Smart eyewear OEM/ODM manufacturer · Shenzhen, China +86 19835872450 sales@cynrin.com
AI Camera Glasses

V03-T5 AI Camera Glasses

The V03-T5 is CYNRIN's flagship AI camera glasses platform, pairing an 8MP Sony IMX219 4P sensor, 1200p30 video and 4 GB onboard storage with Bluetooth 5.3, 2.4 GHz Wi-Fi and a choice of three lens tracks as a configurable OEM platform for brand buyers.

  • 8MP Sony IMX219 4P camera, JPEG up to 32MP interpolated
  • MP4 1200p video at 30 fps with 4 GB onboard storage
  • Bluetooth 5.3 plus 2.4 GHz Wi-Fi (Wi-Fi 4) dual radio
  • 220 mAh cell; 2-pin magnetic USB charge in about 60 minutes
  • Blue-light, sunglasses or photochromic lens tracks
Order a sample
Camera
8MP, Sony IMX219 4P
Video
MP4, 1200p at 30 fps, 16:9
Connectivity
Bluetooth 5.3 + 2.4 GHz Wi-Fi 4
Battery
220 mAh / 3.85 V
Memory
4 GB
Frame size
54-20-141 (lens-bridge-temple)

Recording, playback and charging figures are reference values measured under defined conditions; lens-track availability, accessories and regional settings are confirmed in writing per project.

Platform capabilities

The flagship camera platform, fully specified

The V03-T5 is the most completely documented column in the camera family, and every capability below is copied from its published specification record.

8MP Sony sensor

The 8MP Sony IMX219 4P module outputs JPEG stills up to 32MP interpolated in 4:3 and MP4 video at 1200p, 30 fps in 16:9, held on the 4 GB onboard buffer.

1200p30 video

First-person video records as MP4 at 1200p and 30 fps in 16:9, with a published reference recording time of about 40 minutes under the defined test conditions.

Dual radio link

Bluetooth 5.3 carries audio and control to the paired phone, while 2.4 GHz Wi-Fi (Wi-Fi 4) provides a faster path for moving captured media off the frame.

HeyCyan companion app

The published companion app, HeyCyan, is compatible with iPhone and Android and provides the phone-side services paired to the V03-T5 AI camera glasses platform.

Three lens tracks

Blue-light filtering, sunglasses or photochromic lenses share the TR frame with PC temples and lenses and a stainless-steel hinge, with the track confirmed per order.

Creator wearing V03-T5 AI camera glasses framing a first-person scene
Designed around real use

A camera platform specified down to the sensor.

The V03-T5 publishes a named 8MP Sony IMX219 4P module with a complete output chain — JPEG up to 32MP interpolated, MP4 1200p30 video and 4 GB onboard storage — so brand buyers can write packaging claims against documented values. No sibling in the camera family publishes a sensor name, video resolution or storage figure, which is what makes this the flagship column.

Two radios divide the workload: Bluetooth 5.3 carries audio and control while 2.4 GHz Wi-Fi (Wi-Fi 4) moves media to the HeyCyan app on iPhone or Android. A TR frame with PC temples and lenses, a stainless-steel hinge and three lens tracks keeps the platform configurable across office, travel and outdoor markets.

  • 01 First-person POV content recorded at 1200p30
  • 02 Field documentation with both hands free
  • 03 Blue-light, sun or photochromic lens programmes
V03-T5 on the CYNRIN line

On the CYNRIN campus the V03-T5's Sony IMX219 camera module passes through active-alignment and optical-bench verification, while the stainless-steel hinge and TR/PC frame run the shared SMT, aging and RF lines; catalogue OEM starts at 500 units.

See the manufacturing record
Engineering record

V03-T5 AI Camera Glasses specifications

The published platform specification, grouped by engineering domain and maintained as system data. Values are confirmed in writing per project before tooling or mass production.

01

Model & Identity

Model
V03-T5
02

Imaging & Storage

Camera
8MP, Sony IMX219 4P
Photo output
JPEG, up to 32MP interpolated, 4:3
Video output
MP4, 1200p at 30 fps, 16:9
On-board storage
4 GB
03

Audio & Connectivity

Connectivity
Bluetooth 5.3, 2.4 GHz Wi-Fi (Wi-Fi 4)
Companion app
HeyCyan; iPhone and Android compatible
04

Power & Charging

Battery capacity
220 mAh / 3.85 V
Charging method
2-pin magnetic USB, approx. 60 minutes
Video recording time
Approx. 40 minutes under reference test conditions
Music playback time
Up to 5 hours at maximum volume under reference test conditions
05

Physical & Optics

Materials
TR frame, PC temples and lenses, stainless-steel hinge
Frame size
54-20-141
Lens options
Blue-light filtering, sunglasses or photochromic

Values are shown from the published CMS product record. Specification changes driven by component or firmware revisions are confirmed in writing on the proforma invoice before tooling or mass production; runtime and charging are reference figures.

