Smart eyewear OEM/ODM manufacturer · Shenzhen, China +86 19835872450 sales@cynrin.com
Bluetooth Audio Glasses

D11 Bluetooth Audio Glasses

The D11 is CYNRIN's surround-sound Bluetooth audio glasses platform, combining a Bluetooth 5.4 radio, a 100mAh cell and universal Type-C charging with ~7h of reference music playback for buyers that want a wider open-ear sound field on the newer radio generation.

  • Bluetooth 5.4 radio for music and call audio
  • Published Surround sound feature for a wider open-ear field
  • Universal Type-C charging with a ≤2h reference ceiling
  • 100mAh cell supporting ~7h of reference music playback
  • D-platform audio programme for catalogue OEM from 500 units
Order a sample
Connectivity
Bluetooth 5.4
Battery capacity
100mAh
Charging method
Type-C
Charging time
≤2h
Music playback time
~7h
Features
Surround sound

Runtime (~7h) and charging (≤2h) are reference figures from the published record, measured under defined conditions. Surround sound is a published Features row; speaker layout and tuning details are not published, and operating temperature, frame material and lens options are confirmed on the configuration sheet per project.

Platform capabilities

Surround open-ear audio on Bluetooth 5.4

Every capability below is quoted from the published D11 specification record, which lists six rows including the Surround sound feature and universal Type-C charging.

Bluetooth 5.4 radio

The published Bluetooth 5.4 link carries music and call audio to the paired phone on the newest mainstream radio generation CYNRIN lists for audio glasses, pairing the D11 with the D12, LC twins and G07 rather than the 5.3 K02 and E13.

Surround sound field

Surround sound is the D11's published Physical & Optics feature: a wider open-ear presentation than a basic mono channel, and the only K/D/E column that carries a published Features row, although the record does not publish driver count or decoder format.

Type-C, refilled by ≤2h

The D11 charges over a universal Type-C interface rather than a proprietary magnetic dock, with a published empty-to-full reference ceiling of ≤2h, so retail packaging and after-sales cables follow the standard users already carry.

Music and call audio

As a Bluetooth audio glasses platform the D11 is presented for daily entertainment and calls over the same 5.4 link; microphone count and wind-noise performance are not published rows and are confirmed on the configuration sheet per project.

Head of the D line

The published record pairs the newer radio, universal Type-C and the surround feature on one frame, positioning the D11 as the feature-leading D-platform model for retail, distributor and own-brand programmes that still start at catalogue-OEM minimums.

D11 surround-sound Bluetooth audio glasses laid out with a Type-C cable
Designed around real use

A wider sound field on the newer Bluetooth generation.

The D11 answers buyers asking for a little more from an open-ear audio frame: the published record lists Surround sound alongside a Bluetooth 5.4 radio, a combination no other K/D/E column carries. A 100mAh cell supports ~7h of reference music playback, covering a workday of listening between charges.

Universal Type-C charging keeps the accessory story simple, refilling the frame within a ≤2h reference ceiling with the cable users already own. It is a platform built for channel lineups that want a visibly better-equipped audio SKU without moving into camera-glasses pricing.

  • 01 Entertainment-focused retail and distributor lineups
  • 02 Daily music, media and hands-free call use
  • 03 Catalogue OEM and branded audio programmes from 500 units
D11 on the CYNRIN line

D11 frames are assembled on CYNRIN's self-owned 20,000+ m² Shenzhen campus on the shared open-ear audio line used for the K, D, E and LC platforms, with Type-C port seating, acoustic sealing and RF verification in one flow and catalogue OEM from 500 units.

See the manufacturing record
Engineering record

D11 Bluetooth Audio Glasses specifications

The published platform specification, grouped by engineering domain and maintained as system data. Values are confirmed in writing per project before tooling or mass production.

01

Audio & Connectivity

Connectivity
Bluetooth 5.4
02

Power & Charging

Battery capacity
100mAh
Charging method
Type-C
Charging time
≤2h
Music playback time
~7h
03

Physical & Optics

Features
Surround sound

Values are shown from the published CMS product record. Specification changes driven by component or firmware revisions are confirmed in writing on the proforma invoice before tooling or mass production; runtime and charging are reference figures.

Reading the numbers

What the D11 specifications mean in use

The six D11 cards below quote the published specification word for word, including the Surround sound feature row, and explain what each value means for a buying decision. Runtime and charging are reference figures measured under defined conditions and vary with volume, phone and configuration.

Connectivity Bluetooth 5.4

Bluetooth 5.4 is the newest mainstream radio generation CYNRIN publishes for its audio glasses, and the D11 shares it with the D12, LC-105 twins and G07. The K02 and E13 remain on Bluetooth 5.3 and the K01 lists BLE 5.4, so the D11 leads with current-generation pairing and power behaviour.

Codec support, antenna range and multi-device pairing are not published; the exact radio module and firmware build are confirmed on the configuration sheet per project.

Battery capacity 100mAh

The D11 publishes a single 100mAh cell rather than the dual-cell layouts the K02 (90mAh × 2), LC twins and G07 (both 55mAh × 2) list. It is the same single-cell capacity the D12 publishes, packaged in one temple to keep the D-platform frame straightforward to tool and service.

