Wholesale smart glasses, direct from the Shenzhen factory
Carton-based wholesale on production platforms — from a 500-unit catalog order with your logo to container programs on custom tooling — with compliance documents in your brand name, FBA-ready preparation and repeat-order pricing that stays predictable. The same minimums appear in your quotation; there is no hidden negotiation.
- Three published MOQ tiers: 500 · 1,000 · 3,000–5,000 units
- CE/FCC-ready platforms with brand-owned certificates and battery shipping files
- Sea and air logistics, FBA preparation and distributor pack-ins supported
Facility overview · press play to load the clip
Three ways to buy in bulk
The tiers are operational, not arbitrary: each threshold reflects what fills an SMT and assembly lot, absorbs print-run setup, or pays back new tooling.
Catalog private label
- Catalog platform, logo marking (laser or pad print)
- Catalog frame colors and lenses
- Firmware pairing ID and branded packaging/sticker option
- Stock evaluation units ship immediately; branded samples in 5–15 days
- Full compliance documents transferred in your name
For market entry, distributors, e-commerce sellers and gifting programs.
Branded OEM
- Custom Pantone frame colors with master-sample match
- Polarized / photochromic lens option
- Custom-printed retail box and branded accessories
- Companion-app identity and additional language packs
- Sample costs credited on orders above 1,000 units
For brand launches, retail listings and repeat catalog brands — see OEM manufacturing.
Custom ODM
- New industrial design with owned tooling
- Custom PCBA, optics and acoustic engineering
- Full firmware development and differentiated platform
- NRE/tooling amortized across the run (see payment terms)
- Dedicated stage-gated program: EVT → DVT → PVT
For flagship products and strategic lines — see ODM development.
Sub-minimums apply to individual choices — custom molded inserts (1,000–3,000), new molds per mold (3,000–5,000). The complete option-by-option table is on the MOQ policy page.
From sample request to repeat container
1 · Evaluate
Stock units immediately; 5–15 days for logo/packaging samples, one sealed as the golden sample defining production standard.
2 · Confirm SKUs
Platform, colors, lenses, packaging and target markets locked; quotation lists MOQ, NRE and milestones transparently.
3 · Deposit & build
Milestone deposits release materials and line time; AQL inspections at IQC/IPQC/OQC, with lot records maintained — see quality control.
4 · Certify & pack
Brand-owned CE/FCC filings and battery documents prepared; cartons configured for your channel's inbound rules.
5 · Ship & repeat
Sea for replenishment, air for launches; reorder economics improve as fixture and setup costs disappear from repeat runs.
Four landing configurations for bulk stock
Carton and pallet configuration is decided at packaging design, so master cartons are accepted without re-packing at the destination.
FBA / marketplace inbound
Carton marking, weight and labeling matched to fulfilment-center expectations; compliance pack (FCC/CE evidence, battery summary) ready for listing review.
Distributor warehouse
Bulk master cartons, palletized loading, multi-language pack-ins and distributor-branded shipping marks where contracted.
Retail DC delivery
Retail-ready inner packs, shelf packaging and carton labels aligned to big-box routing guides; EDI/label requirements handled per buyer.
3PL / DTC network
Direct injection to third-party logistics with product images and digital assets for listings supplied alongside the physical shipment.


What is included in the wholesale price
- Finished units on the selected platform and configuration
- Logo marking and agreed packaging/accessory scope
- Incoming, in-process and outgoing quality gates with lot records
- Compliance document pack prepared and certificates filed in your name
- Carton configuration and shipping-mark artwork per channel
- Pre-shipment product images and listing assets for catalog platforms
Quoted separately, never hidden
- NRE and tooling for custom ODM, amortized per the milestone schedule
- Third-party laboratory fees and specific-market registration costs
- Freight, insurance and duties under the chosen Incoterm (EXW/FOB/CIF/DDP supported)
- Sample invoices, creditable against bulk orders at 1,000+ units
- Optional inspections beyond the standard AQL gates
- App/marketplace services owned by third parties (see SIG listing)

One purchase order, several models
Distributors rarely launch on one SKU. Mixed orders across catalog platforms are accepted against the tier logic, with per-SKU marking and packaging runs scheduled together to protect line efficiency.
Camera, audio and sport platforms can share a container and a compliance document index, which is the fastest way for a distributor to build shelf breadth. Each SKU keeps its own golden sample and inspection lot; freight and document handling are consolidated once at booking. Tell us the target model mix and channel split — the quotation returns per-SKU MOQ applicability and the combined schedule.
Compare the production platforms on the model comparison page, or explore category families under AI camera glasses and Bluetooth audio glasses.
Bulk buying questions
What is the minimum order for wholesale smart glasses?
Can I order samples before committing to 500 units?
Do wholesale units ship with certifications included?
Can you ship directly to Amazon FBA?
How do reorder prices compare to the first order?
Which Incoterms and freight modes are available?
How do I know CYNRIN is the actual manufacturer, not a trading company?
MOQ policy in full
Every threshold and sub-minimum with the cost driver behind it.
Explore 02Lead times
Samples to mass production, with the calendar per tier.
Explore 03Private label program
The 500-unit branded catalog route in detail.
Explore 04Factory & facility
Lines, equipment and what to inspect on a factory audit.
Explore 05Production capability
How committed output, ramp curves and slot reservation actually work.
Explore 06In-process quality & AQL
The gate rules, defect classes and lot records behind every bulk order.
Explore 07OEM-ready model shelf
Mature camera, audio and sport platforms available from 500 pcs, with the change boundary to ODM.
ExploreSend your SKU mix and target markets — get the wholesale sheet.
The quotation returns per-unit pricing, one-time costs, certification scope, carton plan and a week-by-week schedule for your first bulk order.
