Smart eyewear OEM/ODM manufacturer · Shenzhen, China +86 19835872450 sales@cynrin.com
Automated SMT production line inside CYNRIN smart glasses factory in Shenzhen
OEM MANUFACTURING

Smart Glasses OEM Manufacturing, Built for Brands That Ship

From validated PCBA to retail-ready cartons, CYNRIN runs the complete smart glasses production chain in-house. You bring the brand and the market — we bring engineering, tooling, lines, test labs and export logistics.

120K+units annual smart-glasses capacity
6in-house production & test stages
1,000unit MOQ for branded OEM programs
25–35 daystypical mass-production lead time
THE OEM PARTNER

One factory, the entire smart-glasses value chain

Original Equipment Manufacturing with CYNRIN means your product is built on our mature, audited platform — industrial design, electronics, optics, acoustics and firmware already proven in tens of thousands of shipped units — then branded, configured and packaged for your market. You avoid the 12–18 months and six-figure NRE exposure of a ground-up build, while retaining full control of brand, pricing and channel.

Every OEM program is run as a named project by a dedicated engineer and PM, with a controlled BOM, frozen golden samples, and inspection reports issued at every gate. Whether you are launching a first smart-audio frame or scaling a camera-glasses category, the same line, lab and quality system used for our reference products is placed behind your logo.

98.6%first-pass yield on mature SKUs
ISO 9001certified quality management system
CE · FCC · RoHSready for EU, US and global markets
40+brand and retail programs delivered
INSIDE THE FACTORY

Six production stages, one accountable supplier

Close-up of a smart glasses mainboard on an SMT line
Stage 01 — SMT & PCBA

High-density surface-mount electronics

Multi-layer mainboards and flex PCBs are printed on automated SMT lines with SPI solder inspection, AOI after reflow and 100% ICT/fixture verification. Bluetooth SoCs, MEMS microphones, camera modules, battery protection and touch controllers are placed in-house — never brokered to an unnamed board house.

Equipment
Multi-zone reflow, AOI, SPI, ICT fixtures
Components
BLE SoC, MEMS mic, camera MCU, PMU, sensors
Traceability
Reel lot codes recorded per production batch
Injection molding machines producing smart glasses frame parts
Stage 02 — Tooling & Injection

Precision frames, hinges and optical housings

TR90, PA12 and PC frame components are molded on precision tooling maintained in our partner mold shop, with first-article CMM inspection before mass production. Metal hinges, temple cores and camera windows are assembled to controlled tolerances so every unit closes, aligns and seats identically.

Materials
TR90, nylon, PC, aluminum, stainless hinges
Finish
Matte, soft-touch, sprayed, PVD or electroplated
Tooling life
Maintained for repeat orders across seasons
Technician assembling smart glasses electronics into a frame
Stage 03 — Assembly & Optical Alignment

Hands that have built every generation we ship

On the assembly line, PCBA, batteries, speakers, waveguides and camera modules are married to the frame under ESD-controlled workcells. Camera boresights, speaker sealing and temple-routing are fixture-aligned, and every unit receives a laser-engraved serial for full lifecycle traceability.

Process
ESD line, fixture alignment, torque control
Traceability
Laser serial per unit, batch-linked test data
Configurations
Audio, camera, AI-voice and hybrid SKUs
RF shielded chamber testing smart glasses Bluetooth performance
Stage 04 — RF, Audio & Optical Test

Shielded-lab verification on every batch

Units are validated in our RF shielded room for Bluetooth range and coexistence, on acoustic fixtures for mic/Speaker performance, and on optical benches for lens alignment, transmittance and camera geometry. Pre-scan results for CE/FCC/RoSH are captured before third-party labs issue certificates under your brand.

RF lab
Shielded chamber, range & coexistence test
Audio
MIC sensitivity, leakage, speaker SPL curves
Optics
Alignment, transmittance, polarization, UV400
Aging racks with rows of smart glasses undergoing burn-in testing
Stage 05 — Aging & Reliability

Burn-in before your customer unboxes

Every production lot passes power-cycle aging on controlled racks, plus hinge cycling, drop, sweat, temperature/humidity and cable-flex testing per the reliability test plan signed off at NPI. Failures are RMA-coded back to the station, not the customer.

Burn-in
Controlled power-cycle aging per lot
Mechanical
Hinge cycle, drop, twist, temple flex
Environmental
Thermal, humidity, salt-spray, sweat
Export containers at Shenzhen port loaded with electronics cargo
Stage 06 — Packing, Warehousing & Export

Retail-ready, export-documented, on the water

Units are packed into your custom retail boxes, bundled with localized manuals and accessories, palletized and staged in our finished-goods warehouse. We prepare commercial invoices, packing lists and MSDS for battery shipments, and support FOB Shenzhen, CIF or DDP delivery to your DC, Amazon FBA or distributor.

Packing
Custom retail box, inserts, localized manuals
Incoterms
EXW, FOB Shenzhen, CIF, DDP supported
Destinations
EU, North America, Middle East, APAC
ENGINEERING BENCH

Capabilities brands usually have to source separately

These are not rented facilities for a photo opportunity — they are the same labs and stations that de-risk your program from first article to fourth reorder.

Engineers reviewing smart glasses CAD drawings and BOM
DFM

Design for Manufacturing review

Our ME/EE team red-lines your CAD and BOM for tolerance, assembly sequence and cost before tooling is cut — typically returning the first DFM report within five working days.

