Smart eyewear OEM/ODM manufacturer · Shenzhen, China +86 19835872450 sales@cynrin.com
AI Camera Glasses

CY05 AI Camera Glasses

The CY05 is the same-platform counterpart to the CY03, an 8MP AI camera glasses model on a 290mAh cell with a 1400mAh charging case and about 7 hours of reference playback, offered for differentiated appearance and portfolio programmes.

  • 8MP first-person camera sharing the CY03 platform
  • 290mAh cell with about 7h reference playback
  • 1400mAh charging case carried over from the CY platform
  • Reference charge within about 2 hours under defined conditions
  • Variant SKU for market-differentiated camera glasses ranges
Order a sample
Camera
8MP
Battery capacity
290mAh
Charging case capacity
1400mAh
Charging time
≤2h
Music playback time
~7h

All runtime and charging values are reference figures from the published record under defined test conditions. CY05 publishes no colours or trim detail, so appearance differences are scoped per project in writing, not quoted as fixed specs.

Platform capabilities

A portfolio-differentiated 8MP camera platform

CY05 exists to give buyers a second expression of the proven CY power platform. Every capability listed below is read directly from the CY05 specification record, which mirrors the CY03 engineering sheet.

8MP shared imaging

The published 8MP camera is the same first-person capture tier used across the family, so brands adding CY05 to a range keep imaging behaviour consistent with CY03 rather than re-qualifying a sensor.

290mAh platform cell

The 290mAh battery matches the largest frame cell in the 8MP table and is identical to the CY03 specification, protecting the long-runtime experience across both variants of the platform.

1400mAh carryover case

The 1400mAh charging case is the same published case capacity used on CY03, letting a portfolio share case accessories, packaging geometry and charging documentation across both SKUs.

Differentiated appearance

CY05 is offered as a same-platform variant for differentiated appearance across markets; the official record leaves the specific colour and trim matrix open, so the difference is defined per project.

Portfolio efficiency

Sharing the published core with CY03 lets buyers run two market-facing models with aligned service parts and QA, while logo, finish and packaging separate the two on the shelf.

CY05 AI camera glasses displayed on a retail shelf as a differentiated own-brand variant
Designed around real use

One proven power platform, two ways to merchandise it.

CY05 carries the published 8MP camera, 290mAh cell and 1400mAh charging case unchanged from the CY platform, so its role is portfolio rather than engineering: a second shelf expression for brands that need separated appearance across regions, channels or price stories without a new power design.

About 7 hours of reference playback and a reference charge within about 2 hours apply as on the sibling platform. Because the record publishes no colours, materials or weight, any visible distinction is configured and confirmed on the configuration sheet rather than asserted as a fixed spec.

  • 01 Second camera-glasses SKU for regional brand ranges
  • 02 Shared case and service parts with the CY03 platform
  • 03 Channel-specific logo, finish and packaging differentiation
CY05 on the CYNRIN line

Because CY05 shares the CY03 core, line teams run the same 8MP active-alignment process and 1400mAh case contact-QA fixtures while applying the variant's configured cosmetic and packaging scope; catalogue OEM MOQ 500 units.

See the manufacturing record
Engineering record

CY05 AI Camera Glasses specifications

The published platform specification, grouped by engineering domain and maintained as system data. Values are confirmed in writing per project before tooling or mass production.

01

Imaging & Storage

Camera
8MP
02

Power & Charging

Battery capacity
290mAh
Charging case capacity
1400mAh
Charging time
≤2h
Music playback time
~7h

Values are shown from the published CMS product record. Specification changes driven by component or firmware revisions are confirmed in writing on the proforma invoice before tooling or mass production; runtime and charging are reference figures.

Reading the numbers

What the CY05 specifications mean in use

These cards quote the CY05 published rows verbatim. The record is the same engineering sheet as CY03, so the cards explain what each shared number means when the model is bought as a differentiated variant.

Camera 8MP

The published 8MP camera means CY05 enters a range on the same imaging baseline as CY03 and the rest of the family, supporting a two-SKU portfolio without forcing buyers to validate or market two different capture tiers.

Only resolution is published; sensor identity, optics, video format and storage are not in the record and are confirmed on the configuration sheet for whichever variant configuration is ordered.

Battery capacity 290mAh

The 290mAh cell is identical to CY03 and the largest published in the 8MP table, above 265mAh on MT6, 260mAh on KY06 and 220mAh on MT5, which is what keeps both CY variants aligned on the long-runtime positioning.

