Smart eyewear OEM/ODM manufacturer · Shenzhen, China +86 19835872450 sales@cynrin.com
Kids Smart Glasses

A05 Kids Smart Protection Glasses

The A05 is a kids smart glasses protection platform publishing a 40mAh cell, magnetic charging, a reference charge within about 2 hours, about 20h reference playback, an electronic anti-fog atomizer lens and posture and distance detection for child eye-comfort programmes on a configurable OEM line.

  • Electronic anti-fog atomizer in a lens-type configuration
  • Posture and distance detection as a published reminder feature
  • 40mAh cell paired with about 20h reference playback
  • Magnetic charging with a reference full charge within about 2 hours
  • Kids smart glasses protection platform for OEM branding
Order a sample
Battery capacity
40mAh
Charging method
Magnetic charging
Charging time
≤2h
Music playback time
~20h
Lens options
Electronic anti-fog atomizer (lens-type)
Features
Posture and distance detection

Runtime and charging figures are reference values recorded under defined conditions; frame colours, lens availability and packaging scope are confirmed on the configuration sheet per project in writing.

Platform capabilities

An eye-comfort kids smart glasses platform

Each capability below is taken directly from the published A05 specification record, which leads with lens clarity and posture/distance protection rather than a camera or wireless audio claim.

Anti-fog atomizer

The Lens options row publishes Electronic anti-fog atomizer (lens-type), a powered lens-treatment configuration that targets fogging during masks, temperature changes and active children's wear.

Posture alerts

The Features row reads Posture and distance detection, a reminder capability aimed at near-distance and seated-posture habits; the same protection feature is published on the A06 sibling column.

40mAh cell

A 40mAh battery is the published onboard capacity, the smallest cell in the kids table beside the 70mAh A07, supporting the protection-focused, low-power lens and reminder feature set.

About 20h playback

The record lists ~20h music playback time as a reference figure, matching the value published for both A06 and A07, so the family presents one long reference runtime across all three columns.

Magnetic charge

Magnetic charging with a reference time of up to 2 hours is common to the whole kids table, removing plug alignment for children and parents and matching the charge row printed for A06 and A07.

Child wearing the pink A05 kids smart protection glasses during reading
Designed around real use

Clarity and posture reminders for young wearers.

A05 targets the moments parents manage most: fogged lenses after a mask or temperature change, and a child drifting close to a screen or desk. The published record pairs an Electronic anti-fog atomizer (lens-type) with Posture and distance detection on a single kids smart glasses platform powered by a 40mAh cell.

Magnetic charging restores the frame within a reference time of about 2 hours, and the record lists about 20h of reference playback shared with the rest of the kids family. The A05 specification publishes no camera and no connectivity row, so wireless and imaging claims stay off the page and are confirmed on the configuration sheet per project.

  • 01 Screen-time and reading posture reminders
  • 02 Fog control during masks and weather changes
  • 03 Own-brand kids smart glasses protection lines
A05 on the CYNRIN line

A05 production assembles the lens-type electronic anti-fog atomizer and posture/distance sensing components into the frame, then performs low-voltage cell checks, fog-element inspection and charging-contact verification on the shared 20,000+ square metre campus; catalogue OEM MOQ 500 units.

See the manufacturing record
Engineering record

A05 Kids Smart Protection Glasses specifications

The published platform specification, grouped by engineering domain and maintained as system data. Values are confirmed in writing per project before tooling or mass production.

01

Power & Charging

Battery capacity
40mAh
Charging method
Magnetic charging
Charging time
≤2h
Music playback time
~20h
02

Physical & Optics

Lens options
Electronic anti-fog atomizer (lens-type)
Features
Posture and distance detection

Values are shown from the published CMS product record. Specification changes driven by component or firmware revisions are confirmed in writing on the proforma invoice before tooling or mass production; runtime and charging are reference figures.

Reading the numbers

What the A05 specifications mean in use

The cards below quote each A05 specification row verbatim and explain its procurement meaning within the three-column kids family. Runtime and charging figures assume defined test conditions.

Battery capacity 40mAh

The 40mAh cell is the smaller of the two capacities published in the kids table, where the camera-free A07 audio model lists 70mAh, signalling that A05 dedicates its power budget to the anti-fog lens element and posture/distance reminder rather than a wireless audio stack.

Nominal mAh is not a runtime guarantee; atomizer use, reminder frequency and temperature change the drain. Read the about-20h row as the reference outcome for the configured use profile.

Charging method Magnetic charging

Magnetic charging is the only method published across A05, A06 and A07, so a kids smart glasses programme can standardise on one contact-docking accessory and a parent-friendly, plug-free charging routine across the entire family line.

The value names the contact method but not charger wattage, dock shape or cable type; those accessory and electrical details are confirmed on the configuration sheet before tooling is released.

Charging time ≤2h

A reference full charge within about 2 hours is identical across all three kids columns, letting brands promise a predictable overnight or between-session recharge and bundle the same charging guidance across A05, A06 and A07 shipments.

