What Bluetooth version does the K01 use?
K01 uses BLE 5.4 (Bluetooth Low Energy 5.4). It is the newest link generation among the K/D/E audio family — K02 and E13 publish Bluetooth 5.3, while D11 and D12 also publish 5.4. The link carries music, hands-free calls and temple touch commands to the paired phone.
What speaker does the K01 have and how does it sound?
K01 is fitted with a 1508 magneto (micro magnetic) speaker in an open-ear arrangement that fires toward the ear without sealing the ear canal. Music and calls stay audible to the wearer while conversations and ambient sound remain perceptible; by design it offers little passive isolation and is not comparable with sealed earbuds in loud noise.
What is the K01 battery capacity?
The published cell is a 3.8 V, 85 mAh battery — the smallest pack in the published CYNRIN open-ear family (K02 publishes 90 mAh × 2 and the D11/D12 publish 100 mAh). Capacity is the hardware ceiling; actual runtime depends on volume, codec and signal conditions.
How long does the K01 battery last?
Reference music playback time is 5–6 hours under the standard test profile — enough for a commute plus office listening with a daytime recharge. It is a reference figure: higher volume, call time and weak pairing signal reduce it. Standby time is not published.
How long does the K01 take to charge?
The published reference charging time is about 1.5 hours. The physical charging interface for K01 (magnetic contacts, pogo pins or USB) is not stated in the official record and is confirmed on the configuration sheet per order; K02 publishes magnetic charging, D11/D12 publish Type-C and E13 publishes a magnetic two-pin sleeve.
Which charging interface does the K01 use?
Not published. The K01 specification record gives the charging duration (about 1.5 hours) but not the connector or contact type. CYNRIN confirms the interface in writing before tooling, so specify your channel's accessory expectation (for example Type-C or magnetic) when requesting a quote.
What are the K01 frame made of and how much do they weigh?
The frame is published as PC + ABS (polycarbonate/ABS blend), the standard rigid, paintable housing material for high-volume audio glasses. Weight is not published for K01; lens, hinge and nose-pad materials are also not in the official record and are available on request.
What is the operating temperature range of the K01?
K01 is rated for operation from -10 °C to 60 °C, the only model in this family comparison publishing an explicit temperature envelope. Extreme cold or heat still shortens runtime and should be treated outside the reference playback figures; storage temperature is not published.
Is the K01 waterproof or sweatproof?
No IP rating or water/sweat resistance is published for K01, so it should not be marketed as waterproof. Treat it as an everyday indoor-and-commute frame and keep it out of rain and showers. If your channel requires a rated ingress level, raise it at brief stage for engineering confirmation rather than assuming one.
What colours does the K01 come in?
The published K01 finishes are Black, Navy blue and Gray, all with dark tinted sun lenses in a wayfarer frame shape. Pantone or custom OEM colours for branded production are evaluated against order quantity.
Can CYNRIN customize the K01 for my brand?
Yes. CYNRIN supports OEM and ODM projects including logo, colour, lens selection, packaging, documentation and product-definition review. Catalogue configuration typically starts at 500 units and branded OEM with logo and packaging at 1,000 units; engineering changes are evaluated separately, typically from 3,000–5,000 units.
What lens options are available for the K01?
Lens options are not published in the K01 specification record (unlike E13, which lists anti blue-light and prescription lens options). Confirm lens type, tint and any prescription track against your target quantity and market, and the team replies with the options available for K01 builds.
Are certifications and samples available for the K01?
CYNRIN lists CE, FCC and RoHS among its certification capabilities; the reports and configuration scope applicable to K01 are verified per destination market and provided on request. Mass production typically runs 15–40 days after deposit, with a written schedule confirmed after the product brief is reviewed.