Nominal capacity is a hardware ceiling shared between variants; real drain still varies with capture use, volume, signal and temperature, and the about-7h playback row remains a reference figure.

Charging case capacity 1400mAh

Publishing the same 1400mAh charging case as CY03 means the two variants can share the case tooling, accessory SKUs and user documentation, reducing portfolio complexity while giving the range its largest published case reserve.

The record gives case capacity but not a guaranteed recharge count or the interface used to refill the case; conversion losses and configuration mean the top-up pattern is confirmed per project.

Charging time ≤2h

A reference charge within about 2 hours matches the CY03 sheet and the wider family, so service teams and retailers give buyers one consistent charging expectation across both variants rather than two different promises.

Measured under defined conditions on the platform charging path; the physical charging interface is not named in the CY05 record and is confirmed in writing on the configuration sheet.

Music playback time ~7h

About 7 hours of reference playback is the same published outcome as CY03, which matters for a variant strategy because the two SKUs can be separated on appearance and packaging while the runtime story stays identical.

Reference value at a defined volume and pairing profile; video, calls, cold and high volume shorten real runtime, and standby and continuous recording time are not published for the CY05 record.

Choose within the family

CY05 vs the CYNRIN 8 MP camera-glasses platforms

Every cell comes from the published specification record of the model shown — no estimated or borrowed numbers. Gaps stay as Not published rather than being filled from a sibling model.

Published specification record per model across the 8 MP case-charging family. Linked names open that product page.
Specification V03-PRO KY06 CY03 CY05 MT5 MT6
Position 8 MP photochromic Type-C Sport 8 MP, case-charged Long-runtime, 1400 case CY-platform variant Entry 8 MP, case-charged Foldable case, 158 g
Camera 8MP 8MP 8MP 8MP 8MP 8MP
Battery capacity 220mAh 260mAh 290mAh 290mAh 220mAh 265mAh
Charging case Not published Not published 1400mAh 1400mAh Not published 1200mAh (foldable)
Charging interface Type-C Magnetic charging + charging case Not published Not published Magnetic charging + charging case Not published
Reference charging time ≤ 2h ≤ 2h ≤ 2h ≤ 2h ≤ 2h ≤ 2h
Reference playback time 5–8h music 6–8h music ~7h music ~7h music 6–8h music ~7h music
Weight Flexible Not published Not published Not published Not published 158g

CY05's column is numerically identical to CY03 across camera, battery, 1400mAh case, charging and playback; its published role is the differentiated-appearance variant, which is reflected in the Position row rather than invented specs. Interface, weight and colours stay Not published because those rows are absent for CY05.

Applications

Where CY05 fits

CY05 fits portfolio and channel situations where the published CY power platform is constant but the shelf presentation needs to differ.

Retail shelf range showing CY05 as a differentiated camera glasses variant

Retail range split

Chains run CY03 and CY05 as two shelf expressions with the shared 8MP, 290mAh and 1400mAh core, separating the models by configured finish, logo and packaging for distinct shopper segments.

CY05 glasses and case in white-box sourcing configuration on a table

Regional variants

Distributors serving different markets configure the same platform with region-specific trim and documentation, keeping the published about-7h playback and case capacity identical across the variants.

Shared CY05 camera module under optical alignment inspection

Shared QA platform

Because the 8MP module and power system match CY03, both variants move through the same alignment and contact-QA process, simplifying incoming inspection and service-part planning for catalogue buyers.

From brief to shipment

CY05 variant programmes pass through Define, Configure, Validate and Produce, with the full gate-by-gate process and shared-platform notes on the OEM/ODM process page.

  1. Define
  2. Configure
  3. Validate
  4. Produce
See the full OEM/ODM process
2018CYNRIN established in Shenzhen
20,000+ m²Self-owned production campus
500 pcsCatalogue OEM entry MOQ
15–40 daysTypical mass-production window
Project documents