Reading the numbers

What the V03-T5 specifications mean in use

Each card pairs a value copied verbatim from the V03-T5 published record with its procurement meaning. Reference figures are measured under defined conditions, and every gap is confirmed on the configuration sheet per project.

Camera 8MP, Sony IMX219 4P

The named Sony IMX219 4P module is the only sensor-level camera record in the cam_tier1 cluster — V03-PRO, L1-PRO, L2-ULTRA and S7 publish only an 8MP or 13MP label with no sensor name, so buyers here receive a documented bill-of-materials anchor for optical qualification.

Native output is 8MP; the published 32MP figure is interpolation, not extra optical detail. Low-light behaviour is not published and is confirmed per project.

Photo output JPEG, up to 32MP interpolated, 4:3

JPEG stills at 4:3 are processed up to 32MP by interpolation from the 8MP sensor, the only published stills pipeline in the family — the V03-PRO and 13MP L1/L2/S7 records publish no photo resolution or format, giving marketing teams a concrete deliverable spec here.

Interpolation enlarges the file, not optical resolution; RAW output is not published. File size varies with scene content and firmware.

Video output MP4, 1200p at 30 fps, 16:9

MP4 video at 1200p and 30 fps in 16:9 is the only published video pipeline among the five cam_tier1 columns — no sibling publishes resolution, frame rate or container — making this the safest column to specify against retail packaging claims for POV footage.

Reference clip length is about 40 minutes under defined conditions. Stabilisation and bitrate are not published and are confirmed per project.

On-board storage 4 GB

Four gigabytes of onboard memory buffer clips and stills independently of the phone — the only published storage figure in the cluster, where every other column is Not published. It sets how much footage a field user can capture before offloading over Bluetooth 5.3 or the 2.4 GHz Wi-Fi link.

Recordable minutes vary with bitrate and scene content; no card slot is published. Usable capacity after firmware is confirmed on the configuration sheet.

Connectivity Bluetooth 5.3, 2.4 GHz Wi-Fi (Wi-Fi 4)

Bluetooth 5.3 plus 2.4 GHz Wi-Fi (Wi-Fi 4) is the richest published radio stack in cam_tier1, where the other four columns publish no connectivity at all. The dual link separates low-power audio and control from faster media transfer, a differentiator for app-driven briefs.

Range and throughput depend on the paired phone and environment; regional band support and the codec list are confirmed per project.

Battery capacity 220 mAh / 3.85 V

The 220 mAh / 3.85 V cell matches the V03-PRO's 220mAh tier, while L1-PRO and L2-ULTRA publish 290mAh and the S7 260mAh. Publishing nominal voltage alongside capacity gives engineers a complete cell definition for charger and shipping-document planning.

Capacity is a ceiling, not a runtime promise; camera and radio loads dominate draw. See the reference playback and recording rows for measured behaviour.

Charging method 2-pin magnetic USB, approx. 60 minutes

A 2-pin magnetic USB interface with an approximate 60-minute reference charge is the fastest published charging figure in the cluster — V03-PRO and L2-ULTRA list Type-C at ≤2h, L1-PRO ≤2h and S7 ≤2h — and magnetic docking enables holder-charger accessory designs.

About 60 minutes is a reference value under defined conditions; adapter rating and cable are not published. Magnetic alignment force is confirmed per order.

Lens options Blue-light filtering, sunglasses or photochromic

Blue-light filtering, sunglasses or photochromic tracks let one SKU serve office, outdoor and light-changing markets; V03-PRO publishes photochromic only and the L1/L2/S7 records publish no lens options, so this column carries the broadest optical configuration in the table.

Lens supplier, tint category and photochromic transition performance are not published; availability per track is confirmed in writing per project.

Choose within the family

V03-T5 vs the high-resolution CYNRIN camera-glasses platforms

Every cell comes from the published specification record of the model shown — no estimated or borrowed numbers. Gaps stay as Not published rather than being filled from a sibling model.