Optical bench measuring lens alignment and light transmittance
Optics

Optical & lens engineering

Polarized, photochromic, prescription-ready and prescription-insert programs are validated on-bench for geometry, UV400 and optical-grade transmittance.

3D printed smart glasses prototypes on an engineering workbench
NPI

Rapid prototyping

3D-printed appearance models, CNC mockups and functional PCBA builds compress concept-to-hold decision cycles to days, not weeks.

Custom retail packaging for branded smart glasses
Packaging

Packaging & unboxing design

Structural design, dieline files, sleeve art direction, accessory kits and ISTA-style drop validation — retail-ready for Apple-style shelves or Amazon FBA cartons.

Finished smart glasses cartons organized in warehouse racking
Supply

Inventory & reorder velocity

Forecast-buffered raw material and finished-goods staging support 4–6 week reorder cycles and seasonal spikes without re-negotiating the program.

Labeled export cartons prepared for international freight
Compliance

Compliance documentation

CE, FCC, RoHS, REACH and battery-transport dossiers are prepared with the third-party labs, in your brand name, so retail onboarding does not stall.

HOW AN OEM PROGRAM RUNS

From RFQ to reorder in five controlled phases

Each phase has defined inputs, deliverables and sign-offs. You always know which gate the program is sitting at, what is owed from us, and what is owed from you.

1. RFQ & DFM

Share drawings, a reference model or just a product brief. Within five working days you receive an itemized quotation, BOM direction, MOQ and tooling/NRE schedule.

2. Samples & golden sample

Engineering and branded samples are built and tested; you sign and seal one golden sample that becomes the mass-production master standard.

3. Tooling & pilot run

Tooling is finalized and a pilot run validates yields, cycle times and packing before any bulk deposit moves.

4. Mass production & QC

SMT, assembly, aging and AQL inspection proceed with mid-line and final inspection reports shared before shipment release.

5. Shipment & reorder

Goods ship under the agreed Incoterm with full documents; the BOM, tooling and fixtures remain alive for fast, low-friction reorders.

Timelines, payment milestones and sample policies in detail: Lead Times · Payment Terms · Samples

White-label smart glasses, custom packaging and accessories laid out on a table
INCLUDED IN EVERY OEM PROGRAM

Your brand on a product that is ready to sell

  • Your logo and identity — laser, pad-print or embossed marking on temples and case; branded boot screen and app pairing name where supported.
  • Color and finish freedom — custom frame colors, lens tints and surface finishes from pantone-matched master samples.
  • Custom retail packaging — your dieline, your unboxing, localized quick-start guides and accessory bundles.
  • Firmware configuration — wake word, voice prompts, default language set, pairing behavior and OTA channel scoped to your SKU.
  • Compliance in your name — CE/FCC/RoHS test support, technical construction files and battery transport documents.
  • After-sales backbone — spare-parts allowance, RMA SOP and firmware maintenance for the life of the product.
PROGRAM TIERS

Three ways to enter, one factory behind you

Catalog OEMBranded OEMCustom OEM
Starting MOQ500 units1,000 units3,000–5,000 units
Base platformCurrent reference SKUReference SKU, configuredCo-developed platform
Logo & brandingLogo marking onlyMarking + packaging + firmware IDFull ID, packaging and firmware
Color / finishCatalog colorsCustom from pantone masterCustom materials & tooling
Tooling / NRENoneLow (packaging, fixtures)Project-quoted, amortizable
Sample lead time5–7 days10–15 days30–60 days
Mass production15–20 days25–35 days40–60 days after sample approval
Best forMarket test, distributor stockBrand launch, retail listingCategory-defining flagship

Not sure which tier fits? Describe the program in the RFQ form and engineering will recommend one.

OEM FAQ

Questions procurement teams ask before issuing a PO

What is the difference between OEM and ODM at CYNRIN?
OEM builds your brand on our proven manufacturing platform and reference designs. ODM goes further: our industrial-design and engineering teams co-develop a differentiated product — new ID, optical or acoustic architecture, custom PCBA — to your specification. Many flagship programs begin as OEM and migrate to ODM for the second generation. See the ODM services page.
Can I visit and audit the factory before ordering?
Yes, and we encourage it. Most brand and retail customers run an on-site or third-party audit (SGS, BV, TUV style) before tooling release. We can host you at our Shenzhen facility or arrange a live video factory tour covering SMT, assembly, aging and packing lines.
Who owns the tooling if I pay for it?
Tooling and custom fixtures paid by the customer remain the customer’s exclusive property, are tagged and stored in our mold shop, and are never used for another buyer. Upon written request at end of program we will return or formally dispose of them with photo evidence.
Do you support Amazon FBA and DDP shipping?
Yes. We carton and label to FBA specification, prepare battery MSDS and UN38.3 documents, and ship FOB Shenzhen, CIF or DDP through our forwarders or yours. Details are on the shipping & logistics page.
What warranty do OEM customers receive?
Standard defective-rate allowance and a 12-month product warranty are built into the OEM contract, with spare-unit or spare-parts allowance per shipment. Extended terms and onboarding support for your support team are available for retail programs — see warranty policy.

Ready to put your brand on a factory-grade smart glasses line?

Send your brief, drawings or target spec sheet. Engineering responds with a quotation and DFM feedback within five working days.

Chat on WhatsApp
Your experience on this site will be improved by allowing cookies.