Smart eyewear OEM/ODM manufacturer · Shenzhen, China +86 19835872450 sales@cynrin.com
AI Camera Glasses

MT6 AI Camera Glasses

The MT6 is an 8MP AI camera glasses platform built around a 265mAh cell, a 1200mAh foldable charging case and a published 158g frame weight, with about 7h reference playback for first-person capture on an OEM/ODM configurable line.

  • 8MP camera for hands-free first-person photo and video
  • 1200mAh foldable charging case for portable top-ups
  • Published 158g frame weight for lighter all-day wear
  • 265mAh cell with about 7h reference music playback
  • Reference charge within about two hours between sessions
Order a sample
Camera
8MP
Battery capacity
265mAh
Charging case capacity
1200mAh (foldable)
Charging time
≤2h
Music playback time
~7h
Weight
158g

Playback and charging figures are reference values measured under defined conditions; the charging interface and trim options are confirmed in writing on the configuration sheet per project.

Platform capabilities

The 8MP camera column with a foldable charging case

MT6 is the only 8MP case-charging model whose record publishes both a weight and a foldable case cell. Every capability below is quoted directly from its published specification record, with nothing estimated.

8MP first-person capture

The published 8MP camera shoots first-person photos and video from the frame, giving travellers and active users point-of-view footage without carrying or mounting a separate action camera.

265mAh internal cell

A 265mAh battery sits between the 260mAh KY06 and the 290mAh CY03 and CY05 columns, supporting about 7h of reference music playback across a travel day before the frame needs a dock.

1200mAh foldable case

The record publishes a 1200mAh (foldable) charging case, giving buyers a quoted case cell and a portable docking accessory; the foldable construction is the published descriptor on the specification row.

Published 158g weight

MT6 is the only 8MP case-charging column with a published weight, 158g, which lets procurement compare wearability on paper instead of waiting for a sample and helps plan packaging weight for export.

About 7h reference playback

About 7h of reference music playback aligns MT6 with the CY03 and CY05 platforms for full-day coverage, while the reference charging time of up to 2 hours restores the frame between sessions.

MT6 AI camera glasses with their foldable charging case laid out on a white-box table
Designed around real use

First-person capture that folds away between sessions.

MT6 pairs the 8MP first-person camera with a 265mAh cell and a published 158g frame weight, so the published record addresses both imaging and wearability in one column. When the frame is not in use, the 1200mAh foldable charging case docks it for a portable top-up rather than leaving wearers to find a cable.

The specification record lists about 7h of reference music playback and a reference charging time of up to 2 hours, a combination suited to travel days and destination content programmes. The charging interface, lens and finish rows are absent from the record and are confirmed on the configuration sheet rather than guessed.

  • 01 Travel and destination content with a published 158g frame
  • 02 Foldable case docking in pockets, packs and retail packaging
  • 03 Full-day capture programmes built on about 7h reference playback
MT6 on the CYNRIN line

On the shared Shenzhen campus, MT6 builds combine 8MP camera-module active alignment with hinge-cycle and contact-resistance QA on the 1200mAh foldable charging case, followed by aging and RF verification; catalogue OEM MOQ 500 units.

See the manufacturing record
Engineering record

MT6 AI Camera Glasses specifications

The published platform specification, grouped by engineering domain and maintained as system data. Values are confirmed in writing per project before tooling or mass production.

01

Imaging & Storage

Camera
8MP
02

Power & Charging

Battery capacity
265mAh
Charging case capacity
1200mAh (foldable)
Charging time
≤2h
Music playback time
~7h
03

Physical & Optics

Weight
158g

Values are shown from the published CMS product record. Specification changes driven by component or firmware revisions are confirmed in writing on the proforma invoice before tooling or mass production; runtime and charging are reference figures.

Reading the numbers

What the MT6 specifications mean in use

Each MT6 card pairs a printed value with what it changes in procurement and daily wear, and notes the rows the record leaves open. Charging and runtime figures are reference values measured under defined conditions.

Camera 8MP

The published 8MP camera places MT6 on the standard first-person imaging tier shared across the 8MP case-charging family, so buyers receive the same known capture baseline as the KY06, CY03, CY05 and MT5 columns rather than an unstated sensor or a 13MP premium tier.

Megapixels alone do not define image quality; sensor, optics and firmware tuning also shape results. Photo and video output detail beyond 8MP is not published and is confirmed on the configuration sheet.

Battery capacity 265mAh

The 265mAh cell positions MT6 between the 260mAh published for KY06 and the 290mAh published for CY03 and CY05, comfortably above the 220mAh MT5 and V03-PRO columns, giving a mid-to-large onboard energy budget inside the 8MP family.

Capacity is the hardware ceiling, not a runtime promise; capture frequency, playback volume and temperature alter drain. Read this row together with the about-7h playback figure rather than planning from mAh alone.

