Smart Glasses Customization, Options, MOQ & Lead-Time Impact
This page is the procurement reference for every customization CYNRIN supports on catalog, branded OEM and custom ODM smart glasses programs: logo and marks, lenses and optics, electronics, packaging, firmware and compliance. Each table states what the option is, the minimum order quantity it triggers, and the lead time it adds to the base program. Base figures: catalog private label from 500 units and 15–25 days; branded OEM from 1,000 units; custom ODM from 3,000–5,000 units.
Logo marks, colors and surface finishes

Branding is the lightest customization tier and the only one available at the 500-unit entry MOQ. Logo positions are validated on golden samples before bulk; pantone colors are matched against physical master chips, not screen renders.
| Customization | Typical MOQ | Lead-time impact |
|---|---|---|
| Laser-engraved logo on temples | 500 units | 0–3 days added |
| Pad-printed logo (one or two colors) | 500 units | 2–5 days; film fixture setup |
| Embossed or debossed logo on case | 1,000 units | 5–7 days; case mold insert |
| Custom pantone-matched frame color | 1,000 units | 7–10 days after master sign-off |
| Custom surface finish (soft-touch, metallic, PVD) | 1,000 units | 7–14 days; process validation |
| Firmware brand ID (pairing name, boot identity) | 500 units | 3–5 days; firmware build & QA |
Lens programs, tints and prescription readiness
All supplied lenses carry UV400 protection and are verified on our optical bench for transmittance, polarization and geometry. Custom lens programs that require new tooling or a prescription architecture are scoped as ODM development.
| Customization | Typical MOQ | Lead-time impact |
|---|---|---|
| Catalog tint (smoke, clear, brown) | 500 units | 0–2 days; in-stock lens |
| Polarized lens upgrade | 1,000 units | 5–7 days; bench verification |
| Photochromic (light-adaptive) lens | 1,000 units | 7–10 days; supplier lot check |
| Mirror coating or custom tint | 1,000 units | 5–10 days; coating batch |
| Prescription-ready Rx insert program | 3,000 units | 15–30 days; insert tooling |
| Custom optical geometry or waveguide work | 3,000–5,000 units | ODM schedule; NRE applies |
Test equipment and methodology: quality control & testing.

Chips, batteries, sensors and PCBA changes

Electronics changes are risk-scored against the certified reference design. Component swaps inside the existing architecture stay on OEM terms; anything requiring a new board layout triggers EMC re-validation and an ODM program with quoted NRE.
| Customization | Typical MOQ | Lead-time impact |
|---|---|---|
| Battery capacity option (certified family) | 1,000 units | 5–10 days; safety re-confirmation |
| SoC/radio variant within reference design | 1,000 units | 10–15 days; firmware & RF validation |
| Sensor enablement on existing PCBA | 3,000 units | 15–25 days; driver & test work |
| Speaker or microphone component swap | 3,000 units | 10–20 days; acoustic re-tuning |
| Custom cable, connector or charging dock | 1,000 units | 7–10 days; accessory sourcing |
| Custom PCBA or new architecture | 3,000–5,000 units | 30–60 days; EVT/DVT + NRE |
Retail boxes, inserts, manuals and accessory kits
Packaging is the most-used customization after logo marking. Provide print-ready dielines or work from our structural templates; every custom pack is drop-validated before the bulk print run and master cartons can be configured for shelf or FBA/DDP fulfillment.
| Customization | Typical MOQ | Lead-time impact |
|---|---|---|
| Logo sleeve or sticker on standard box | 500 units | 2–4 days |
| Custom-printed retail box on your dieline | 1,000 units | 7–12 days; print plates |
| Custom molded insert (pulp, EVA, blister) | 1,000–3,000 units | 10–15 days; insert tooling |
| Accessory bundle (case, cable, cloth) | 500 units | 2–5 days per component |
| Localized manuals and printed cards | 500 units | 3–5 days after approved files |
| Gift / seasonal coffret packaging | 3,000 units | 15–20 days; structural design |
Print-ready file requirements are shared with the quotation; packaged golden samples precede every bulk run.

Brand identity, languages, voice and OTA

Firmware customization is version-controlled against the certified baseline: brand-identity and language changes ship as a configured build, while new features follow an ODM statement of work. Every custom build passes regression on RF, audio and battery tests before release.
| Customization | Typical MOQ | Lead-time impact |
|---|---|---|
| Bluetooth pairing name and brand ID | 500 units | 2–4 days |
| Default language and region settings | 500 units | 1–3 days |
| Additional voice-prompt language pack | 1,000 units | 5–10 days; recording & QA |
| OTA channel provisioned for your SKU | 1,000 units | 3–5 days; release setup |
| Branded companion app skin and store listing | 1,000 units | 10–20 days |
| Custom wake word or prompt recordings | 3,000 units | 10–20 days; studio & tuning |
| New firmware feature (gestures, modes) | 3,000–5,000 units | ODM schedule; NRE quoted |
Marks, dossiers and battery-transport documents
Reference platforms already carry CE, FCC, RoHS and REACH coverage. Certification in your brand name, or for a modified electronics configuration, is arranged with accredited third-party laboratories; UN38.3 and MSDS documents accompany every lithium-battery shipment. See also the certifications page.
| Requirement | Applies when | Lead-time impact |
|---|---|---|
| CE marking dossier (EU) | Each model sold into the EU | 15–30 days for new-model testing |
| FCC certification (US) | Each new radio/electronics configuration | 15–30 days with the test lab |
| RoHS / REACH declarations | Branded documentation in your name | ~5 days on reference platforms |
| UN38.3 + battery MSDS | Each battery configuration shipped by air or sea | 7–14 days |
| Declaration of Conformity in brand name | Retail and distributor onboarding | Issued with certificate package |
| Country-of-origin and carton labels | All export shipments | 1–2 days; standard on FBA cartons |
Procurement questions about options and thresholds
What is the minimum order for fully branded smart glasses?
Are customization lead times added on top of the base lead time?
Does a custom pantone color cost more?
Can we supply our own packaging, manuals or accessory components?
Which customizations require NRE and an ODM contract?
Can we mix customizations across SKUs in one order?
Pages to read alongside the options catalog
MOQ & Tier Thresholds
Why each minimum exists and how mixed SKUs are consolidated.
Explore02Lead Times
Samples, mass production and reorder schedules by engagement.
Explore03Private Label Program
The 500-unit, no-NRE route using exactly these options.
Explore04Samples & Golden Samples
How branded samples are built, approved and sealed as the standard.
Explore05Request a Quote
Send your SKU and customization list for an itemized quotation.
Explore06Engineering Guides
Display, audio, battery and sealing references behind every custom choice.
ExploreBuild your customized smart glasses SKU list
Send the options you want per SKU — colors, lenses, packaging, firmware and markets. We return MOQ, added lead time and unit pricing within five working days.