Available on request

Buyer questions

CY05 AI Camera Glasses FAQ

What exactly is the CY05?
CY05 is an AI camera glasses model and the same-platform counterpart to CY03. Its published record lists an 8MP first-person camera, a 290mAh battery, a 1400mAh charging case, reference charging within about 2 hours and about 7h music playback. Rather than introducing a new power design, CY05 is offered as a variant for differentiated appearance across markets, channels or portfolio tiers.
Is the CY05 camera different from the CY03 camera?
No published engineering difference exists: CY05 prints the same 8MP camera as CY03 and every other column in the 8MP family. The variant distinction is not a sensor or resolution change, and CYNRIN does not claim imaging behaviour that the record does not publish. Sensor model and video or photo output detail beyond the 8MP figure are confirmed on the configuration sheet if your RFQ requires them.
What battery and charging case does the CY05 publish?
The CY05 record lists a 290mAh frame battery and a 1400mAh charging case, numerically identical to CY03 and the largest case capacity in the family table, above MT6's 1200mAh foldable case. This shared power system is deliberate: both variants use the same core energy design, while their appearance, logo treatment and packaging can be configured separately for different markets.
How long does the CY05 run and take to charge?
Reference music playback is about 7 hours and reference charging time is up to 2 hours, both measured under defined conditions and quoted as reference figures. Real playback moves with volume, capture load, call time, Bluetooth signal and temperature. The physical charging interface is not published in the CY05 record, and standby and continuous recording durations are not printed either.
What visible differences between CY05 and CY03 are guaranteed?
None are guaranteed by the specification record: the published engineering values are identical, and no colours, materials, temple design, lens options or weight are printed for CY05. The model is intended for differentiated appearance, but the actual colourway, trim and packaging differences are configured against quantity and market and confirmed in writing on the configuration sheet rather than asserted here.
Why would a brand buy both CY03 and CY05?
A brand uses the two SKUs to separate shelf positions without maintaining two engineering platforms: the shared 8MP camera, 290mAh cell and 1400mAh case keep performance, service parts and accessory packs aligned, while configured logo, finish and packaging give each model a distinct role for a region, retailer or price segment. That portfolio logic is the published reason CY05 exists as a same-platform variant.
Which colours, lenses and frame materials are available on the CY05?
The CY05 specification record publishes no colours, lens options, frame materials, temple design or weight, so the comparison table marks them Not published rather than borrowing values from V03-PRO or other siblings. Available options are built per project: buyers state the target market and channel, and CYNRIN confirms the tint, prescription, finish and material options on the configuration sheet.
What is the MOQ for the CY05?
Catalogue OEM entry starts at 500 units for the standard platform with available options and logo scope, the same entry threshold as the rest of the family. Branded OEM with dedicated packaging and fuller branding typically starts at 1,000 units. Engineering or structural changes beyond the shared platform are treated as ODM and typically evaluated around 3,000-5,000 units after the brief is reviewed.
Can we customize CY05 differently from CY05's sibling models?
Yes. Logo placement, colourway, lens and accessory selection, case packaging, inserts and documentation can all be configured per variant, which is how the two same-platform models are separated at retail. Tooling-level changes to the frame, electronics or case move the programme into ODM rather than catalogue OEM. The available cosmetic matrix is confirmed against your quantity and market because no trim is pre-published for CY05.
Which certifications cover the CY05?
CYNRIN lists CE, FCC and RoHS as certification capabilities and does not claim CY05 is certified for a specific market on this page. The applicable reports, standards and exact tested configuration are verified for the destination region and provided on request. Because CY05 can be trimmed differently from CY03, certification scope is confirmed against the specific configured product rather than assumed from the shared platform.
What are the sample and lead-time arrangements for CY05?
Samples are scheduled after the variant brief, including any cosmetic scope, is reviewed, and timing is confirmed in writing. Mass production typically runs 15-40 days after deposit, varying with quantity, packaging, finish configuration and documentation needs. Sharing the CY03 core can simplify sample validation, but the written schedule is issued per programme rather than copied from the sibling model.
Does CY05 use a magnetic or Type-C charging interface?
The charging interface is not published for CY05; the record states the reference charging time of up to 2 hours and the 1400mAh charging case, but it does not name the connector or contact type. CYNRIN therefore does not assign the magnetic method printed on KY06 and MT5 or the Type-C printed on V03-PRO to this column, and confirms the interface in writing per project before tooling.
How do we start a CY05 variant programme?
Send the target quantity, destination market, intended differentiation from CY03 (finish, logo, packaging or channel role) and the lens or colourway scope you need. Engineering maps the shared platform to that brief and replies with the configuration sheet, sample timing, the applicable 500-unit catalogue or 1,000-unit branded MOQ tier and the certification scope, starting the programme at the Define gate.
Project desk

Configure the CY05 for your market

Send your target quantity, desired differentiation from CY03, trim and packaging scope and destination market. The team replies with the CY05 configuration sheet, sample timing, MOQ tier and applicable certification scope.

Sample
Chat on WhatsApp
Your experience on this site will be improved by allowing cookies.