Smart eyewear OEM/ODM manufacturer · Shenzhen, China +86 19835872450 sales@cynrin.com
Kids Smart Glasses

A06 Kids Smart Protection Glasses

The A06 is a kids smart glasses protection model on the same published platform as the A05, carrying a 40mAh cell, magnetic charging, a reference charge within about 2 hours, about 20h reference playback, a lens-type electronic anti-fog atomizer and posture and distance detection for branded child eye-care lines on a configurable OEM line.

  • Lens-type electronic anti-fog atomizer for clear daily vision
  • Posture and distance detection reminder for study habits
  • 40mAh cell with about 20h of published reference playback
  • Magnetic charging restored within about 2 hours reference time
  • Shared A05-platform kids protection model with its own trim scope
Order a sample
Battery capacity
40mAh
Charging method
Magnetic charging
Charging time
≤2h
Music playback time
~20h
Lens options
Electronic anti-fog atomizer (lens-type)
Features
Posture and distance detection

Playback and charging values are reference figures measured under defined conditions; the trim, colour and lens differences between A05 and A06 are configured per project and confirmed in writing on the configuration sheet.

Platform capabilities

A shared-platform kids protection expression

Every feature below is copied from the published A06 specification record. The numeric platform is identical to A05, so this page differentiates the two models only through configurable trim and programme scope, never invented specs.

Atomizer lens

A06 publishes Electronic anti-fog atomizer (lens-type) in the Lens options row, the same powered anti-fog configuration carried by A05 and absent from the A07 audio column in the kids comparison table.

Distance reminders

Posture and distance detection appears in the Features row, framing A06 as a habit-reminder product for reading and screen time; the record states no threshold, sensor type or medical claim.

40mAh platform

The 40mAh battery is the published cell shared with A05 and smaller than the 70mAh A07, reflecting a power budget built around fog control and intermittent posture reminders rather than audio streaming.

About 20h reference

Reference music playback time is printed as ~20h for A06, matching every other column in the three-model kids table, so endurance is a family-wide reference value rather than an A06-specific claim.

Contact charging

Magnetic charging with a reference full charge within about 2 hours is identical to the A05 and A07 rows, letting one parent-friendly contact dock and one charging instruction cover the whole kids range.

A06 kids smart protection glasses presented during a parent and retail education session
Designed around real use

A second protection expression on one proven platform.

A06 exists for buyers that want a second kids protection SKU without changing the engineering core: the published record mirrors A05 with an Electronic anti-fog atomizer (lens-type), Posture and distance detection, a 40mAh cell and about 20h of reference playback. Brand teams use the column to separate trim, packaging or channel treatment rather than to claim different hardware numbers.

Magnetic charging and the up to 2-hour reference charge carry over unchanged. Because the specification publishes no camera, connectivity, weight, material or colour row for A06, those fields are left as Not published and the genuine differences between A05 and A06 are defined on the configuration sheet per project instead of implied by borrowed data.

  • 01 Second-shelf kids protection SKU for retailers
  • 02 Region-specific trim and packaging on shared hardware
  • 03 Anti-fog and posture reminders for study routines
A06 on the CYNRIN line

A06 runs on the shared kids-protection assembly cell used for the A05 platform: the atomizer lens and posture/distance components are seated and checked under the same low-voltage and contact-charging QA stations on the 20,000+ square metre campus; catalogue OEM MOQ 500 units.

See the manufacturing record
Engineering record

A06 Kids Smart Protection Glasses specifications

The published platform specification, grouped by engineering domain and maintained as system data. Values are confirmed in writing per project before tooling or mass production.

01

Power & Charging

Battery capacity
40mAh
Charging method
Magnetic charging
Charging time
≤2h
Music playback time
~20h
02

Physical & Optics

Lens options
Electronic anti-fog atomizer (lens-type)
Features
Posture and distance detection

Values are shown from the published CMS product record. Specification changes driven by component or firmware revisions are confirmed in writing on the proforma invoice before tooling or mass production; runtime and charging are reference figures.

Reading the numbers

What the A06 specifications mean in use

Every card reproduces an A06 specification value verbatim. Because the numeric record matches A05 exactly, the procurement notes focus on how to position a shared-platform second SKU honestly.

Battery capacity 40mAh

The 40mAh value is identical to A05 and below the 70mAh published for A07, telling procurement that A06 sits on the low-power protection platform and that any A05-vs-A06 separation must come from trim, branding or packaging rather than a different cell.

Capacity is nominal and does not dictate fixed runtime; atomizer duty and reminder frequency alter drain, so the about-20h row remains a reference value under defined conditions rather than a guarantee.

Charging method Magnetic charging

Magnetic charging matches A05 and A07, which lets a brand operating both protection SKUs use one dock, one certification set for the charging path and one parent-facing charging explanation across the kids line.

The published row covers the contact method only; wattage, cable and dock dimensions are not printed, so accessory engineering confirms the exact interface on the configuration sheet for each order.

