What is the CY03 and what does it do?
CY03 is a long-runtime AI camera glasses model in the 8MP family: an 8MP first-person camera in the frame handles photos and video hands-free, while a 290mAh cell and a published 1400mAh charging case extend time away from power. The record lists about 7h reference music playback and a reference charge within 2 hours, which frames it for travel and extended event capture rather than short, desk-tethered use.
What does the 8MP camera on the CY03 deliver?
The published camera resolution is 8MP, the same standard first-person tier printed for every column in the family comparison, so CY03 buyers standardise on a known capture baseline rather than a 13MP premium sensor. Resolution alone does not determine footage quality, and sensor model, storage capacity and video output detail are not published, so CYNRIN confirms those engineering parameters on the configuration sheet for each project.
What battery capacity does the CY03 use?
The published frame battery is 290mAh, the largest cell in the 8MP table and shared only with CY05; MT6 publishes 265mAh, KY06 260mAh, and MT5 and the V03-PRO reference 220mAh. That nominal capacity is the energy ceiling inside the frame, and it should be read together with the separate 1400mAh charging case rather than treated as the total energy a traveller carries.
How long does the CY03 last on a charge?
Reference music playback time is published as about 7 hours under defined test conditions. CYNRIN treats that as a reference value because actual results move with playback volume, video capture frequency, call use, Bluetooth signal and ambient temperature. Standby time and continuous video recording duration are not printed in the CY03 record, and the 1400mAh case extends total coverage through repeated dockings.
What is the 1400mAh charging case for and how many charges does it give?
The 1400mAh charging case is published as part of the CY03 power system and is the largest case cell in the family, above MT6's 1200mAh foldable case. A fixed number of full recharges cannot be quoted from capacity alone because of conversion losses and the frame's charge state, and the record does not publish that arithmetic; the realistic top-up pattern is confirmed on the configuration sheet per project.
Which charging interface does the CY03 use and how long does charging take?
The published reference charging time is up to 2 hours. The physical charging interface is not printed in the CY03 specification record, even though the V03-PRO reference publishes Type-C and other siblings publish magnetic charging, so CYNRIN does not assign a connector from another column. The interface and the method for refilling the 1400mAh case are confirmed in writing before tooling.
What frame materials, lens options, colours and weight apply to the CY03?
Those fields are not published for CY03: the specification record contains no materials, lens options, temple design, colours or weight rows, so the comparison table leaves them as Not published. Available tint, prescription and cosmetic options are configured against target quantity and destination market. CYNRIN confirms the exact matrix on the configuration sheet rather than borrowing values from V03-PRO or other siblings.
How does CY03 compare directly with CY05?
The published engineering record for CY03 and CY05 is identical: both list an 8MP camera, a 290mAh battery, a 1400mAh charging case, charging within about 2 hours and about 7h playback. CY03 is presented as the long-runtime, travel-ready expression of that shared platform. Differences between the two are market and trim configuration rather than published numeric specs, and are defined on the configuration sheet per project.
What is the MOQ for a CY03 catalogue or branded order?
Catalogue OEM entry begins at 500 units, covering the standard CY03 platform with available options and basic logo treatment. Branded OEM with fuller logo placement, packaging and documentation scope typically starts at 1,000 units. Structural or electronic engineering changes are handled as ODM, typically evaluated in the 3,000-5,000 unit range, with the final threshold confirmed after engineering reviews the brief.
What customisation is available on the CY03 platform?
CY03 supports OEM and ODM configuration across logo, colourway, lens and accessory selection, case packaging, inserts and documentation scope. Because no colours or lens options are pre-published for CY03, the available option matrix is built around your channel and destination market. Any change to the charging-case tooling or frame electronics moves the project from catalogue OEM into the ODM scope and MOQ band.
Are certifications and test reports available for the CY03?
CE, FCC and RoHS are listed among CYNRIN's certification capabilities; CY03 is not claimed as certified for a specific market on the page. Applicable reports, standards and the tested configuration scope are verified against the destination region and supplied on request, because the certificate set for an EU shipment differs from a US or other-market shipment and follows the configured product.
What sample and mass-production timing applies to the CY03?
Sample timing for the CY03 frame and 1400mAh case configuration is scheduled and confirmed in writing after the brief is received. After deposit, mass production typically runs 15-40 days, varying with order quantity, packaging scope, lens or trim configuration and certification documentation. The end-to-end schedule, including samples and export coordination, is agreed up front rather than promised as a fixed date on the page.
How do we launch a CY03 RFQ with CYNRIN?
Send target quantity, destination market, preferred lens and colourway scope, channel type and any case or packaging expectations. Engineering maps the CY03 290mAh plus 1400mAh platform to the brief and replies with the configuration sheet, sample schedule, the applicable 500-unit catalogue or 1,000-unit branded MOQ tier and the certification scope for the region, so the programme can start at the Define gate with clear numbers.