What is the E13 and what does it do?
The E13-06 is a Bluetooth audio glasses platform: open-ear music and hands-free calls on a Bluetooth 5.3 link, with temple touch control and a magnetic two-pin charging sleeve. It has no camera or display, so the bill of materials and the retail price stay focused on everyday audio. It is the platform brands pick when the brief is audio glasses for the workday, configurable with an anti-blue lens or a documented myopia option.
Why does the E13 use Bluetooth 5.3 instead of 5.4?
Bluetooth 5.3 is the published radio for the E13, the same generation K02 publishes; K01, D11 and D12 publish 5.4-generation links. For stereo audio and call traffic to a single phone, 5.3 remains a mature, widely supported generation with predictable power behaviour. The choice keeps the platform on proven silicon and a competitive bill of materials. CYNRIN confirms the exact module per project on the configuration sheet.
What is the E13 battery capacity?
Battery capacity in mAh is not published for the E13 and is confirmed on the configuration sheet per project. The published record leads with runtime instead: about 5 hours of music playback and about 5 hours of talk time under reference conditions. Buyers comparing cells should note K02 publishes 90mAh × 2 and the D11 and D12 publish 100mAh, but those figures cannot be assumed for the E13.
How long does the E13 last through a workday?
About 5 hours of reference music playback and about 5 hours of reference talk time are published, which fits a commute plus office listening with a daytime top-up rather than a full continuous shift. Both are reference figures measured at defined volume and signal conditions; higher volume and weak pairing reduce them. Standby time and mixed-use figures are not published.
How does the E13 charge and how long does it take?
The E13 charges through a magnetic two-pin charging sleeve, with a published charge time of about 70 minutes under reference conditions. The sleeve removes the need for an exposed USB socket on the temple. Spare sleeves, sleeve lifetime and charger specifications are not published and are confirmed on the configuration sheet per project, including accessory pricing for retail packs.
What lens and frame options does the E13 publish?
The frame is published as PC (polycarbonate), and the lens record reads 'anti-blue lens; myopia lens option documented'. That makes the E13 the only K/D/E platform with a documented prescription path. Lens substrate, prescription range, tint options, hinge materials and frame weight are not published; the supported lens programme and optical-lab requirements are confirmed per project in writing.
How does the E13 compare with the K02 and the D11?
All three are open-ear Bluetooth audio glasses, but the records differ. The E13 publishes Bluetooth 5.3, a magnetic sleeve, about 70-minute charging and about 5-hour music and talk time, plus PC and lens options. K02 publishes 5.3 with 90mAh × 2 cells and ~8h playback; the D11 publishes 5.4, a 100mAh cell, Type-C, ~7h and surround sound. Choose on charging interface, runtime and lens requirements rather than price alone.
Does the E13 include touch control?
Yes. The published platform description lists temple touch control for playback and calls as part of the standard E13 configuration. The exact gesture set, firmware behaviour and assistant routing are not published in the specification rows and are confirmed on the configuration sheet per project, together with any custom gesture or wake-word requirements for branded builds.
What is the MOQ for an E13 order?
Catalogue OEM configuration starts at 500 units with catalogue colour and packaging options. Branded OEM with custom logo, packaging and documentation typically starts at 1,000 units. ODM work involving structural or electronic changes is evaluated separately, typically at 3,000–5,000 units. The E13 lens options may affect the minimum run if prescription processing is included, so confirm the lens track at brief stage.
Can the E13 be customised for our brand?
Yes. Logo placement, frame colour, packaging, documentation and the lens track (anti-blue or the documented myopia option) are reviewed against target quantity and market. Pantone colour and paint finish are evaluated on the PC frame during sampling. Structural or electronic changes fall under ODM terms. Every custom scope is confirmed in writing on the proforma invoice before tooling or mass production begins.
Which certifications apply to the E13?
CE, FCC and RoHS are published certification capabilities at CYNRIN, not claims that a specific E13 build is certified. The applicable reports, directives and configuration scope are verified against the destination market and provided on request. Share target markets at RFQ stage so the correct radio, battery-shipping and materials documentation can be scoped before the order is confirmed.
How long do E13 samples and mass production take?
Sample timing is confirmed after the product brief is reviewed, because lens selection and sleeve accessory packs affect preparation. Mass production typically runs 15–40 days after deposit, depending on quantity, customisation scope and lens processing. A written schedule is agreed before deposit. Rush windows for seasonal launches should be raised at the first briefing so capacity can be reserved.
What should we send to start an E13 RFQ?
Send target quantity, destination market, required lens track (anti-blue or myopia), preferred frame colour, packaging expectations and whether spare charging sleeves are needed for retail. CYNRIN replies with the E13 configuration sheet, sample timing, MOQ confirmation and the certification scope applicable to your markets. Files covering unlisted parameters are provided against the concrete brief rather than as generic claims.