Smart eyewear OEM/ODM manufacturer · Shenzhen, China +86 19835872450 sales@cynrin.com
SAMPLE POLICY

Evaluate Real Smart Glasses Before You Commit a PO

Every CYNRIN program starts with hardware in your hands: functional catalog units, branded pre-production samples, a sealed golden sample, or engineering EVT builds for custom ODM. Sample fees are charged honestly and credited back against the first production order.

CYNRIN smart glasses sample kit with case, cable and documentation
Refund rulecredited against mass production
3 sample tracksfunctional · branded · ODM/EVT
5–15 dayssample build before shipping
3–5 daysDHL / FedEx door to door
100% deductiblesample fee credited on first PO
WHY IT MATTERS

A spec sheet does not answer fit, sound or camera questions

Smart glasses are worn for hours and judged in seconds. Weight on the nose, open-ear leakage at a café table, handshake distance for the camera, app pairing behavior and hinge feel can only be judged on real units. The sample phase exists to move those judgments before tooling and deposits — not after 5,000 cartons arrive.

5–7 daysfunctional catalog samples
10–15 daysbranded pre-production builds
1.5–3×sample price vs mass unit price
0 net costwhen the first PO is placed

We recommend the sequence most brands actually use: order a functional catalog sample first to evaluate the platform, release a branded pre-production unit for internal and buyer sign-off, then seal one golden sample that becomes the contractual standard for mass production and AQL inspection.

SAMPLE TYPES

Four sample stages, each with a different job

Choose the stage that matches the decision in front of you. The stages are sequential in a healthy program, not an upsell ladder.

Functional smart glasses catalog model laid flat with accessories
Stage 1 · 5–7 days

Functional / catalog sample

A sealed unit from current production: factory color and firmware, no custom marking. Used to judge fit, weight, audio, camera, battery life, app pairing and call quality. MOQ is one unit per model; most customers order two to compare wear positions.

Branded smart glasses pre-production sample with custom packaging mockup
Stage 2 · 10–15 days

Branded pre-production sample

Your logo marked by the actual production process (laser or pad print), your pantone-matched color finish, boot screen and pairing name where supported, plus a packaging mockup. This is the unit for retail buyer meetings, marketing photography and compliance file review.

Golden sample smart glasses sealed and signed for mass production reference
Stage 3 · sign-off

Golden sample

One approved, signed and sealed unit held by both parties. It defines the mass-production standard for appearance, marking, firmware, accessories and packaging; final AQL inspection is measured against it. No bulk order runs without a golden sample on the line.

Custom ODM engineering prototype with 3D printed frame on test bench
Stage 4 · 30–60 days

ODM engineering sample (EVT)

For co-developed programs: custom PCBA bring-up with 3D/CNC mechanicals, verified against the agreed specification — RF, audio, camera geometry and thermal behavior. EVT precedes tooling; DVT and PVT builds follow as described on the ODM page.

SAMPLE FEES

What samples cost, and how the money comes back

Sample pricing is deliberately simple: the unit carries the real cost of a non-automated build, freight is charged at the courier rate, and the sample fee returns to you as a deduction from the first production PO. No fictional $X placeholders — this is the policy applied to every customer.

ChargeHow it is calculatedRefundable?
Sample unit price1.5–3× the forecast mass-production unit price, depending on model and configuration; small-lot PCBA, hand assembly and individual testing cost more per unitYes — credited from first PO
Branding on sampleLogo fixture, pad-print/laser setup and custom finish master charged at costYes, for programs reaching the branded MOQ of 1,000 units
FreightFreight collect via your DHL/FedEx account, or prepaid and re-invoiced at the actual courier rate; typically 3–5 working days in transitNo — pass-through cost
Custom ODM EVTEngineering time, custom PCBA and CNC/3D parts quoted per project as NRENRE terms apply; often 50/50 milestone or amortizable
Deduction on POSample fee (excluding freight) deducted from the deposit or balance of the first mass-production order—

MOQ thresholds for the fee credit: 500 units catalog, 1,000 units branded, 3,000–5,000 units custom — see the MOQ page.

HOW IT WORKS

From sample request to golden-sample sign-off

Six steps, typically completed in two to three weeks for a catalog unit and four to six for branded pre-production.

1. Request

Tell us the model, quantity, destination country and any configuration through the RFQ form or sales@cynrin.com — a project engineer replies within two working days.

2. Proforma & payment

You receive a sample proforma with unit price, freight estimate and HS/battery notes; samples are 100% prepaid by T/T, PayPal or Wise.

3. Build & test

Catalog units are pulled and QC-checked in 5–7 days; branded builds go through marking, finish and packaging mockup in 10–15 days.

4. DHL / FedEx shipment

Boxed with MSDS where required, shipped express for 3–5 working days door-to-door with tracking; customs duties, if any, are paid by the receiver.

5. Your evaluation

Run the checklist below — fit, audio, camera, battery, app and certification documents — and send written feedback in one consolidated round.

