Smart eyewear OEM/ODM manufacturer · Shenzhen, China +86 19835872450 sales@cynrin.com
AR Smart Glasses

AR Smart Glasses

The ARSMARTGLASSES is a Bluetooth-version AR smart glasses platform publishing Bluetooth 5.4, a 100mAh cell, magnetic charging, a reference charge within about 2 hours, about 8h reference playback and indicator light plus button control on a configurable OEM line.

  • Bluetooth 5.4, newer than the 5.3 radios published for E13 and V03-T5
  • 100mAh cell with about 8h reference music playback
  • Indicator light + button control for simple on-frame operation
  • Magnetic charging with a reference charge within about 2 hours
  • Configurable AR smart glasses platform for OEM and branded programs
Order a sample
Connectivity
Bluetooth 5.4
Battery capacity
100mAh
Charging method
Magnetic charging
Charging time
≤2h
Music playback time
~8h
Controls
Indicator light + button control

The ARSMARTGLASSES record publishes no display, waveguide, field of view, resolution, camera, app or voice-assistant specification, so none is claimed; playback and charging figures are reference values under defined conditions.

Platform capabilities

A connected AR column defined by its controls

The five capabilities below quote the six published ARSMARTGLASSES specification rows directly. Display hardware, camera and companion software are deliberately absent from the record and stay absent from this page.

Bluetooth 5.4

ARSMARTGLASSES publishes Bluetooth 5.4, a newer revision than the Bluetooth 5.3 connectivity of E13 and the Bluetooth 5.3 plus Wi-Fi of the camera-led V03-T5, giving this column the freshest radio family in the table.

100mAh cell

The published 100mAh battery sits between the E13 column, which prints no capacity row, and the 220 mAh / 3.85 V cell of V03-T5, whose imager and storage pipeline demand the larger power budget.

~8h playback

Reference music playback is published as ~8h, ahead of the About 5 hours figures on E13 and V03-T5; the tilde marks a conditional reference window rather than a fixed all-day guarantee across every volume level.

Indicator + button

Controls are published verbatim as Indicator light + button control, a hardware interaction model with no touchpad, gesture, camera shutter or app-dependence claim attached, keeping the column simple to explain.

No display claimed

The record contains no display, waveguide, field of view, resolution, camera or companion-app row, so ARSMARTGLASSES is presented as a connected AR smart glasses model on published facts only, with optical scope confirmed per project.

AR smart glasses worn during connected daily use with on-frame button control
Designed around real use

Connected wear with on-frame buttons.

ARSMARTGLASSES is the Bluetooth-version member of the AR family: Bluetooth 5.4 carries audio from a paired device, while the published Indicator light + button control keeps pairing, playback and power operations on the frame without assuming a touchpad or companion app. A 100mAh cell supports about 8h of reference playback.

Magnetic charging restores the frame within a reference ≤2h, using the same contact philosophy as the E13 sleeve while differing from its two-pin wording. The specification publishes no display, waveguide, field of view, resolution, camera, storage or app, so those cells read Not published and optical scope is confirmed on the configuration sheet per project.

  • 01 Connected daily audio with on-frame button operation
  • 02 Retail own-brand AR lines that avoid invented display claims
  • 03 Programs needing a newer Bluetooth revision than the 5.3 peers
ARSMARTGLASSES on the CYNRIN line

ARSMARTGLASSES production seats the Bluetooth 5.4 audio board and 100mAh cell, mounts and functionally checks the indicator light and button assembly, verifies magnetic contacts and RF pairing, and runs battery aging on the shared 20,000+ square metre campus; catalogue OEM MOQ 500 units.

See the manufacturing record
Engineering record

AR Smart Glasses specifications

The published platform specification, grouped by engineering domain and maintained as system data. Values are confirmed in writing per project before tooling or mass production.

01

Audio & Connectivity

Connectivity
Bluetooth 5.4
02

Power & Charging

Battery capacity
100mAh
Charging method
Magnetic charging
Charging time
≤2h
Music playback time
~8h
03

Physical & Optics

Controls
Indicator light + button control

Values are shown from the published CMS product record. Specification changes driven by component or firmware revisions are confirmed in writing on the proforma invoice before tooling or mass production; runtime and charging are reference figures.