Charging case capacity 1200mAh (foldable)

MT6 is one of only three 8MP columns with a published case cell: 1200mAh described as foldable, alongside the 1400mAh cases listed for CY03 and CY05; KY06 and MT5 publish no case capacity, so buyers comparing portable reserve get a quoted figure here.

The foldable construction is the descriptor printed in the record; hinge mechanics and case-to-frame recharge cycles are not published. Case accessories and packaging scope are confirmed on the configuration sheet per project.

Charging time ≤2h

A reference charge within about two hours restores the MT6 frame between sessions or overnight, matching the reference time published for the other 8MP case-charging columns and supporting a dock-and-go rhythm across multi-day travel itineraries.

Reference figure measured under defined conditions; charger rating, case state and temperature shift the result. The MT6 record publishes no charging interface row, so cable versus contact detail is not quoted here.

Music playback time ~7h

The about-7h reference playback figure groups MT6 with the CY03 and CY05 platforms for full-day coverage, while KY06 and MT5 publish a 6-8h band; for buyers it sets a comparable planning baseline across the case-charging 8MP lineup despite different cell sizes.

Measured at a defined volume and pairing profile; video capture, calls, high volume and cold reduce real runtime. Standby and continuous recording time are not published in the MT6 specification record.

Weight 158g

MT6 is the only model in the 8MP case-charging comparison with a published weight at 158g, so importers and optical buyers can evaluate all-day wear and per-carton shipping weight on paper instead of waiting for a sample to arrive.

Weight covers the assembled frame as published; frame material, dimensions, lens options and colours are not published and stay Not published in the family table rather than being borrowed from another column.

Choose within the family

MT6 vs the CYNRIN 8 MP camera-glasses platforms

Every cell comes from the published specification record of the model shown — no estimated or borrowed numbers. Gaps stay as Not published rather than being filled from a sibling model.

Published specification record per model across the 8 MP case-charging family. Linked names open that product page.
Specification V03-PRO KY06 CY03 CY05 MT5 MT6
Position 8 MP photochromic Type-C Sport 8 MP, case-charged Long-runtime, 1400 case CY-platform variant Entry 8 MP, case-charged Foldable case, 158 g
Camera 8MP 8MP 8MP 8MP 8MP 8MP
Battery capacity 220mAh 260mAh 290mAh 290mAh 220mAh 265mAh
Charging case Not published Not published 1400mAh 1400mAh Not published 1200mAh (foldable)
Charging interface Type-C Magnetic charging + charging case Not published Not published Magnetic charging + charging case Not published
Reference charging time ≤ 2h ≤ 2h ≤ 2h ≤ 2h ≤ 2h ≤ 2h
Reference playback time 5–8h music 6–8h music ~7h music ~7h music 6–8h music ~7h music
Weight Flexible Not published Not published Not published Not published 158g

MT6 is the only 8MP column publishing a weight (158g) and carries a quoted 1200mAh foldable charging case, versus 1400mAh for CY03 and CY05 and no published case cell for KY06 or MT5. Its charging interface reads Not published because the record lists the case and charge time but no charging-method row, so the gap is left visible.

Applications

Where MT6 fits

The published weight, foldable case and 8MP record point MT6 at travel, mobile retail and field-content programmes where portability is part of the brief.

MT6 8MP camera module aligned and checked on an optical bench

Optical alignment QA

Active alignment of the 8MP module on the line keeps first-person footage consistent across a 500-unit run, a documented checkpoint buyers can reference when comparing MT6 against unweighted sibling columns.

MT6 camera glasses and foldable charging case arranged in a product flat lay

Travel-ready foldable kit

The 1200mAh foldable case and published 158g frame make MT6 a travel-friendly capture kit: wear the glasses through about 7h of reference playback, then dock them in the folding case between destinations.

First-person photo application demonstrated through MT6 camera glasses

Destination content

Tourism and destination brands deploy the 8MP first-person camera for hands-free footage, with the foldable case supplying portable reserve and the quoted 158g weight helping buyers promise comfortable all-day wear.

From brief to shipment

Every MT6 programme moves through Define, Configure, Validate and Produce; the full OEM/ODM process page lists deliverables for each gate, including foldable-case scope, before you request a quote.

  1. Define
  2. Configure
  3. Validate
  4. Produce
See the full OEM/ODM process
2018CYNRIN established in Shenzhen
20,000+ m²Self-owned production campus
500 pcsCatalogue OEM entry MOQ
15–40 daysTypical mass-production window
Project documents