Charging time ≤2h

The reference charging time of up to 2 hours is common to the complete kids family, simplifying catalogue copy and retail expectations for A06 because the same turnaround figure is already verified for the A05 platform.

Results are measured from a defined charge state under defined conditions; temperature and charger specification change the outcome, and no fast-charge mode is published for the A06 platform.

Music playback time ~20h

About 20h is printed for A06, A05 and A07 alike, which supports a family-wide long-endurance positioning but prevents an honest claim that A06 lasts longer; the figure reflects a defined reference profile across the shared platform.

Reference playback only, measured under a set volume and use profile; anti-fog activation, reminders and standby change real results, and no per-feature power breakdown is published for A06.

Lens options Electronic anti-fog atomizer (lens-type)

The lens-type electronic anti-fog atomizer is the protection hardware A06 shares with A05, and it is the value that fills the family Protection feature row for both columns while A07 shows Not published, defining the two-model protection range.

Substrate, tint, prescription compatibility and atomizer controls are not published; a second trim cannot claim a different lens technology, and those optical options are confirmed on the configuration sheet.

Features Posture and distance detection

Posture and distance detection is the reminder feature shared with A05 and missing from A07, keeping A06 inside the protection category; it supports habit nudges during study without supplying a clinical measurement the record does not publish.

The specification names the feature but omits detection range, alert pattern, sensor and any medical validation, so marketing must avoid corrective or clinical claims and confirm behaviour per project.

Choose within the family

A06 vs the CYNRIN kids smart glasses platforms

Every cell comes from the published specification record of the model shown — no estimated or borrowed numbers. Gaps stay as Not published rather than being filled from a sibling model.

Published specification record per model across the kids family. Linked names open that product page.
Specification A05 A06 A07
Position Anti-fog, posture alerts Shared-platform protection Camera-free BT audio
Camera Not published Not published None (audio only)
Connectivity Not published Not published BT 5.4
Battery capacity 40mAh 40mAh 70mAh
Charging interface Magnetic charging Magnetic charging Magnetic charging
Reference charging time ≤ 2h ≤ 2h ≤ 2h
Reference playback time ~20h music ~20h music ~20h music
Protection feature Electronic anti-fog atomizer (lens-type) Electronic anti-fog atomizer (lens-type) Not published

A06 is the shared-platform protection column: its six published values are identical to A05, from the 40mAh cell and ~20h reference playback to the anti-fog atomizer and posture feature, so the model is differentiated by configured trim and channel scope rather than numbers. As with A05, the Camera and Connectivity cells read Not published because no such rows exist, while A07 alone publishes None (audio only) and Bluetooth 5.4.

Applications

Where A06 fits

A06's shared protection platform suits programmes that need a second kids smart glasses column for channel, region or shelf segmentation on identical published hardware.

Parent and child reviewing the A06 kids protection glasses together

Family routines

Posture and distance detection supports reading and homework habits, while the lens-type anti-fog atomizer addresses fogging during masks and weather changes, with magnetic charging kept simple for parents.

A06 kids smart glasses packaged as a region-specific branded SKU

Channel variant

Retailers use A06 as a second-shelf protection model, changing colourway, inserts and documentation against the shared 40mAh platform, with the real trim matrix confirmed per project rather than in a published spec.

A06 glasses in white-box packaging on a buyer sourcing table

White-box supply

Distributors configure A06 from 500 catalogue units for regional own-brand ranges, applying logo and packaging to the identical anti-fog and posture platform while keeping certification scope tied to the destination market.

From brief to shipment

An A06 programme proceeds through Define, Configure, Validate and Produce; the full process, gates and deliverables are documented on the OEM/ODM process page.

  1. Define
  2. Configure
  3. Validate
  4. Produce
See the full OEM/ODM process
2018CYNRIN established in Shenzhen
20,000+ m²Self-owned production campus
500 pcsCatalogue OEM entry MOQ
15–40 daysTypical mass-production window
Project documents

