Source: TVB News (無綫新聞) · October 22, 2026
原標題:灣仔會展國際眼鏡展下月舉行 有展品加入AI助盲人更有信心出行

In a TVB News report previewing the 34th Hong Kong International Optical Fair (4–6 November, HKCEE, with 600+ exhibitors from 14 countries and regions), CYNRIN showcased its AI-enabled smart eyewear.
The report featured two of our product lines:
- Children’s eye-care glasses — the lens fogs or the frame vibrates to alert children when they view screens or books too closely or with poor posture.
- Vision-assistance glasses — on-device AI paired with bone-conduction audio reads bus-stop signs aloud and detects obstacles, helping visually impaired users move around with greater confidence.
The coverage also highlighted frames manufactured from sustainable materials, reflecting our work on lower-impact eyewear production.
This summary is provided for convenience; the full video report and article are published on TVB News’ own website.