Available on request

Buyer questions

MT6 AI Camera Glasses FAQ

What category of product is the MT6?
MT6 is an AI camera glasses platform: it captures first-person photos and video through an 8MP camera built into a frame with a published weight of 158g. Its record also lists a 265mAh battery, a 1200mAh foldable charging case, about 7h of reference music playback and a reference charge time of up to 2 hours, which positions it as the portable, case-equipped column of the 8MP camera family.
What does the published 8MP camera mean for image quality?
The 8MP figure is the camera resolution published for MT6 and matches the KY06, CY03, CY05 and MT5 columns; the 13MP tier belongs to other sports platforms outside this table. Megapixels set the capture baseline, while real image quality also depends on the sensor, lens alignment and firmware tuning. CYNRIN therefore confirms photo and video output detail on the configuration sheet instead of quoting imaging numbers absent from the record.
What is the MT6 battery capacity?
The published battery capacity is 265mAh. Within the 8MP table that places MT6 above the 220mAh MT5 and V03-PRO columns and just above the 260mAh KY06, while CY03 and CY05 publish 290mAh cells. Capacity is the onboard energy ceiling rather than a runtime guarantee, because capture frequency, playback volume, wireless conditions and temperature all change the real drain profile of a camera glasses frame.
How does the MT6 charge and how long does it take?
The record publishes a charging case capacity of 1200mAh described as foldable and a reference charging time of up to 2 hours, but it does not publish a charging-method or interface row. CYNRIN therefore does not claim magnetic contacts or a cable type for MT6; the exact charging interface and case-to-frame behaviour are confirmed on the configuration sheet per project rather than borrowed from a sibling column.
What weight, lens and frame options are published for the MT6?
The MT6 record publishes one physical parameter: weight at 158g, the only published weight in the 8MP case-charging table. It does not publish lens options, frame material, temple design, dimensions or colours, and CYNRIN does not fill those gaps from sibling models. Available tints, prescription options and cosmetic finishes are documented on the configuration sheet and confirmed per project and destination market.
How is the MT6 different from the CY03 and CY05 in the same family?
All three publish an 8MP camera, about 7h reference playback and a quoted charging case, but the cells and cases differ: MT6 carries 265mAh with a 1200mAh foldable case and a published 158g weight, while CY03 and CY05 publish 290mAh cells and 1400mAh cases with no weight row. MT6 also publishes no charging interface, so its docking detail is confirmed on the configuration sheet rather than assumed.
What is the minimum order quantity for the MT6?
Catalogue OEM entry for MT6 starts at 500 units, where the published 8MP platform with the 1200mAh foldable charging case is configured with available options and your logo treatment. Branded OEM with fuller logo, packaging and documentation scope typically begins at 1,000 units. ODM work involving structural or engineering changes, such as case modifications, is evaluated separately and typically lands in the 3,000-5,000 unit range.
Can CYNRIN customize the MT6 for our brand and market?
Yes. MT6 runs as an OEM/ODM configurable platform covering logo placement, colourway, lens and accessory selection, packaging structures and documentation scope. Because colours and lens options are not pre-published, the available trim matrix is confirmed against your quantity and destination market, and any structural change to the foldable case or frame is scoped as ODM with its own tooling review.
Which certifications apply to the MT6?
CYNRIN lists CE, FCC and RoHS among its certification capabilities rather than claiming MT6 is certified off the shelf. The specific reports, standards and configuration scope are verified against your destination market and provided on request, because requirements differ between the EU, US and other regions, and because the camera frame plus separate foldable charging case are assessed as the configured product ships.
Can we order samples and what is the lead time for MT6 production?
Samples, including the foldable charging case, are scheduled after the product brief is reviewed, with timing confirmed in writing rather than promised on the page. After deposit, mass production for catalogue and branded orders typically runs 15-40 days depending on configuration, packaging scope and order quantity. The exact schedule, including sample shipment and certification timing, is agreed up front for each MT6 programme.
What does the foldable charging case add to the MT6 package?
The published record describes the case as 1200mAh (foldable), which gives buyers a quoted reserve cell and a folding docking accessory distinct from the non-published cases on KY06 and MT5 and the 1400mAh cases on CY03 and CY05. Foldable mechanics, exact recharge cycles and bundled case accessories are not published, so CYNRIN confirms those details on the configuration sheet per project instead of estimating them.
Does the published 158g weight include the charging case?
The record publishes 158g on a single Weight row for MT6 and does not state whether the measurement covers the frame alone or the frame with accessories, so CYNRIN quotes 158g only as printed and confirms the weighing condition, along with carton and case weights for shipping, on the configuration sheet. No other 8MP case-charging column publishes a weight, which is why the family table shows 158g only in the MT6 column.
How do we start an RFQ or MT6 project with CYNRIN?
Send your target quantity, intended market, required lens or colour configuration and planned sales channel, along with any certification expectations and your interest in the foldable case scope. Engineering maps the MT6 catalogue platform to that brief and replies with the configuration sheet, sample timing, applicable MOQ tier and the certification scope relevant to your destination market, so the 500-unit entry point and any branded or ODM work are clear up front.
Project desk

Configure the MT6 for your market

Send your target quantity, lens and accessory preferences, colourway and destination market. The team replies with the MT6 configuration sheet, sample timing, MOQ tier and the certification scope applicable to your build.

Sample
Chat on WhatsApp
Your experience on this site will be improved by allowing cookies.