Reading the numbers

What the ARSMARTGLASSES specifications mean in use

Each card quotes an ARSMARTGLASSES specification row verbatim and explains its procurement meaning against the E13 and V03-T5 columns. Runtime and charging figures remain reference values under defined conditions.

Connectivity Bluetooth 5.4

Bluetooth 5.4 is newer than the Bluetooth 5.3 published for both peers and is audio-only scope, because V03-T5 additionally publishes 2.4 GHz Wi-Fi (Wi-Fi 4) for its camera pipeline; ARSMARTGLASSES carries no Wi-Fi or app row of its own.

Only the revision is published; codecs, multipoint, range and latency are absent, and CYNRIN does not infer them, so wireless behaviour is confirmed on the configuration sheet before listings are printed.

Battery capacity 100mAh

The 100mAh cell is the mid-cluster capacity: E13 publishes no battery-capacity row at all, while V03-T5 lists 220 mAh / 3.85 V to support its 8MP Sony sensor, 4 GB storage and video recording workload.

Nominal capacity is not a runtime promise; the published ~8h music figure under a defined reference profile is the endurance value brands should quote, with no talk-time or standby breakdown listed.

Charging method Magnetic charging

Magnetic charging keeps this column in the contact-dock camp alongside E13's Magnetic two-pin charging sleeve and V03-T5's 2-pin magnetic USB, but each wording is a separate published specification and none should be treated as a shared accessory.

Pin count, dock shape, wattage and cable are not published for ARSMARTGLASSES, so accessory compatibility across columns is verified rather than assumed during Configure.

Charging time ≤2h

The reference ceiling of ≤2h is a rounded figure beside E13's About 70 minutes and V03-T5's approx. 60 minutes, so ARSMARTGLASSES quotes its own published interval without implying the shorter peer times apply to its cell.

The ≤ symbol marks a reference ceiling under defined conditions; charger capability, temperature and cell age change the result, and the record lists no separate fast-charge mode.

Music playback time ~8h

About 8h reference playback is the longest headline in the AR table, compared with About 5 hours on E13 and Up to 5 hours at maximum volume under reference test conditions on V03-T5, because the 100mAh cell feeds no camera or display load.

The tilde denotes a reference figure at a defined volume and pairing profile; calls, cold conditions and future enabled features shorten real use, and no talk-time or standby row is published.

Controls Indicator light + button control

Indicator light + button control is the exact published control specification, describing on-frame hardware operation; it is distinct from E13 and V03-T5, which publish lens options but no dedicated controls row in the record.

The wording does not establish touch input, voice wake, gestures or camera control, and in the family table the Controls / optics cell renders Not published for this column because it is keyed to lens rows.

Choose within the family

ARSMARTGLASSES AR platform vs CYNRIN display and audio references

Every cell comes from the published specification record of the model shown — no estimated or borrowed numbers. Gaps stay as Not published rather than being filled from a sibling model.

Published specification record per model. Reference columns anchor the AR platform to the closest mainstream configurations.
Specification ARSMARTGLASSES E13 V03-T5
Position BT5.4 button-controlled AR Lens-ready BT5.3 audio Flagship 8 MP AI camera
Connectivity BT 5.4 BT 5.3 BT 5.3
Battery capacity 100mAh Not published 220 mAh / 3.85 V
Charging interface Magnetic charging Magnetic two-pin charging sleeve 2-pin magnetic USB, approx. 60 minutes
Reference charging time ≤ 2h ≈ 70 minutes Not published
Reference playback time ~8h music ≈ 5 hours music up to 5 hours at maximum volume under reference test conditions music
Controls / optics Not published Anti-blue lens; myopia lens option documented Blue-light filtering, sunglasses or photochromic

ARSMARTGLASSES is the Bluetooth 5.4 column of the specialty AR table: it publishes a 100mAh cell, magnetic charging, ≤2h, ~8h playback and Indicator light + button control. E13 publishes Bluetooth 5.3, a magnetic two-pin sleeve, About 70 minutes, About 5 hours music and talk time, PC materials and Anti-blue lens; myopia lens option documented. V03-T5 publishes an 8MP Sony IMX219 camera, photo and video output, 4 GB storage, Bluetooth 5.3 plus Wi-Fi, the HeyCyan app, 220 mAh / 3.85 V, about 60-minute charging, up to 5 hours at maximum volume under reference conditions, frame size and three lens options. Because the table's Controls / optics row reads lens values, ARSMARTGLASSES shows Not published there even though its own Controls row is fully published; display, waveguide, FOV, resolution, camera, app and AI features are all absent from its record and no values are borrowed across columns.

