An ingress rating is a claim about a sealed assembly, and a sealed assembly is a manufacturing decision before it is a marketing one. The two characters on a datasheet settle very little: what they actually settle is which configuration was tested, what the rating excludes, and whether the document behind it can be produced when your channel asks. Choose on that basis and the marking becomes a specification you can defend. Choose on the digits alone and the first question from a compliance reviewer, a marketplace or a retailer will arrive with a product page that already answers it wrongly.
IP rating: a sealed configuration, not a product
The buying task that produces the question
Two different decisions are usually being made at the same time, and they are confused for each other. The first is whether the channel's environment warrants a rating at all: rain on a temple, sweat on a contact, dust on a lens, a pressure washer in a yard, a salt spray on a beach. The second is which supplier can build the configuration you have written down, evidence it, and ship it without the programme being rebuilt in the middle. The first question is answered by your channel research, and it is cheap. The second question is answered by the supplier's file, and it is the one that costs you a quarter of your launch schedule.
What the reader of this article is usually doing is comparing two or three quotations, all of which print a two-character code, and trying to work out which one is actually being quoted. The fear underneath that comparison is rarely the unit price. It is a shipment that arrives with a different seal line from the approved sample, a certificate that names a model the buyer is not selling, or a returns trend in one channel that nobody in the chain can explain because nobody ever agreed what the marking covered.
All three of those are cheap to prevent at the quotation stage and expensive to prevent afterwards, and the reason is a scheduling fact rather than a technical one. The documentary work runs on the brand's own timeline, not on the factory's, and the packaging artwork sits at the end of it. A decision taken in week three becomes a reprint in week twelve.
What the marking costs to build, and what it costs to evidence
An ingress rating is not a sticker applied to a finished product. It is a set of design decisions — a seal line, an interface treatment, a port cover, a button seal, a choice of material at the contact — and each one is a tooling item, an inspection item and a validation item. That is why two products with identical electronics can carry different codes, and why a quotation that is lower on unit price can be higher across the whole programme.
The cost breaks into four parts, and only one of them appears on the invoice.
The design change. Sealing a frame means changing geometry, adding material and adding process. A supplier who answers "minor redesign" has not scoped the work, because minor redesign is not a cost line, it is a sign that nobody has yet decided which parts change.
The test. A laboratory fee and a queue. The fee is per configuration, and the queue belongs to the laboratory rather than to your order size. Pressing on either of them does not make the product arrive sooner.
The paperwork. The declaration of conformity, the technical file, the model list, the labelling per market. Where a range covers several models and several markets, this is the part that quietly multiplies, because each model list is a separate question and each market is a separate label set.
The variant tax. The hardest to see and the most expensive to discover. Every colour, every logo and every private-label derivative is a configuration question. If the change touches the enclosure, the seal or the interface, the marking may no longer apply, and the re-validation cost is per configuration, so it compounds with the range rather than with the order.
The negotiating room is therefore not in the unit price. It is in the number of configurations you commit to, the artwork round count, the per-market label scope, the re-validation cost per variant, and the market list itself. A channel served only from markets where the approvals already exist is worth a materially better price than one that requires new testing, and that decision belongs before the quotation rather than after it.

