Shipping smart glasses with lithium batteries, by air and sea
Every unit contains a rechargeable lithium-polymer cell. That moves the carton into dangerous-goods territory regardless of destination: the UN38.3 test summary must exist before the first export, the packing instruction must match how the cell sits with the goods, and air freight adds its own state-of-charge and label rules.

UN38.3: the eight tests behind every legal shipment
Section 38.3 of the UN Manual of Tests and Criteria requires lithium cells and batteries to pass eight tests before transport. Evidence is tied to the cell/battery manufacturer and travels with the finished goods.
T.1Altitude simulation
Low-pressure environment simulating air-cargo hold conditions; checks sealing and venting behavior.
T.2Thermal test
Repeated high/low temperature cycling to stress seals, separators and electrical integrity.
T.3Vibration
Sweep vibration across frequencies representing transport vibration profiles on all axes.
T.4Shock
Half-sine shock pulses simulating handling impacts, applied to cells and batteries as specified.
T.5External short circuit
Short applied at defined temperature with resistance limits; checks thermal behavior and protection.
T.6Impact / crush
Mechanical abuse on cells, checking for dangerous thermal runaway under impact or crushing force.
T.7Overcharge
Forced charging beyond rated limits; validates that protection circuits prevent dangerous failure.
T.8Forced discharge
Cells forced into reverse-discharge conditions to verify safety margins against misuse.

What the forwarder actually asks for
The document most commonly requested is the UN38.3 Test Summary — a standardized summary identifying the cell/battery, manufacturer, test laboratory information and the eight test results, per the UN model format. CYNRIN supplies the cell supplier's summary for the exact cell fitted plus the finished-pack information your shipper needs.
Because the summary is cell-specific, changing battery vendor after certification creates a new documentation path — one more reason the BOM is frozen at PVT, consistent with the certified-unit-equals-shipped-unit rule on the certifications page.
PI966, PI967 or PI970 — which one fits your carton
The IATA packing instruction is chosen by how the battery is shipped relative to the equipment. Finished smart glasses assembled with the cell inside overwhelmingly use one of the first two.
The usual case for finished CYNRIN glasses: cells are installed inside the units. The instruction governs per-package quantity limits, inner protection against accidental activation, and the lithium-battery handling label/mark documentation for the package.
Applies when spare cells/batteries travel in the same package as devices they power — relevant when spare batteries are included as accessories or in service/kits shipments. Additional inner packaging and quantity rules apply.
Battery-only shipments (spare cells, warranty replacements sent separately). The strictest of the three for passenger-air carriage; commonly moved cargo-only or by sea, with shipper's declaration requirements.
| Parameter (lithium-ion) | Small-cell rule landscape | Smart-glasses reality |
|---|---|---|
| Cell Watt-hour rating | Below the small-cell threshold (20 Wh); cells in wearable eyewear are well under the larger-battery regimes. | Cell Wh figures are stated on the cell specification and in the shipping documents for the exact BOM. |
| Package net quantity | Quantity and labeling rules differ between the PI and between passenger/cargo aircraft. | Carton configurations and unit counts are designed against PI967 limits so master cartons ship without special re-packing. |
| State of charge (air) | Loose/extra batteries generally limited to no more than 30% state of charge for cargo-air acceptance under the rules. | Contained-in-equipment shipments follow the applicable equipment provisions; units ship at factory-charge settings aligned to the instruction. |
| Dangerous-goods documentation | Shipper's Declaration required for regulated (fully classified) shipments; excepted smaller configurations use lithium-battery marks and documents without the full declaration where permitted. | The freight forwarder determines the exact paperwork per booking; CYNRIN pre-supplies test summary, MSDS and packing data so the decision is fast. |
| Sea freight (IMDG) | Sea provisions for lithium cells/batteries under the IMDG Code are generally less restrictive on packaging than air, but UN38.3 remains mandatory. | High-volume FBA and distributor replenishment typically moves by sea with the same underlying battery file. |
UN number and lithium-battery handling mark on the applicable packages with contact/telephone fields where required.
Class 9 miscellaneous dangerous-goods hazard label on shipments whose packing instruction/quantity requires it.
Cargo-aircraft-only mark for packages not permitted on passenger aircraft under the applicable instruction.
Lithium-ion batteries ship under UN3480 (loose) or UN3481 (packed with/contained in equipment) as applicable.
Fragility, moisture and orientation marks plus carton count/weight data matching the packing list.
Test summary reference, MSDS/SDS and shipper paperwork travel with the master-carton documentation.
Mark selection follows the booked packing instruction and mode; artwork is prepared per shipment configuration.
The export document pack
Before the forwarder books space, CYNRIN assembles the file your logistics partner and the destination warehouse expect.
- UN38.3 test summary for the exact lithium-polymer cell fitted (UN model format).
- MSDS / SDS for battery and finished goods, issued in English for shipper and importer.
- Packing-instruction determination (PI966/PI967/PI970) with cell Wh, package quantity and gross data.
- Carton and pallet specifications feeding the dangerous-goods declaration or excepted-provisions paperwork.
- Commercial documents — invoice, packing list, HS classification and origin data for customs entry.
- FBA / retailer alignment — carton and label configuration matched to fulfilment-center inbound expectations.
Operational Incoterms, freight modes and fulfillment routing are on the shipping & logistics page; samples and pre-production shipments have their own rules, summarized on the samples page.
Choosing the mode for replenishment
High volume, predictable calendar
Lower freight cost and generally less restrictive lithium packaging provisions than air, with UN38.3 still mandatory. Standard choice for mass-production replenishment, FBA stock building and distributor containers. Door-to-door planning via the Incoterms and forwarder coordination described in logistics.
Speed for samples and launches
Fastest for PVT samples, certification units and launch stock, with stricter quantity, state-of-charge and label rules. Express couriers accept lithium-containing shipments under defined conditions when the full document pouch is ready at pickup — missing summaries are the common cause of express refusals.
Logistics and compliance questions
Which UN number applies to finished smart glasses?
Do small wearable cells still need UN38.3 testing?
Who provides the UN38.3 summary — CYNRIN or the cell maker?
Can we ship spare batteries together with the glasses?
What document problems most often delay a shipment?
Does Amazon FBA need the battery documents too?
Certifications overview
Where the battery transport file sits in the full pack.
Back 02Shipping & logistics
Incoterms, freight modes, pallet loading and FBA preparation.
Explore 03Sample shipments
How evaluation and pre-production units move by express.
Explore 04Request the file
Get the test summary and packing determination for your SKU.
StartBuilding the export document pouch for your first container?
List the destination and mode in the RFQ. Logistics and compliance return the packing instruction, marks, documents and timeline before pickup.