Applications

Where ARSMARTGLASSES fits

The newer Bluetooth revision, long reference playback and button-based controls suit daily connected wear, own-brand retail ranges and markets that need disciplined AR claims.

Field worker wearing AR smart glasses with button control for connected audio

Connected field wear

Bluetooth 5.4 carries calls and media on site while Indicator light + button control lets users operate the frame with gloves or on the move, and the about-8h reference window covers a standard working day.

AR smart glasses with indicator light and button control worn in an office

Office and travel audio

The 100mAh cell and magnetic contact charging support daily calls and media through a reference about-two-hour recharge, with no app dependency claimed beyond the wireless audio link a buyer configures for the market.

AR smart glasses presented as an own-brand retail electronics product

Disciplined retail lines

Retailers launch the model from catalogue orders of 500 units as an honest AR smart glasses SKU, leading with Bluetooth 5.4 and on-frame controls while display and app scope is confirmed in writing before packaging is finalised.

From brief to shipment

An ARSMARTGLASSES programme proceeds through Define, Configure, Validate and Produce; the full process, gates and deliverables are documented on the OEM/ODM process page.

  1. Define
  2. Configure
  3. Validate
  4. Produce
See the full OEM/ODM process
2018CYNRIN established in Shenzhen
20,000+ m²Self-owned production campus
500 pcsCatalogue OEM entry MOQ
15–40 daysTypical mass-production window
Project documents