6. Golden sign-off

The approved configuration is frozen as the golden sample, the mass-production proforma is issued and sample fee is credited against the PO.

WHAT ARRIVES

The sample shipment, unboxed

Samples ship as a complete kit so evaluation matches the retail experience as closely as the stage allows.

Complete smart glasses sample kit with protective case and charging cable
In the box

Glasses, case, cable, guides

The unit, protective case or pouch, charging cable and a printed quick-start card — the same accessories planned for mass production.

Retail packaging mockup for a branded smart glasses sample
Branded stage

Packaging mockup

Branded samples include a structural packaging mockup with your dieline artwork so shelf presence and unboxing can be judged before the bulk print run.

Smart glasses flat lay showing finish, hinges and lens detail
Inspection detail

Finish and build quality

Enough flat lighting and a plain background to inspect hinge action, temple routing, lens transmittance and logo placement up close.

Product team evaluating a smart glasses sample against a checklist
EVALUATION CHECKLIST

What to test in your five days with the sample

  • Fit & comfort — weight distribution after 60 minutes of wear, nose-pad contact, grip during head movement, compatibility with your audience’s face widths and with prescription inserts.
  • Audio — open-ear speaker leakage at arm’s length, microphone clarity on a real call in ambient noise (office, street, wind), latency with video.
  • Camera (camera models) — daylight and low-light stills/video, stabilization, field of view, shutter latency and overheating during continuous recording.
  • Battery & thermal — measured playback and call time against the spec sheet, charging time, frame temperature during long calls or recording.
  • App & firmware — pairing reliability on current iOS and Android phones, firmware OTA, language set and any branded pairing name shown on screen.
  • Certification documents — confirm the CE/FCC/RoHS/REACH dossier scope and UN38.3/MSDS battery documents match your market and sales channel.

Consolidate feedback in one written round referencing the sample serial; engineering responds with what is configuration, what is adjustable before mass production, and what belongs to a custom ODM scope — see ODM development for the latter.

TERMS & REFUND POLICY

The small print, written plainly

01

Sample fee is a deposit, not a margin stream

The sample unit charge (1.5–3× mass price) is deducted from the first PO that reaches the program MOQ. Freight and any optional third-party inspection fees are not credited, because they are costs paid out to carriers and labs.

02

One revision is expected; endless re-sampling is not

Branded samples include one consolidated revision round based on written feedback. Repeated one-at-a-time changes (logo position today, color next week) are re-quoted so the program keeps moving.

03

Custom work follows NRE terms

EVT builds, custom firmware or custom packaging design are project-quoted as NRE; see the commercial structure on the payment terms page, including amortization into unit price.

04

Samples for testing are not for resale

Sample units carry serials and are built for evaluation; they may not be sold as retail stock. Pilot-run units (50–200 pieces) are the correct channel for test-selling.

Building the schedule around samples? Lead times lists every phase; ready to order? Use the sample request form.

SAMPLE FAQ

What procurement and product teams ask first

How do I order a sample and how fast does it ship?
Use the request-a-quote form and choose "Samples or a pilot order first", or email sales@cynrin.com with the model, quantity and destination country. After the sample proforma is settled, functional units build in 5–7 days and branded units in 10–15 days; DHL or FedEx then delivers to most countries in 3–5 working days.
How much do smart glasses samples cost?
Sample units are priced at roughly 1.5–3 times the forecast mass-production unit price, because they are built and tested individually rather than on the production line. Freight is charged at the actual DHL/FedEx rate, collect or prepaid. The sample fee, excluding freight, is deducted in full from your first production PO that meets the program MOQ.
Is the sample fee really refundable?
Yes — it is credited against the deposit or balance of the first mass-production order of 500 units (catalog) or 1,000 units (branded) and above. It is not refunded in cash if no order follows, and freight is not credited because it is a pass-through paid to the courier. The credit appears as a line on the mass-production proforma.
Can I get a sample with my own logo and packaging?
Yes — that is the branded pre-production sample, built in 10–15 days after vector artwork and pantone references are supplied. It carries your logo via the production marking method, your color finish and a packaging mockup. This stage is the correct basis for retail buyer meetings and marketing photography.
What is a golden sample and why does it matter?
The golden sample is the one unit approved, signed and sealed by both parties. It freezes appearance, marking, firmware version, accessories and packaging as the contractual standard, and final AQL inspection at mass production is measured against it. It removes the most common dispute in contract manufacturing: "different from what we approved".
Can samples be shipped with battery inside by air?
Yes. Smart glasses with built-in lithium-polymer cells ship under the applicable IATA lithium-battery provisions, supported by UN38.3 test summaries and MSDS; we provide the documents and book the regulated channel with DHL or FedEx. Customs clearance and import duties in your country remain the receiver’s responsibility under DAP-style courier terms.

Put a production-grade sample on your desk

Choose a catalog model or send your branding brief. A project engineer confirms price, freight and ship date within two working days.

Chat on WhatsApp
Your experience on this site will be improved by allowing cookies.