Published specification record per model, flagship and 13 MP platforms. Linked names open that product page.
Specification V03-T5 V03-PRO L1-PRO L2-ULTRA S7
Position Flagship 8 MP AI camera 8 MP photochromic Type-C 13 MP with charging case 13 MP Type-C dual case 13 MP sports camera
Camera 8MP, Sony IMX219 4P 8MP 13MP 13MP 13MP
Battery capacity 220 mAh / 3.85 V 220mAh 290mAh 290mAh 260mAh
Charging case Not published Not published 1400mAh 900 / 1400mAh Not published
Charging interface 2-pin magnetic USB, approx. 60 minutes Type-C Not published Type-C Magnetic charging
Reference charging time Not published ≤ 2h ≤ 2h ≤ 2h ≤ 2h
Reference playback time up to 5 hours at maximum volume under reference test conditions music 5–8h music ~7h music ~7h music 5–8h music
Lens options Blue-light filtering, sunglasses or photochromic Photochromic Not published Not published Not published
Frame / weight TR frame, PC temples and lenses, stainless-steel hinge Flexible Not published Not published Removable inner frame
Colours Not published Orange / Off-white / Black Not published Not published Not published

The V03-T5 column is the only one in cam_tier1 publishing a named sensor (Sony IMX219 4P), photo and video pipelines, 4 GB storage, a dual Bluetooth 5.3 plus Wi-Fi radio stack, a full material record and three lens tracks. Its magnetic about-60-minute charge is also the fastest published figure against the ≤2h sibling columns. Cells marked Not published are absent from that model's official record and are confirmed on the configuration sheet per project, never copied from another column.

Applications

Where V03-T5 fits

The fully documented imaging and radio stack suits buyers who need published numbers behind every claim on the packaging.

Field technician recording a repair with V03-T5 camera glasses

Field service

Technicians record MP4 1200p clips hands-free, with a published reference of about 40 minutes continuous recording and a 4 GB buffer for a full round of site captures before offloading.

V03-T5 lens options reviewed in an optical design studio

Optical channels

Blue-light filtering, sunglasses or photochromic tracks let optical retailers merchandise one V03-T5 platform across office, sun and adaptive-lens buyer segments with a shared frame platform.

First-person photo workflow with the HeyCyan app on V03-T5

Creator imaging

The HeyCyan app on iPhone or Android receives first-person JPEGs up to 32MP interpolated over Bluetooth 5.3 or the 2.4 GHz Wi-Fi link for creator and app-driven imaging workflows.

From brief to shipment

V03-T5 programmes move through four gates — Define, Configure, Validate and Produce — and the full process, timelines and deliverables are documented on the OEM/ODM process page.

  1. Define
  2. Configure
  3. Validate
  4. Produce
See the full OEM/ODM process
2018CYNRIN established in Shenzhen
20,000+ m²Self-owned production campus
500 pcsCatalogue OEM entry MOQ
15–40 daysTypical mass-production window
Project documents