Available on request

Buyer questions

AR Smart Glasses FAQ

What is the ARSMARTGLASSES and what is it designed for?
ARSMARTGLASSES is the Bluetooth-version AR smart glasses model in the CYNRIN specialty AR family. Its published record lists Bluetooth 5.4, a 100mAh battery, magnetic charging, a reference charge time of ≤2h, about 8h reference music playback and Controls as Indicator light + button control. It is built for brands that want a connected AR smart glasses frame with simple on-frame operation, supplied as a configurable OEM and ODM platform rather than as a fixed display-equipped consumer product.
Does the ARSMARTGLASSES have a display, waveguide or heads-up overlay?
No display specification is published for this SKU. There is no waveguide, BirdBath, micro-LED, field of view, resolution, brightness or projection row in the record, so CYNRIN never describes ARSMARTGLASSES as an optical-see-through display device. The AR designation reflects its place in the AR smart glasses category and the Bluetooth-version architecture. If a programme requires a genuine display, that is a different product definition evaluated under ODM scope, with separate optics, tooling and MOQ implications.
Does the ARSMARTGLASSES include a camera or AI vision features?
No camera, sensor, photo, video or storage row is published for ARSMARTGLASSES, and the legacy AI Voice Interaction wording from older marketing copy has been removed because it referenced companion-app capability the specification does not contain. Camera and AI-vision features in this cluster belong to V03-T5, which publishes an 8MP Sony IMX219 sensor, JPEG and MP4 output and 4 GB storage. CYNRIN does not transfer those values, and marketing materials for this SKU must remain camera-free.
Is there a companion app or voice assistant?
The record publishes no Companion app row for ARSMARTGLASSES, so no app name, voice platform or AI assistant is claimed. In the same table, V03-T5 explicitly publishes HeyCyan; iPhone and Android compatible, which is a separate column and cannot be borrowed. Pairing and any future software behaviour are confirmed on the configuration sheet per project, and the older AI voice interaction claim must not be reused on listings, packaging or retail pages for this model.
What does the published Indicator light + button control mean?
Indicator light + button control is the verbatim Controls specification and describes on-frame status feedback together with physical button operation for functions such as power and playback management. The wording does not establish a touchpad, swipe gestures, voice wake word, camera shutter or app-controlled interface. In the family comparison, the Controls / optics cell is keyed to lens values and therefore renders Not published for this column, even though the dedicated Controls row itself is fully specified.
What connectivity does ARSMARTGLASSES publish, and how does it compare with peers?
Connectivity is published as Bluetooth 5.4, a newer revision than the Bluetooth 5.3 printed for both E13 and V03-T5, and V03-T5 additionally publishes 2.4 GHz Wi-Fi (Wi-Fi 4) for its camera and file-transfer workload. ARSMARTGLASSES publishes no Wi-Fi row. Only the Bluetooth revision is stated, so supported codecs, multipoint pairing, wireless range and latency are not inferred; those parameters are confirmed on the configuration sheet before technical claims are made at retail.
What battery capacity and runtime does the record publish?
Battery capacity is published as 100mAh and music playback time as ~8h. E13 publishes no capacity row and lists About 5 hours of playback, while V03-T5 carries a 220 mAh / 3.85 V cell and Up to 5 hours at maximum volume under reference test conditions to support its camera. The tilde marks a conditional reference value measured under a defined profile; real endurance varies with volume, calls, temperature and standby behaviour, and no talk-time row is published.
How does ARSMARTGLASSES charge and how long does it take?
Charging method is published as Magnetic charging with a reference charge time of ≤2h. This is contact charging in the same general family as E13's Magnetic two-pin charging sleeve and V03-T5's 2-pin magnetic USB, approximately 60 minutes, but each column keeps its own wording and timing. Pin count, dock geometry, charger wattage and cable are not published for ARSMARTGLASSES, so accessory compatibility is verified during Configure rather than assumed across the range.
What lens options, materials and colours are available?
ARSMARTGLASSES publishes no Lens options, Materials, frame size or Colours row, so those cells read Not published; the lens values in the table belong to E13 (Anti-blue lens; myopia lens option documented) and V03-T5 (Blue-light filtering, sunglasses or photochromic) and cannot be transferred. Available lenses, tints, colourways and frame finishes for this SKU are selected per channel and destination market during Configure and documented on the configuration sheet before artwork is released.
How does ARSMARTGLASSES compare directly with E13 and V03-T5?
ARSMARTGLASSES publishes Bluetooth 5.4, 100mAh, magnetic charging, ≤2h, ~8h and Indicator light + button control. E13 publishes Bluetooth 5.3, a magnetic two-pin sleeve, About 70 minutes, About 5 hours music and talk time, PC material and anti-blue with documented myopia option. V03-T5 is the imaging column with an 8MP Sony sensor, interpolated photo and 1200p video output, 4 GB storage, Bluetooth 5.3 with Wi-Fi, HeyCyan, 220 mAh / 3.85 V and about 60-minute charging. Each cell stays attached to its own SKU.
What claims is our marketing team allowed to make about the AR function?
The safe claims are the published ones: a Bluetooth-version AR smart glasses frame with Bluetooth 5.4, a 100mAh cell, magnetic charging, reference ≤2h charge, about 8h reference playback and Indicator light + button control. The team should avoid terms such as waveguide, HUD, holographic, AI, camera, translation display, app ecosystem or voice assistant, because none appears in this SKU's record, and the older AI Voice Interaction line has been intentionally retired. Claims about lenses must reference only options confirmed on the configuration sheet.
What is the MOQ for a catalogue or branded ARSMARTGLASSES order?
Catalogue OEM entry begins at 500 units on the standard Bluetooth 5.4 platform with available trim and basic logo treatment. Branded OEM, including broader logo placement, custom packaging and fuller documentation, typically starts at 1,000 units. Adding display hardware, a camera, touch controls or confirmed companion software changes the architecture and is handled as ODM, typically evaluated in the 3,000-5,000 unit range after engineering reviews the optical and electronics brief.
Which certifications and reports apply, and how do we start an RFQ?
CE, FCC and RoHS are among CYNRIN's certification capabilities, with the applicable report scope verified against the destination market and the tested Bluetooth configuration and supplied on request; no specific certification is claimed generically on the page. To start, send target quantity, market, channel, trim and packaging scope, and state whether any display, camera or software scope is expected. Engineering replies with the configuration sheet, sample schedule, the applicable 500-unit catalogue or 1,000-unit branded MOQ tier and certification scope, with mass production typically 15-40 days after deposit.
Project desk

Configure the ARSMARTGLASSES for your market

Send your target quantity, destination market, channel, trim and packaging scope, and state any display, camera or software expectations. The team replies with the configuration sheet, sample timing, MOQ tier and certification scope applicable to your region.

Sample
Chat on WhatsApp
Your experience on this site will be improved by allowing cookies.