
The Radio Equipment Directive for Bluetooth smart glasses
The RED is the CE-marking engine for every wireless product sold in the EU. This page breaks its requirements into the three classic articles and the newer cybersecurity articles, maps them to the harmonised standards laboratories actually test against, and shows how the conformity assessment produces your Declaration of Conformity.
The three classic pillars of RED compliance
Every piece of radio equipment must satisfy the essential requirements. For smart glasses the engineering evidence is generated by in-house pre-scan and then formal testing on PVT-identical units.
Safety & health
Electrical, thermal and mechanical safety of the complete device, charger and battery under intended and reasonably foreseeable use, including protection objectives for human health and safety.
Typical standards: EN IEC 62368-1 (audio/video & ICT equipment safety); battery handling tied to cell evidence.
Electromagnetic compatibility
Radiated and conducted emissions stay within limits and the device has adequate immunity, so the glasses neither disturb nor are disturbed by other equipment in domestic and portable environments.
Typical standards: EN 55032 (emissions), EN 55035 (immunity) families, with radio-specific EMC standards applied to the transmitting configuration.
Effective use of the radio spectrum
The 2.4 GHz Bluetooth transmitter uses spectrum efficiently — output power, spurious emissions, adaptivity and receiver behavior — avoiding harmful interference to shared bands.
Typical standard: EN 300 328 family for wideband data transmission in 2.4 GHz ISM, against the specific Bluetooth configuration shipped.
The standards editions used are named on the DoC with dates — generic "CE approved" claims are not sufficient. Because module and firmware choices move the numbers, the RF architecture and antenna design are reviewed before EVT so that pre-scan data in the CYNRIN shielded lab predicts the external result rather than discovering a design flaw in week four of the certification window.
The cybersecurity layer connected eyewear now carries
Commission Delegated Regulation (EU) 2022/30 added three classes of protection for radio equipment capable of internet communication — smart glasses included. The harmonised standards route is the EN 18031 family.
3.3(d) · Network protection
The device must not harm the network or misuse it: resilient behavior against traffic overload, controlled network connection parameters and protection against network-mediated degradation. Relevant to glasses pairing and companion-app traffic.
3.3(e) · Personal data & privacy
Where personal data is processed — companion accounts, location, imagery, voice — the device must incorporate safeguards for personal-data protection and privacy, linking technical design to GDPR obligations of the brand and app operator.
3.3(f) · Fraud prevention
Safeguards against monetary fraud for equipment enabling electronic transactions — relevant where companion apps or future services handle payments; protected credential storage and secure-update design are the evidence themes.
The typical RED evidence matrix for smart glasses
| Requirement | Harmonised standard family | What the laboratory examines |
|---|---|---|
| Safety & health (3.1a) | EN IEC 62368-1 | Energy-source classification, thermal behavior under charge/discharge, mechanical durability relevant to safety, charger and battery protection circuits. |
| EMC emissions/immunity (3.1b) | EN 55032 / EN 55035 | Radiated and conducted emissions from the complete eyewear plus electrostatic discharge, surge, radiated and conducted immunity. |
| EMC for radio | EN 301 489 series (as applicable to configuration) | EMC requirements specific to short-range radio equipment, tested with Bluetooth active in defined modes. |
| Radio spectrum (3.2) | EN 300 328 | Effective radiated power, spurious emissions, frequency range, adaptivity and receiver categories for the 2.4 GHz transmitter. |
| Human exposure to EMF | Applicable EN EMF assessment standards | Evaluation against EMF exposure limits for the face-worn operating position, using the standard's assessment method. |
| Cybersecurity (3.3d/e/f) | EN 18031-1 / -2 / -3 | Asset and threat coverage, network protection, personal-data/privacy safeguards and financial-transaction protection against the shipped firmware. |
| Materials & environment | RoHS 2.0 / REACH (separate legislation) | Restricted substances and SVHC declarations per homogeneous material, compiled into the same technical file. |
Final standards editions are fixed at program kickoff against the selected SoC, module and firmware. When a listed standard is not yet harmonised in the Official Journal for a given article, the technical file documents the route used — this is exactly why the plan is written before tooling rather than inferred after test.
From pre-scan to the signed declaration
Internal pre-scan
RF, EMC and acoustic pre-compliance data captured in-house; high-risk failures fixed before external fees start.
External testing
PVT-identical samples tested by an accredited laboratory against the agreed standard editions; engineering answers technical queries.
Technical file
Reports, schematics, BOM, antenna spec, risk assessment, supplier declarations, labels and manuals compiled as the TCF.
DoC & CE mark
Brand signs the EU Declaration of Conformity, applies CE marking and places the product — with the file held ten years.

The certified unit must equal the shipped unit
The single most avoidable delay in eyewear electronics is retesting because the certified sample did not match mass production — different antenna clearance, a swapped crystal, a late battery vendor change. CYNRIN ships samples taken from the PVT pilot build, the same build that proves the production fixtures, so the laboratory certificate describes the product consumers actually receive.
Engineering changes after certification trigger a documented review: cosmetic changes do not; radio, antenna, enclosure-conductive or firmware-security changes can. That review is part of the change-control run through the quality management system.
Radio Equipment Directive questions
Is the RED the only directive smart glasses need for CE marking?
Can we rely on our Bluetooth module's RED test reports?
What is the role of a notified body under the RED?
Do firmware updates affect RED compliance?
How long is RED evidence valid?
Does RED testing cover the camera or microphone features?
EN 18031 deep dive
Device classes, assets and the three cyber standards in detail.
Continue 02Certification overview
EU and US test routes together with the handover pack structure.
Explore 03R&D stage gates
How EVT, DVT and PVT schedule the certification evidence.
Explore 04Request a quote
Get the RED article/standard matrix for your configuration.
StartWant the exact standards editions for your radio configuration?
Share the target module or SoC in the RFQ. Engineering returns the test set, standard editions, sample list and week-by-week RED schedule.
