Smart eyewear OEM/ODM manufacturer · Shenzhen, China +86 19835872450 sales@cynrin.com
COMPLIANCE & CERTIFICATION

Smart Glasses Certifications & Regulatory Compliance

Wireless smart glasses are radio equipment with lithium batteries: they enter the EU under the RED, the US under FCC rules, and cross borders under air/sea battery regulations. CYNRIN prepares the tests, coordinates the third-party laboratories and delivers certificates held in your brand name, with a technical file your compliance team can defend.

CERTIFICATION SCOPE

The marks a smart-glasses program actually uses

CYNRIN programs are routinely prepared for the following approvals. Marks are issued by independent third-party laboratories and notified bodies — we manage samples, test plans and technical documentation on your behalf.

CERED 2014/53/EUFCCPart 15 / supplier DoCRoHSRoHS 2.0 (EU) 2011/65/EUREACHSVHC declarationUKCAUK market, post-Brexit

Certification is scheduled into the NPI plan, not improvised after production: in-house pre-scan data from the RF and reliability labs feeds the formal test plan at DVT, and final units from the PVT pilot build are the samples shipped to the third-party lab. This sequencing avoids the most common delay in eyewear electronics — retesting because the certified unit did not match the mass-produced unit. See how this connects to the R&D stage-gate process.

RadioEMCSafetyChemicalBattery transportBrand-owned certificates
WIRELESS & PRODUCT SAFETY

Regulatory approvals for the EU and United States

European Union — CE marking

RequirementDirective / standard familyWhat is assessed
CE — Radio Equipment DirectiveRED 2014/53/EU (Articles 3.1a, 3.1b, 3.2)Safety/health, EMC and effective use of radio spectrum for the Bluetooth radio
EMC test reportEN 55032 / EN 55035 familyRadiated/conducted emissions and immunity of the complete device
RF / radio test reportEN 300 328 (2.4 GHz) familyTransmitter parameters, spurious emissions and adaptive behavior
Safety assessmentEN IEC 62368-1 familyElectrical and thermal safety of the charger, battery and electronics
EU Declaration of ConformityIssued by the brand (manufacturer of record)Single declaration referencing all applied directives and harmonized standards

United States — FCC & product safety

RequirementRule / standard familyWhat is assessed
FCC compliance (intentional radiator)FCC Part 15, Subpart C (and applicable Subpart B)2.4 GHz transmitter certification or supplier declaration path, depending on module architecture
FCC labeling & user informationPart 15 labeling requirementsDevice label text, manual notices and modular transmitter conditions
Battery & consumer-product safetyCPSC jurisdiction; UL-style cell evidenceLithium-polymer cell safety evidence and consumer-product hazard due diligence
Customs / import fileFCC supplier declaration documentationImporter of record must hold test reports and identification of the responsible US party

Exact standard editions and test routes are confirmed at program kickoff against the selected SoC and radio module; the engineering team provides a market-specific test plan.

ENVIRONMENTAL & CHEMICAL

RoHS, REACH and material declarations

Frame plastics, lens coatings, solders, adhesives and battery cells all fall under restricted-substance rules. Material declarations are collected from the controlled supplier base and compiled per finished SKU.

RequirementMarketPractice on CYNRIN programs
RoHS 2.0 (2011/65/EU amended)EU / widely referenced globallyRestricted-substance declarations per homogeneous material; supporting test evidence retained in the TCF
REACH SVHCEUSVHC screening against the current candidate list; article information supplied above the 0.1% threshold
Prop 65-style assessmentsCalifornia, USMaterial review for listed substances on request, with label guidance where the brand elects assessment
UKCA markingUnited KingdomUK Radio Equipment Regulations, EMC Regulations and Restriction of Use of Certain Hazardous Substances Regulations
Battery & WEEE-style labelingEU member statesCrossed-out wheeled bin marking and producer-responsibility registration handled by the brand as importer; CYNRIN supplies required artwork data

These declarations follow the product: if your program re-uses a CYNRIN reference platform, the underlying material evidence already exists and only the SKU-specific declaration needs compiling. Custom-tooled materials are tested as part of the DVT gate. Our quality system maintains the supplier evidence chain behind every declaration.

Export cartons marked for lithium battery shipment at CYNRIN warehouse
BATTERY TRANSPORT

UN38.3, MSDS and PI966/PI967 for lithium-polymer shipments

Every CYNRIN smart-glasses unit contains a lithium-polymer cell, so export cartons move under dangerous-goods rules. Before the first shipment we prepare the battery file your forwarder will ask for:

  • UN38.3 summary — the cell/battery test summary covering altitude, thermal, vibration, shock, short circuit and overcharge testing from the cell supplier.
  • MSDS / SDS — safety data sheet for the battery and finished goods, issued in English for the shipper and importer.
  • PI966 vs PI967 — Packing Instruction 966 applies to batteries packed with equipment; PI967 applies to batteries contained in equipment (the usual case for finished glasses assembled with cells inside).
  • Carton marks — lithium-battery handling label, watt-hour and net-cell-weight statements on the master carton as applicable.
  • Courier/air acceptance — documents accepted for air and sea freight, FBA inbound and express shipment.

Incoterms and delivery handling are described on the shipping & logistics page (EXW, FOB Shenzhen, CIF and DDP supported).

