What are the V03-PRO AI camera glasses?
CYNRIN confirms the V03-PRO as an 8MP AI camera glasses platform positioned around a photochromic adaptive lens. The published record lists an 8MP camera, a 220mAh battery, a Type-C charging interface with a reference charging time of no more than two hours, a reference music playback span of 5–8h, flexible temples, the single photochromic lens option and three colourways: Orange, Off-white and Black. It ships as a configurable OEM platform, so lens, colour and packaging scope are agreed per project rather than fixed as a closed retail product.
What camera does the V03-PRO use?
The published camera value is 8MP, the same resolution tier as the V03-T5 but without a named sensor; the L1-PRO, L2-ULTRA and S7 in the same family publish 13MP. The V03-PRO record does not publish sensor identity, photo resolution or format, video resolution, frame rate or onboard storage, and CYNRIN does not borrow those figures from the V03-T5. Any imaging detail beyond the 8MP label is confirmed on the configuration sheet for your project before claims are printed.
How long does the V03-PRO battery last?
The published battery capacity is 220mAh, and the published music playback time is 5–8h under reference conditions. CYNRIN presents this as a measured band rather than a fixed promise, because volume level, pairing behaviour and camera use all change the draw. The 220mAh cell matches the V03-T5 and sits below the 260mAh S7 and the 290mAh L1-PRO and L2-ULTRA; no video recording time is published for the V03-PRO, and that figure is confirmed per project.
How does the V03-PRO charge?
The published charging interface is Type-C, with a reference charging time of ≤2h (Type-C) under defined conditions. This separates it from the V03-T5's 2-pin magnetic USB dock, which lists an approximate 60-minute charge, and from the S7's magnetic charging. The two-hour value is a ceiling, not a guarantee; adapter wattage, cable quality and temperature affect the real session, and supported charger ratings are set out on the configuration sheet before mass production.
What is photochromic about the V03-PRO lens?
The published lens options record is a single value, Photochromic, meaning the lens is designed to adapt as light conditions change between indoors and outdoors. This is the V03-PRO's lead optical proposition: the V03-T5 offers blue-light filtering, sunglasses or photochromic tracks, while this column ships the adaptive lens only. The published record does not name transition speed, tint category at full darkness or the lens supplier, so those parameters and any test reports are confirmed in writing per order.
What colours and temple design does the V03-PRO offer?
The record lists three colours, Orange / Off-white / Black, and a temple design value of Flexible. It is the only column in the cam_tier1 table publishing either colourways or temple design, which gives brand buyers a documented way to merchandise colour without new tooling. Frame material, hinge construction, frame size and weight are not published for this model; Pantone-level colour matching and custom finishes are evaluated against the brief and confirmed on the proforma invoice.
What is the difference between the V03-PRO and the V03-T5?
Both publish an 8MP camera and a 220mAh-class cell, but the records diverge elsewhere. The V03-T5 names a Sony IMX219 4P sensor, JPEG up to 32MP interpolated, MP4 1200p30 video, 4 GB storage, Bluetooth 5.3 plus Wi-Fi, magnetic charging at about 60 minutes and three lens tracks. The V03-PRO instead publishes Type-C with a ≤2h reference charge, a 5–8h playback band, flexible temples, three colours and a photochromic-only lens. Choose the T5 for documented imaging detail and the PRO for adaptive-lens, Type-C positioning.
Does the V03-PRO support Wi-Fi or a companion app?
Connectivity and companion application are not published for the V03-PRO. In the cam_tier1 table only the V03-T5 publishes a radio record — Bluetooth 5.3 plus 2.4 GHz Wi-Fi (Wi-Fi 4) — and CYNRIN does not copy that stack onto the V03-PRO column. Buyers whose briefs depend on a specific Bluetooth version, a named companion app or wireless media transfer should raise the requirement at the Define gate so the applicable platform and its confirmed connectivity record can be matched in writing.
What is the MOQ for a V03-PRO OEM order?
CYNRIN confirms three entry points. Catalogue OEM configuration of the V03-PRO starts at 500 units, branded OEM with your logo and packaging starts at 1,000 units, and ODM engineering changes typically run at 3,000–5,000 units per project. With three published colourways and a photochromic lens, buyers often split the first batch across Orange, Off-white and Black; the team maps target quantity, channel and colour mix to the correct tier on the configuration sheet before any deposit.
Can the V03-PRO be customised for our brand?
Customisation covers logo placement, packaging structure, documentation scoping and the mix of the three published colourways, subject to order quantity. The photochromic lens and flexible temples remain the shared platform, and requests for fixed tint or blue-light lenses, different frame materials or structural changes are treated as ODM projects that typically require 3,000–5,000 units. Custom Pantone colours, lens tint specifications and retail-box artwork are evaluated against the brief and confirmed in writing.
Which certifications apply to the V03-PRO?
CE, FCC and RoHS are published as certification capabilities of the manufacturer, not as statements that the V03-PRO is certified in a specific configuration. CYNRIN confirms which reports apply to your lens, charging interface, radio and packaging configuration and verifies them per destination market. EU shipments additionally require a review of RED and market-specific documentation; the certification report index is provided at RFQ stage, with the applicable scope agreed before mass production begins.
How long can the V03-PRO record video continuously?
A dedicated video recording time is not published for the V03-PRO; the only published runtime figure is the 5–8h music playback band under reference conditions, and the published record does not include video resolution or storage either. CYNRIN therefore advises against quoting a continuous-record number taken from the V03-T5's approximate 40-minute figure. Continuous capture limits, clip length and file handling are confirmed on the configuration sheet for your exact configuration and firmware before tooling.
How do we start a V03-PRO project?
Send your target quantity, destination market, colourway mix, photochromic lens requirements and any branding or packaging scope. CYNRIN replies with the V03-PRO configuration sheet, sample timing, the applicable MOQ — 500 for catalogue OEM, 1,000 for branded and typically 3,000–5,000 for ODM changes — and the certification report scope for your market. The programme then moves through Define, Configure, Validate and Produce, with mass production typically scheduled 15–40 days after deposit.