR90, nylon, metal), color and finish, CMF direction and DFM collaboration with the tooling shop.

05

Manufacturing & Quality

SMT and assembly process engineering, AOI/ICT fixtures, aging, AQL inspection and reliability engineering.

06

Supply Chain & Planning

Component sourcing, reel-level traceability, vendor management, capacity planning and export logistics.

07

Sales & Account Management

English-language ownership of OEM/ODM accounts, RFQ coordination, trade-show programs and reorder relationships.

08

Design & Packaging

Retail packaging structure, dielines, unboxing direction and localized collateral for global retail and FBA channels.

HOW WE SUPPORT YOU

Compensation, growth and daily life

Market-aligned package

Base salary, project performance incentives and social insurance in line with Shenzhen manufacturing-industry standards.

Real equipment, real labs

Shielded RF room, optical benches, acoustic fixtures, 3D printing and SMT lines on site — not rented for visitor tours.

Learning budget

Certification and training support for quality, engineering and compliance methods such as Six Sigma, ISO 9001 auditing and lab techniques.

International exposure

Direct work with brands across the EU, North America, the Middle East and APAC, plus support for IFA, GITEX and Hong Kong Electronics Fair travel.

Health-first workplace

ESD-controlled workcells, annual health check support and structured safety training across factory and lab environments.

Predictable rhythm

Project-based schedules with defined EVT/DVT/PVT gates instead of perpetual crunch; overtime is the exception, not the operating model.

GROWTH PATH

Learning that follows the product lifecycle

You will not be parked on one station. Engineers and commercial hires rotate through the phases that matter, with senior review at every gate.

Onboarding (0–30 days)

Product platform training across V03-T5/E13/K01, ESD and safety certification, and a named mentor from your department.

Gate discipline (1–3 months)

Shadow EVT, DVT and PVT reviews and learn the inspection and documentation standards behind ISO 9001 production.

Owned scope (3–12 months)

Own a module, process or account end to end, with your work visible in samples and mass-production builds.

Senior track (12+ months)

Technical specialist or project-lead paths, including customer-facing and trade-show responsibilities for qualified engineers.

LIFE AT CYNRIN

Off the org chart

CYNRIN team in a cross-functional program review
Program reviews

Hardware people in one room

EE, firmware, ID, quality and sales review programs together — decisions reach the line the same day.

Open office area at CYNRIN Shenzhen headquarters
Shenzhen office

Minutes from the factory floor

R&D, sales and production planning share one site in the world’s electronics supply-chain hub.

Engineers working with test equipment in the CYNRIN R&D lab
R&D labs

Bench time, not slide time

RF, optical and acoustic validation runs continuously as new platforms and customer programs progress.

CYNRIN team at an international consumer electronics trade show
Trade shows

Meet the market directly

Team members join IFA, GITEX and Hong Kong Electronics Fair programs and hear customer feedback first hand.

OPEN ROLES

Current openings

All positions are based at our Shenzhen facility. There is no HR inbox yet — applications route through our main company mailbox and are forwarded directly to the hiring manager. Include the role title in the subject line.

Firmware Engineer

R&D · EmbeddedShenzhen, on-siteApply by email

Optical Engineer

R&D · OpticsShenzhen, on-siteApply by email

Sales Account Manager (Overseas)

Sales & AccountsShenzhen, on-siteApply by email

SMT Process Engineer

ManufacturingShenzhen, on-siteApply by email

Industrial Designer (ID)

Design · ID/CMFShenzhen, on-siteApply by email

QC Engineer

Manufacturing · QualityShenzhen, on-siteApply by email

Don’t see your role? Speculative applications from EE, firmware, optics and quality engineers are welcome at sales@cynrin.com.

HOW WE HIRE

A clear, technical process

1. Application

Send an English CV to sales@cynrin.com with the role title in the subject. Hiring managers review within five working days.

2. Technical interview

One video or on-site interview with your future team lead: real engineering or account problems, not brain teasers.

3. Practical assessment

A short, role-relevant task — a firmware bug analysis, optical tolerance question, process case or customer email reply.

4. Final & offer

A conversation with department management, followed by a written offer with role scope, package and start date.

Interview logistics, relocation questions and accommodations: mention them in your email and we will respond directly.

Want your work inside products sold in 40+ markets?

Send your CV and the role you want to sales@cynrin.com. A hiring manager reads every application.

Chat on WhatsApp
Your experience on this site will be improved by allowing cookies.