HOW CERTIFICATION RUNS

Four steps from pre-scan to certificate in your name

1

1. In-house pre-scan

RF, EMC and acoustic pre-compliance data is captured in the CYNRIN shielded lab using the same test methods the external lab will apply. High-risk failures are fixed before external fees start.

2. Third-party laboratory

We book and ship PVT-identical samples to an accredited lab (TUV, SGS, Intertek/Bureau Veritas style), manage the test plan, and engineering responds to technical questions directly.

3. Certificate in YOUR brand

The application is filed in the brand-owner name — you are the certificate holder, not CYNRIN. For FCC paths the responsible US party and grantee details are settled before filing.

4. Technical file (TCF)

Reports, declarations, schematics, BOM, labels and user manual are compiled into a Technical Construction File index and handed over with the DoC for your records and customs file.

Engineer running RF pre-scan on smart glasses in a shielded chamber

Indicative certification timeline

Week 0

DVT release

Pre-scan data reviewed; market list, brand-owner details and label artwork confirmed in the certification plan.

Weeks 1–2

Lab intake

PVT-built samples and documentation delivered to the third-party laboratory; test schedule booked in the program plan.

Weeks 3–5

Testing & TCF

RF, EMC, safety and chemical testing; CYNRIN engineering answers lab queries and compiles the technical file in parallel.

Weeks 5–6

Certificates issued

Reports and certificates released in the brand name, DoC signed by the brand, labels and manuals released to mass production.

Durations are indicative for a single market on a pre-scan-passing design; multi-market filings typically run in parallel, and re-tests after design change are the main schedule risk. Compliance staff shown below coordinate sample logistics with your team.

CYNRIN compliance and customer-support team preparing documentation packages
Aging and burn-in racks whose lot data supports reliability documentation
Retail packaging carrying regulatory marks and battery labels
DOCUMENTATION DELIVERABLES

The compliance handover package

  • Third-party test reports — RF, EMC and safety reports from the accredited laboratory, listing your product and brand.
  • Certificates / grant filings — CE-RED evidence package and, where applicable, the FCC grant issued to the brand owner.
  • Declaration of Conformity — draft DoC prepared for the brand to sign and date as manufacturer of record.
  • TCF index — technical construction file index: schematics, BOM, block diagrams, antenna spec, risk assessment and supplier declarations.
  • RoHS / REACH declarations — per-SKU material declarations with the supplier evidence behind them.
  • Battery file — UN38.3 summary, MSDS/SDS and packing-instruction documents for the shipper.
  • Labels & manuals — regulatory label artwork and localized user-manual compliance sections.

Brand-owned certificates: certificates and grants name your company, so they survive a change of manufacturing partner and support retailer onboarding, Amazon compliance uploads and distributor audits. For programs built on shared CYNRIN platforms, underlying test evidence can be referenced under documented permission, while the finished-goods certificate remains yours.

CERTIFICATION FAQ

Questions compliance and procurement teams ask

Which certifications do smart glasses need to sell in the EU?
They must carry CE marking under the Radio Equipment Directive 2014/53/EU (safety, EMC and radio spectrum), be supported by RoHS and REACH material declarations, and ship with a signed EU Declaration of Conformity and a technical file. Importers also handle WEEE/battery producer registration nationally; CYNRIN supplies the technical data they require.
What FCC approval is needed for smart glasses in the US?
Smart glasses with Bluetooth are intentional radiators under FCC Part 15. The exact route (certification with a grant vs. supplier declaration) depends on the radio-module architecture chosen for your product. Our compliance plan settles the grantee and the responsible US party before samples go to the lab.
What are UN38.3, MSDS and PI966/PI967 for?
UN38.3 is the lithium-battery test summary required before air or sea transport; the MSDS/SDS describes battery handling for shippers and importers; IATA Packing Instructions 966 (batteries packed with equipment) and 967 (batteries contained in equipment) govern carton configuration. Finished CYNRIN glasses ship predominantly under PI967 with the cells installed.
Who owns the certificates — CYNRIN or our brand?
Your brand owns them. Applications are filed in the brand-owner name and the certificate holder is your company; CYNRIN is the engineering and manufacturing partner behind the file. You can therefore present the certificates to retailers, change manufacturing arrangements later, and keep the compliance asset on your balance sheet.
How long does smart glasses certification take?
When pre-scan results are clean and samples come from a PVT-identical build, a single-market filing is typically completed in roughly five to six weeks, including the technical file. EU and US filings can run in parallel on the same sample set. Failures found at the external lab are the main cause of slippage, which is exactly what the in-house pre-scan is designed to prevent.
Can you provide compliance documents for Amazon FBA and retail onboarding?
Yes. The handover package is built for exactly this use: test reports, DoC, product labels, battery documents and product imagery are provided in the formats Amazon and major retailers request, and we supply FCC/FBA naming details on request. Packaging and carton labeling details are on the shipping logistics page; download requests go through support & downloads.

Launching in the EU, US or both? Ask for the certification plan.

Tell us your target markets and sales channels in the RFQ form. Compliance engineering returns a market-by-market test plan, timeline and document list.

Chat on WhatsApp
Your experience on this site will be improved by allowing cookies.