Cell voltage, supplier and cycle-life ratings are not published; cell chemistry and UN38.3 shipping documentation are confirmed on the configuration sheet per project before shipment.

Charging method Type-C

Type-C is a universal, reversible charging interface, so users charge the D11 with the cable they already carry and retailers avoid stocking a proprietary dock. The D12 also publishes Type-C; the K02, LC twins, G07 and E13 publish magnetic charging instead, making Type-C a clear D-line identifier.

Charger wattage, cable-in-box policy and spare-cable pricing are not published; the accessory pack is confirmed in writing per project before retail packaging is finalised.

Charging time ≤2h

The published empty-to-full reference ceiling is ≤2h under defined conditions, which the D12, K02, LC twins and G07 also publish. It favours a between-shift or lunchtime top-up over the K01's reference 1.5 hours or the E13's about 70 minutes, while staying well inside an overnight charge.

Actual timing varies with charger wattage, ambient temperature and cell age; the reference test profile and adapter specification are not published and are confirmed per project.

Music playback time ~7h

At ~7h of reference music playback the D11 sits between the ~8h K02 and LC twins and the E13's about 5 hours, matching the D12 and the K01's reference 5–6 hours for a typical workday of listening. It is quoted as an approximate figure, not a guaranteed runtime.

Measured at a defined volume with a defined paired phone; high volume, call use and weak signal shorten the result, and talk time, standby time and mixed-use figures are not published.

Features Surround sound

Surround sound is the D11's one published Physical & Optics feature and makes it the only K/D/E model with a Features row at all: the published presentation is a wider open-ear sound field rather than sealed-ear immersion. The YK12 in the ultra-slim family also publishes Surround sound; the D12 record does not.

Driver count, channel routing, codec processing and tuning profile are not published; acoustic measurements and any branded equalisation are confirmed on the configuration sheet per project.

Choose within the family

D11 vs related CYNRIN audio-glasses platforms

Every cell comes from the published specification record of the model shown — no estimated or borrowed numbers. Gaps stay as Not published rather than being filled from a sibling model.

Published specification record per model, K, D then E platforms. Linked names open that product page.
Specification K01 K02 D11 D12 E13
Position Entry open-ear audio Value BT5.3 open-ear audio Surround BT5.4, Type-C audio D-platform alternate-finish build Lens-ready BT5.3 audio
Connectivity BLE 5.4 BT 5.3 BT 5.4 BT 5.4 BT 5.3
Battery capacity 3.8V / 85mAh 90mAh × 2 100mAh 100mAh Not published
Charging interface Not published Magnetic charging Type-C Type-C Magnetic two-pin charging sleeve
Reference charging time 1.5 hours ≤ 2h ≤ 2h ≤ 2h ≈ 70 minutes
Reference playback time ≈ 5-6 hours music ~8h music ~7h music ~7h music ≈ 5 hours music
Operating temperature -10°C to 60°C Not published Not published Not published Not published
Frame material PC+ABS Not published Not published Not published PC
Lens options Not published Not published Not published Not published Anti-blue lens; myopia lens option documented
Speaker / audio 1508 magneto Not published Not published Not published Not published

Within the K/D/E table the D11 is the only column that publishes the Surround sound feature and the first to pair it with Bluetooth 5.4, a 100mAh cell and Type-C; the D12 shares the same five radio and power rows but its own record carries no Surround row, so the feature must not be assumed for it. Operating temperature, frame material, lens options and speaker type are Not published for the D11 and are not borrowed from the K01. Treat runtime and charging as reference values.

Applications

Where D11 fits

The published D11 record — surround feature, newer radio, universal Type-C — points to three repeatable routes to market.

Acoustic test head measuring the D11 open-ear surround sound field

Entertainment & open-ear listening

The published Surround sound row and ~7h reference runtime suit music, video and gaming-on-the-go positioning, where a wider open-ear field sells the upgrade from basic mono audio glasses without sealing the ear.

D11 retail packaging prepared with a standard Type-C cable

Branded retail packaging

Universal Type-C charging lets distributors ship the D11 with standard cables and simple retail copy, while logo, colour, insert and quick-start card scope is configured per branded programme from the 1,000-unit OEM tier.

D11 audio glasses presented in a channel product lineup

Channel & distributor lineups

As the feature-leading D-platform model, the D11 headlines an audio tier next to the value K02 and the finish-variant D12, giving distributors a good-better-best story with shared accessories and a common certification path.

From brief to shipment

D11 programmes move through Define, Configure, Validate and Produce — see the full stages, timelines and deliverables on the OEM/ODM process page.