Measured under defined conditions from a stated discharge state; cell age, ambient temperature and the charger used shift the actual time, and the record gives no fast-charging specification beyond the reference.

Music playback time ~20h

About 20h is the reference playback figure printed for every column in the kids table, including the audio A07, so the value should be presented as a long reference endurance baseline shared across the family rather than a number unique to the A05 protection configuration.

Reference value under a defined test profile; real results vary with volume, reminder frequency, anti-fog use and standby. The record does not break the figure down by feature state, so the profile is confirmed per project.

Lens options Electronic anti-fog atomizer (lens-type)

This is the protection feature that fills the family-table lens row for A05 and A06, while the A07 column publishes no lens option, giving the two protection models a clear, powered anti-fog differentiator aimed at fogging complaints in children's daily wear.

Only the lens-type atomizer description is published; power consumption, activation control and available tint or prescription substrates are absent and are confirmed on the configuration sheet per project.

Features Posture and distance detection

Posture and distance detection is the published reminder feature on A05 and A06, addressing near-viewing and slouching habits that buyers of kids smart glasses actively check; the A07 audio column publishes no equivalent protection feature row.

The record publishes the feature name without alert thresholds, sensor type, accuracy or app linkage, so CYNRIN does not claim specific distance values; behavioural parameters are confirmed per project.

Choose within the family

A05 vs the CYNRIN kids smart glasses platforms

Every cell comes from the published specification record of the model shown — no estimated or borrowed numbers. Gaps stay as Not published rather than being filled from a sibling model.

Published specification record per model across the kids family. Linked names open that product page.
Specification A05 A06 A07
Position Anti-fog, posture alerts Shared-platform protection Camera-free BT audio
Camera Not published Not published None (audio only)
Connectivity Not published Not published BT 5.4
Battery capacity 40mAh 40mAh 70mAh
Charging interface Magnetic charging Magnetic charging Magnetic charging
Reference charging time ≤ 2h ≤ 2h ≤ 2h
Reference playback time ~20h music ~20h music ~20h music
Protection feature Electronic anti-fog atomizer (lens-type) Electronic anti-fog atomizer (lens-type) Not published

A05 anchors the kids table as the anti-fog protection column: its Electronic anti-fog atomizer and Posture and distance detection fill the Protection feature row that A07 leaves Not published, and its 40mAh cell is smaller than A07's 70mAh. The Camera and Connectivity rows read Not published for A05 and A06 because their records contain no such specs, even though A07 publishes None (audio only) and Bluetooth 5.4; values are never copied between columns.

Applications

Where A05 fits

A05's published anti-fog lens and posture/distance feature point it at child eye-comfort and learning scenarios rather than capture or general audio use.

Child wearing A05 kids smart glasses during online learning at a desk

Study posture

Posture and distance detection gives reminders while a child reads or studies, and the lens-type anti-fog atomizer helps keep vision clear during mask wear or room-temperature changes during long learning sessions.

A05 protection glasses shown in a parent and retail education setting

Parent confidence

The protection-only feature set gives retailers a child-focused story without a published camera, while magnetic charging and the up to 2-hour reference charge simplify the daily routine parents actually manage.

A05 kids smart glasses presented as an own-brand product on retail shelving

Branded kids line

Optical chains and kids-accessory brands configure A05 from 500 catalogue units, applying logo, colourway and packaging to the anti-fog and posture platform while confirming lens and trim scope on the configuration sheet.

From brief to shipment

An A05 programme proceeds through Define, Configure, Validate and Produce; the full process, gates and deliverables are documented on the OEM/ODM process page.

  1. Define
  2. Configure
  3. Validate
  4. Produce
See the full OEM/ODM process
2018CYNRIN established in Shenzhen
20,000+ m²Self-owned production campus
500 pcsCatalogue OEM entry MOQ
15–40 daysTypical mass-production window
Project documents