Available on request

Buyer questions

V03-T5 AI Camera Glasses FAQ

What are the V03-T5 AI camera glasses?
CYNRIN confirms the V03-T5 as the flagship AI camera glasses platform in the published camera family: an 8MP Sony IMX219 4P camera producing JPEG stills up to 32MP interpolated (4:3) and MP4 video at 1200p30 (16:9), held on 4 GB of onboard storage. Bluetooth 5.3 and 2.4 GHz Wi-Fi (Wi-Fi 4) connect the frame to the HeyCyan companion app on iPhone or Android, with blue-light filtering, sunglasses or photochromic lens tracks. It ships as a configurable OEM platform rather than a closed retail SKU.
What camera sensor and output does the V03-T5 use?
The published camera is an 8MP Sony IMX219 4P module — the only camera in the cam_tier1 family with a named sensor; V03-PRO also publishes 8MP, while L1-PRO, L2-ULTRA and S7 publish 13MP. Stills output as JPEG up to 32MP interpolated in 4:3, meaning the 32MP figure is software upscaling of the native 8MP capture, and video records as MP4 at 1200p, 30 fps in 16:9. Sensor-level parameters beyond the name — aperture, field of view and low-light behaviour — are not published and are confirmed on the configuration sheet per project.
What is the V03-T5 battery capacity?
The published cell is 220 mAh at 3.85 V. It matches the V03-PRO's 220mAh capacity, sits 40 mAh below the S7's 260mAh and 70 mAh below the 290mAh cells in L1-PRO and L2-ULTRA. Capacity is the hardware ceiling, not a runtime promise: the camera, Wi-Fi radio and audio all draw from this single pack, so buyers should plan around the published reference figures — about 40 minutes of video recording and up to 5 hours of music at maximum volume — rather than converting mAh into hours.
How does the V03-T5 charge and how long does it take?
The published charging method is 2-pin magnetic USB, with an approximate charging time of 60 minutes under reference conditions — the quickest published charge in the camera family, where V03-PRO, L1-PRO, L2-ULTRA and S7 all record ≤2h. The magnetic interface also supports dock and holder-charger accessory designs. CYNRIN confirms that adapter rating, cable specification and magnetic alignment force are not published and are set out on the configuration sheet for your project before tooling.
What materials, frame size and lens options does the V03-T5 publish?
The frame is published as a TR frame with PC temples and lenses and a stainless-steel hinge, in a 54-20-141 frame size; weight is not published. Three lens tracks are offered: blue-light filtering, sunglasses or photochromic. This is the broadest lens choice in cam_tier1 — V03-PRO publishes photochromic only and the L1-PRO, L2-ULTRA and S7 records publish no lens options. Final lens supplier, tint category and availability per track are confirmed in writing per order.
What is the difference between the V03-T5 and the V03-PRO?
V03-T5 and V03-PRO share the 8MP tier and a 220mAh cell, but the T5 publishes the Sony IMX219 4P sensor name, JPEG up to 32MP interpolated, MP4 1200p30 video, 4 GB storage, Bluetooth 5.3 plus 2.4 GHz Wi-Fi, magnetic charging in about 60 minutes and three lens tracks. The PRO publishes Type-C, a ≤2h charge, reference 5–8h playback, flexible temples, photochromic-only lenses and three colours. Choose the T5 for documented imaging and radio specifications; choose the PRO for Type-C and adaptive-lens positioning.
What connectivity and companion app does the V03-T5 support?
Connectivity is published as Bluetooth 5.3 plus 2.4 GHz Wi-Fi (Wi-Fi 4), the only dual-radio record in the camera family — every other cam_tier1 column leaves connectivity Not published. The companion app is HeyCyan, compatible with iPhone and Android, which handles the phone-side AI services. CYNRIN confirms that supported codecs, regional Wi-Fi band behaviour and the exact feature list of the HeyCyan build for branded orders are not in the hardware specification and are confirmed per project.
What is the MOQ for a V03-T5 OEM order?
CYNRIN confirms three entry points. Catalogue OEM configuration starts at 500 units, branded OEM with your logo and packaging starts at 1,000 units, and ODM engineering changes typically run at 3,000–5,000 units per project. For the V03-T5, lens-track selection, app scoping and packaging structure determine which tier a brief falls into; the team maps your target quantity and channel to the correct entry point on the configuration sheet before any deposit.
Can the V03-T5 be customised for our brand?
Customisation covers logo placement, frame colour, lens track (blue-light filtering, sunglasses or photochromic), packaging structure and documentation scoping, subject to order quantity. The TR frame, PC temples and stainless-steel hinge remain the shared platform; structural tooling changes are treated as ODM and typically require 3,000–5,000 units. Pantone colour matching, custom lens tint and retail-box artwork are evaluated against the brief and confirmed in writing on the proforma invoice.
Which certifications apply to the V03-T5?
CE, FCC and RoHS are published as certification capabilities of the manufacturer, not as claims that the V03-T5 is certified in a specific configuration. CYNRIN confirms which reports apply to your lens, radio and packaging configuration, and verifies them per destination market on request. EU shipments additionally require a review of RED and market-specific documentation; the certification report index for the model is provided at RFQ stage, with applicable scope agreed before mass production.
How are V03-T5 samples and lead times arranged?
Sample timing and configuration are scheduled after the product brief is reviewed; CYNRIN confirms the schedule in writing rather than quoting a generic calendar date. Mass production typically runs 15–40 days after deposit, depending on lens-track availability, packaging scope and order quantity. Pre-production samples are validated before the Produce gate, and buyers receive a written schedule covering configuration-sheet sign-off, sample approval and export coordination for the V03-T5.
How long can the V03-T5 record video continuously?
The published video recording time is approximately 40 minutes under reference test conditions, separate from the music playback figure of up to 5 hours at maximum volume. The 40-minute figure defines continuous capture in the reference profile and is the number to use when planning clip workflows; real sessions vary with ambient temperature, Wi-Fi transfer use and storage management. Continuous-record limits, looping options and file-rollover behaviour are not published and are confirmed on the configuration sheet per project.
How do we start a V03-T5 project?
Send your target quantity, destination market, lens track, colour and any branding or app-scoping requirements. CYNRIN replies with the V03-T5 configuration sheet, sample timing, the applicable MOQ (500 catalogue, 1,000 branded, typically 3,000–5,000 for ODM changes) and the certification report scope for your market. The brief then moves through Define, Configure, Validate and Produce, with mass production typically 15–40 days after deposit.
Project desk

Configure the V03-T5 for your market

Send your target quantity, destination market, lens track, colour and branding scope. CYNRIN replies with the V03-T5 configuration sheet, sample timing, the applicable MOQ and the certification report scope for your market.

Sample
Chat on WhatsApp