  1. Define
  2. Configure
  3. Validate
  4. Produce
See the full OEM/ODM process
2018CYNRIN established in Shenzhen
20,000+ m²Self-owned production campus
500 pcsCatalogue OEM entry MOQ
15–40 daysTypical mass-production window
Project documents

Available on request

Buyer questions

D11 Bluetooth Audio Glasses FAQ

What is the D11 and what does it do?
The D11 is CYNRIN's feature-leading open-ear Bluetooth audio glasses platform. The published record lists a Bluetooth 5.4 radio, a 100mAh cell, universal Type-C charging, a ≤2h reference charging ceiling, ~7h of reference music playback and a Surround sound feature. It plays music and media with a wider open-ear presentation and supports call audio over the same wireless link; it carries no camera or display.
Is the D11 the same product as the D12?
No — they are separate D-platform models. The published radio and power rows are identical: both list Bluetooth 5.4, 100mAh, Type-C, ≤2h and ~7h. The difference is in the published record itself: the D11 alone carries a Features row reading Surround sound, while the D12 is offered as a same-platform variant for differentiated appearance across markets. Appearance, finish and configuration scope are confirmed per project.
What does the published Surround sound feature mean?
Surround sound is the single value in the D11's published Features row, describing a wider open-ear sound presentation rather than sealed-ear cinema immersion. The specification record does not publish driver count, channel routing, decoder format or acoustic measurements, so those details are not claimed in headline copy. CYNRIN confirms tuning behaviour and any branded equalisation profile on the configuration sheet per project.
Why does the D11 use Bluetooth 5.4?
Bluetooth 5.4 is the newest mainstream radio generation CYNRIN publishes for audio glasses, and the D11 sits on it alongside the D12, LC-105 twins and G07. For stereo music and call traffic to one phone it provides current-generation pairing and power behaviour; the K02 and E13 remain on 5.3 and the K01 lists BLE 5.4. The exact radio module and firmware are confirmed per project.
How long does the D11 battery last?
The published music playback time is ~7h under reference conditions, measured at a defined volume with a defined paired phone. That matches the D12 and sits behind the ~8h K02 and LC-105 twins but ahead of the E13's about 5 hours. Higher volume, frequent calls and weak signal shorten the result; talk time, standby time and mixed-use figures are not published and are confirmed on the configuration sheet per project.
What does the single 100mAh battery mean for the design?
The D11 publishes one 100mAh cell rather than a dual-cell layout: the K02 lists 90mAh × 2 and the LC twins and G07 list 55mAh × 2, one cell per temple. A single cell concentrates the pack in one side, which simplifies cell bonding and service on the shared assembly line. Cell voltage, supplier and cycle-life figures are not published; chemistry and cell datasheets are confirmed per project.
How does Type-C charging work and how long does it take?
The D11 charges through a standard, reversible Type-C interface with a published empty-to-full reference ceiling of ≤2h under defined conditions. Buyers and users can therefore use ordinary Type-C cables and adapters rather than a proprietary magnetic dock, which also simplifies retail accessory packs. Charger wattage, cable-in-box policy and the reference test profile are not published and are confirmed on the configuration sheet per project.
Does the D11 support hands-free calls?
The D11 is a Bluetooth audio glasses platform presented for daily entertainment and calls, with call audio carried over the same Bluetooth 5.4 link. The published specification rows do not include microphone count, wind-noise performance or a separate talk-time figure, so those numbers stay out of headline claims. Call performance under a defined noise profile, including any custom tuning, is confirmed on the configuration sheet per project.
What frame material, lens options and temperature range apply?
None of those rows is published for the D11. Operating temperature, frame material and lens options are absent from the six published rows and render as Not published in the family table; they must not be borrowed from the K01, which separately publishes -10°C to 60°C and PC+ABS. Frame finish, colour range, lens type, hinge design and weight are confirmed on the configuration sheet per project before sampling or tooling is locked.
What is the MOQ for a D11 order?
Catalogue OEM configuration of the D11 starts at 500 units using catalogue colours, packaging and accessories. Branded OEM with custom logo, printed packaging and branded documentation typically starts at 1,000 units. ODM work involving structural, acoustic or electronic changes is evaluated separately and typically runs at 3,000–5,000 units. The final minimum is confirmed in writing against the concrete brief, because accessory and finish scope can shift the run size.
Can the D11 be customised for our own brand?
Yes. Logo placement, frame colour, painting finish, packaging inserts, quick-start documentation and retail cable packs are reviewed against target quantity and destination market. Because frame material and lens options are not published rows, finish and lens scope are agreed during sampling rather than assumed, and changes to the surround tuning or electronics fall under ODM terms. Every custom scope is confirmed on the proforma invoice before tooling or mass production begins.
Which certifications and lead times apply to the D11?
CE, FCC and RoHS are certification capabilities at CYNRIN, verified per destination market on request rather than blanket claims for a specific D11 build; share target markets at RFQ so the correct radio, battery-shipping (including UN38.3) and materials documents are scoped. Sample timing is confirmed after the brief is reviewed, and mass production typically runs 15–40 days after deposit, depending on quantity and customisation scope, with a written schedule agreed up front.
Project desk

Configure the D11 for your market

Send your target quantity, destination market, finish expectations, packaging scope and any Type-C cable requirements. CYNRIN replies with the D11 configuration sheet, sample timing, MOQ confirmation and the certification scope verified for your markets.

Sample
Chat on WhatsApp
Your experience on this site will be improved by allowing cookies.