Available on request

Buyer questions

A05 Kids Smart Protection Glasses FAQ

What is the A05 and what does it do?
A05 is a kids smart glasses protection model in the CYNRIN kids family. The published record lists an Electronic anti-fog atomizer (lens-type) lens option and a Posture and distance detection feature, powered by a 40mAh cell with about 20h of reference playback. Magnetic charging restores the frame within a reference time of up to 2 hours. The specification publishes no camera and no connectivity row, so A05 is positioned as an eye-comfort and reminder platform rather than an imaging or Bluetooth audio device.
What does the electronic anti-fog atomizer on the A05 do?
The Lens options row publishes Electronic anti-fog atomizer (lens-type), which describes a powered, lens-integrated treatment aimed at reducing fogging in conditions such as mask wear, humidity or moving between cold and warm air. It is the protection feature that fills the lens row for A05 and A06, while A07 publishes none. The record does not state activation method, power draw or clearance time, so CYNRIN confirms those operating details on the configuration sheet rather than quoting numbers the specification omits.
How does the posture and distance detection work?
The Features row reads Posture and distance detection, indicating a reminder function that responds to viewing distance or seated posture during reading or screen time. The same value is published for A06 but not for the A07 audio model. CYNRIN treats it as a reminder feature rather than a medical or corrective device: the record gives no sensor type, distance threshold, alert logic or clinical claim, and the behavioural parameters are confirmed on the configuration sheet for each project, never described as medical-grade protection.
What battery capacity and runtime does the A05 publish?
A05 publishes a 40mAh battery, the smaller cell in the kids comparison beside the 70mAh A07, together with about 20h of reference music playback time. That runtime figure is printed for A06 and A07 as well, so it is a shared family reference rather than a result unique to the anti-fog configuration. Real endurance varies with atomizer use, reminder frequency, volume where audio is configured, and temperature, and the record does not publish a feature-specific breakdown.
How is the A05 charged and how long does charging take?
The published charging method is Magnetic charging, the same contact-docking approach used by A06 and A07, and the reference charging time is up to 2 hours. Magnetic contacts remove the need for a child to align a small plug and allow one accessory design across the family. The specification does not name charger wattage, input voltage or dock geometry, so those electrical and accessory details are confirmed on the configuration sheet before tooling and packaging are finalised.
Does the A05 have a camera, Bluetooth or an app?
The A05 specification record contains no camera row and no connectivity row, so the family table renders both as Not published; CYNRIN does not borrow Bluetooth 5.4 from the A07 column. No companion application, microphone, speaker or wireless protocol is named for A05, and the model should not be sold as a connected device on the strength of this record. If a project requires a wireless link or app behaviour, engineering evaluates it as a new configuration and documents the result per project.
What lens, colour and frame options are available for the A05?
Only one lens value is published: Electronic anti-fog atomizer (lens-type). The record lists no frame material, weight, dimensions, colours or additional tint and prescription options, so those cells stay Not published rather than being filled from A06 or A07. Available colourways, lens substrates and cosmetic trims are configured against target age range, quantity and destination market, and CYNRIN confirms the exact option matrix in writing on the configuration sheet.
How does A05 compare with the A06 and the A07?
A05 and A06 publish byte-identical specifications: 40mAh, magnetic charging, up to 2 hours, about 20h, the same anti-fog atomizer lens and the same posture and distance feature, so they are trim and configuration expressions of one platform. A07 is a different, camera-free Bluetooth 5.4 audio model with a 70mAh cell and no published lens or protection feature row, which is why the kids table distinguishes the protection pair from the audio column.
What is the MOQ for an A05 catalogue or branded order?
Catalogue OEM entry begins at 500 units for the standard A05 platform with available trim options and basic logo treatment. Branded OEM with wider logo placement, custom packaging and fuller documentation typically starts at 1,000 units. Changes to lens electronics, the atomizer or frame structure are treated as ODM, typically evaluated in the 3,000-5,000 unit range, with the final threshold confirmed after engineering reviews the brief and target market.
What customisation is available on the A05 platform?
A05 supports OEM and ODM configuration across logo placement, colourway, frame trim, packaging structure, inserts and documentation language, with the lens-type anti-fog element as the published hardware feature. Because no colours are pre-published, the cosmetic matrix is built around the channel and destination market. Altering the atomizer assembly, adding connectivity or changing the sensing electronics moves the project from catalogue OEM into ODM scope and its higher MOQ band.
Are certifications and test reports available for the A05?
CE, FCC and RoHS are among CYNRIN's certification capabilities, with applicable reports and the tested configuration scope verified against the destination market and supplied on request; A05 is not claimed as certified for a specific region on the page. Because A05 is marketed for children, EU GPSR obligations and any market-specific kids-product requirements are addressed alongside the electronics certification set rather than assumed covered by a single certificate.
What sample and mass-production timing applies to the A05?
Sample timing for the configured A05 frame, anti-fog lens element and branding scope is scheduled and confirmed in writing after the brief is received. After deposit, mass production typically runs 15-40 days, varying with order quantity, packaging scope, trim configuration and certification documentation for the target market. The complete schedule, including samples, AQL inspection and export coordination, is agreed up front instead of being promised as a fixed date on the page.
How do we launch an A05 RFQ with CYNRIN?
Send target quantity, destination market, the intended age range, preferred colourway and lens scope, channel type and packaging expectations, together with any reminder-feature wording you plan to use. Engineering maps the A05 40mAh anti-fog and posture platform to the brief and replies with the configuration sheet, sample schedule, the applicable 500-unit catalogue or 1,000-unit branded MOQ tier and the certification scope for the region, so the Define gate starts with confirmed numbers.
Project desk

Configure the A05 for your market

Send your target quantity, lens and trim scope, kids-channel requirements and destination market. The team replies with the A05 configuration sheet, sample timing, MOQ tier and the certification scope applicable to your region.

Sample
Chat on WhatsApp
Your experience on this site will be improved by allowing cookies.