Available on request

Buyer questions

A06 Kids Smart Protection Glasses FAQ

What is the A06 and where does it sit in the kids range?
A06 is a kids smart glasses protection model built on the same published platform as A05. It carries an Electronic anti-fog atomizer (lens-type), Posture and distance detection, a 40mAh battery, magnetic charging, a reference charge within about 2 hours and about 20h of reference playback. The specification contains no camera or connectivity row, so A06 is an eye-comfort and habit-reminder product offered as a trim and channel expression of the shared platform.
What is the actual difference between A05 and A06?
On the published engineering record there is no numeric difference: A05 and A06 list the same 40mAh cell, magnetic charging, up to 2-hour reference charge, about 20h reference playback, Electronic anti-fog atomizer (lens-type) and Posture and distance detection. CYNRIN positions A06 as a second protection expression separated by trim, colourway, packaging or channel rather than by invented hardware. The precise configuration that distinguishes a given programme is confirmed on the configuration sheet per project.
How should buyers avoid misrepresenting the A05 and A06 relationship?
Marketing should state that A05 and A06 share one published platform with identical specification values, and that A06 is differentiated through cosmetic trim, branding, packaging or distribution scope. It would be inaccurate to claim a larger battery, longer runtime, different lens technology or added wireless features, because none of those appear in the A06 record. Retail copy, packaging and the configuration sheet should be aligned before production so the second-SKU story stays factual.
What does the anti-fog atomizer lens configuration include?
The Lens options row publishes Electronic anti-fog atomizer (lens-type), a powered lens-integrated anti-fog treatment shared with A05 and not published for A07. It is intended to reduce fogging under mask wear, humidity and temperature transitions. The record does not specify lens substrate, switching behaviour, power consumption or prescription compatibility, so CYNRIN does not quote those values; the operating and optical details are confirmed on the configuration sheet for the configured sample.
Can A06 claim to correct children's vision or posture medically?
No. The Features row publishes Posture and distance detection, which is a reminder capability, and the lens row describes an electronic anti-fog atomizer. Neither row supplies clinical evidence, a measured correction value or any medical clearance, and CYNRIN never describes the model as medical grade. Buyer-facing copy should frame the functions as comfort and habit nudges; any market-specific health claim must be substantiated separately and confirmed with regulatory counsel before sale.
What battery and runtime should the A06 packaging print?
Packaging should print the published 40mAh battery and the about-20h reference playback value with a conditions note, because the same ~20h figure is published for A05 and A07 and is measured under defined test conditions. Anti-fog activation, reminder frequency and temperature move real endurance, and the record gives no standby time or per-feature breakdown. CYNRIN confirms the final label wording and conditions text on the configuration sheet before mass production.
How does A06 charge and which accessories ship with it?
A06 uses Magnetic charging with a reference full charge within about 2 hours, the same contact method and reference time as A05 and A07, so one dock design can serve the family. The specification names no charger wattage, cable type, dock geometry or bundled accessory list, and those items are not copied from another model. CYNRIN confirms the accessory matrix, packaging inserts and regional cable requirements in writing on the configuration sheet.
Does A06 include Bluetooth, a camera, a microphone or an app?
The A06 specification record does not include connectivity, camera, microphone, speaker or companion-app rows, so those capabilities are not claimed and the comparison table shows Camera and Connectivity as Not published. The Bluetooth 5.4 value belongs to the A07 column and is not transferred to A06. If a buyer needs wireless functions, engineering evaluates a separate configuration under OEM or ODM scope and publishes its own tested specification rather than relabelling A06.
What colours, materials and lens substrates are offered for A06?
No colours, frame materials, weight, dimensions or additional lens substrates are published for A06, and the anti-fog atomizer is the only lens value in the record. Those cells therefore remain Not published instead of inheriting options from A05 or A07. Available colourways, cosmetic trims and optical substrates are selected with reference to age group, quantity and destination market, then documented on the configuration sheet for each project.
What is the MOQ for an A06 catalogue or branded programme?
Catalogue OEM entry starts at 500 units for the standard shared A05/A06 protection platform with available trim options and basic logo treatment. Branded OEM with broader logo placement, custom packaging and fuller documentation typically begins at 1,000 units. Changes to the atomizer lens, sensing electronics or frame structure fall under ODM, typically assessed in the 3,000-5,000 unit range once engineering has reviewed the brief.
How does customisation work when the platform is shared with A05?
Customisation focuses on logo, colourway, trim, packaging structure, inserts and documentation, allowing A05 and A06 to occupy different shelves or regions on one hardware core. Because the published specs are identical, no custom project should relabel one model with different battery or runtime numbers. Changes to electronics, lens function or frame geometry move the programme into ODM, require engineering review and carry the corresponding tooling and MOQ implications.
Are certifications available for the A06 and what about kids-market rules?
CE, FCC and RoHS are listed as CYNRIN certification capabilities, with reports and tested configuration scope verified for the destination market and supplied on request; A06 is not presented as certified for any single region on the page. For a children's product, buyers additionally manage GPSR obligations in the EU and any local kids-product documentation. The applicable report set follows the final configuration and is confirmed before shipment.
How do we start an A06 RFQ without conflicting with an existing A05 line?
Send the target quantity, destination market, intended shelf or channel separation from A05, preferred trim and packaging scope, age range and certification expectations. Engineering maps the shared platform to the brief and replies with the A06 configuration sheet, sample schedule, the 500-unit catalogue or 1,000-unit branded MOQ tier and market certification scope, so the two-SKU range is defined cleanly at the Define gate.
Project desk

Configure the A06 for your market

Send your target quantity, preferred trim and packaging scope, channel separation from A05 and destination market. The team replies with the A06 configuration sheet, sample timing, MOQ tier and the certification scope applicable to your region.

Sample
Chat on WhatsApp
Your experience on this site will be improved by allowing cookies.