What the two digits of an IP code do and do not permit
The code is defined in IEC 60529 as degrees of protection provided by enclosures, and it has two independent parts. The first digit rates protection against solid foreign objects, on a scale from 0 to 6. The second rates protection against water, on a scale from 0 to 9. A letter in either position means that part was not evaluated at all, which is an absence rather than a poor score, and reading it as a low score misses the more useful fact: nobody has an opinion.
Three readings cause most of the trouble in the field.
The first is treating the digits as a linear scale. They are not. A 4 is protection against splashing water from any direction. A 5 is water under low pressure. A 6 is powerful water jets. A 7 is temporary immersion to a stated depth for a stated duration. A 8 is continuous immersion under agreed conditions. A 9 is high-pressure, high-temperature jets. A 6 and a 7 are far further apart in test severity than a 4 and a 5, so "one digit better" is not a proportional improvement, and a comparison written in those terms is arithmetically wrong even when the arithmetic is right.
The second is reading a 4 as waterproof. It is not immersion, not a shower, not a hose, and not sustained rain. A catalogue that says IP54 and a product page that says waterproof are making two different claims, and the second one is not supported by the first. This is the single most common defect in this category, and it is a marketing failure rather than a technical one, which means it is entirely within your own control.
The third is the letter trap. An IPX7 product carries no dust opinion at all. Reading it as "seven for everything" flatters the product and misleases the customer.
Underneath the code, four rows do the real work, and all four are absent from most supplier material.
The tested configuration — which ports, contacts and interfaces were fitted when the sample was tested. A rating attaches to a configuration, and a unit with a different port, a different contact arrangement or a different interface is a different configuration.
The model list on the document. A family-level report is not coverage for a branded unit, and a report on the factory's own product code is not a report on yours.
The condition of the received unit — the seal line, the interface, the button seals and the microphone ports, checked against the tested configuration. This is the check that catches a substitution, because a mismatch usually means a component changed after the test.
The seal's service life. Every seal ages, and the rating describes the product as it left the factory rather than the product in year three.
Set the thresholds before the first article, not after. A uniformity or configuration tolerance agreed afterwards is a tolerance that has already been missed, and the cost of tightening an enclosure once tooling exists is measured in tool changes and re-validation rather than in a note in a file. The same logic applies to the exclusions: a scope written after the artwork is approved is a scope that reaches the customer as a surprise.
Turning a catalogue marking into evidence a compliance team can file
Verification is the part of ingress protection that separates a supplier who has done the work from one who has described it. Every step below works with documents and with a sample, and every step assumes the one before it passed. A failure at any point tells you what the next point would have told you, which is why the order matters.
Step one: ask for the report number rather than the report. A number is the only part of a compliance document that a broker, a marketplace or your own compliance team can check later. Ask for the list of numbers, with the issuing body and the validity dates, in the body of the email, before the first sample ships. The cost of this step is one email and about four minutes.
Step two: resolve the number in the issuing body's own register. Check three things: the model designation on the document matches the model you are ordering, the document covers the radio band and the functions you are shipping, and the validity date has not passed. Compare the model designation character by character. Where a range holds several models with similar names, this is the step that catches a substitution, and a mismatch is a stop condition rather than a query.
Step three: establish the tested configuration. Ask which ports, contacts and interfaces were fitted on the tested sample, then compare that list against the unit in your hand, physically, before anything else is done with it. Where a charging contact or a port is exposed on the shipped unit and was capped on the tested sample, the marking does not cover the product in your packaging.
Step four: run your own test on a sample, on a fixed protocol, and record it as your measurement. The protocol is narrow, and it should be the failure mode your channel actually has: the sweat-and-dust case for a sport product, the saltwater-and-sand case for a beach product, the repeated-handling case for a product aimed at younger users. The duration, the environment and the pass condition are written down before the first reading. A generic spray test is none of these.
Step five: put the criteria into the purchase order. In a category with no universally quoted standard, the contract is the standard. A criterion that lives in an email is not binding. A criterion in the purchase order is an acceptance standard, and a lot that fails it is a lot you can refuse.
Run those checks before the order is placed rather than after the goods have shipped, and run them against the same documents you intend to sign. A quotation that answers all of the above is a complete quotation, and a quotation that answers two of the five is telling you something you need to know before the deposit.

Four ways an ingress programme loses its position after launch
The failures below are not exotic, and none of them is a reason to change supplier. They are reasons to put a line in the order. Each one is written as a symptom, a root cause and a control.
The claim says waterproof and the customer tests it in the rain. The symptom is a cluster of returns from one channel with a description that says the product is broken. The root cause is that the marketing instinct is stronger than the marking. The control is to write the marking in words — protected against splashing water from any direction, not for immersion — and to publish the exclusions next to it on the listing.
A certificate arrives naming a product the buyer is not shipping. The symptom you actually get is a warranty claim, a border query, or a marketplace rejection that stays unresolved. The root cause is that a family-level document was treated as coverage. The control is to make the exact model designation a condition of the purchase order and to check it against the units on receipt.
Water is found in the charging interface. The symptom is a unit returned with corrosion and a customer who has done nothing wrong. The root cause is that a designed opening is an ingress path and the test protocol ignored it. The control is to put the interface first in the protocol and to write an instruction about it into the quick start guide, the product page and the support script, in that order.
A variant ships outside the covered configurations. The symptom is a consistency problem that appears after launch, usually in the colour that sold best. The root cause is that no per-variant configuration check existed. The control is to put the seal, the port, the contact and the frame material on a change-control list with a notice obligation attached.
There is a fifth pattern worth naming because it is quieter than the others. The protection is fine in year one and the returns begin in year three. The symptom is a slow drift in the return rate with no obvious cause. The root cause is that the seal aged and nobody tracked the service life. The control is to set the warranty against a measured failure criterion rather than against a calendar assumption, and to re-test a retained unit periodically against a fresh one.

What can be negotiated on an ingress programme, and what cannot
The numbers that actually move. The setup cost is the factory's fixed cost rather than a market rate, and it is where a per-configuration minimum genuinely moves. The number of configurations you commit to, the per-colour minimum for each, the artwork round count and the per-market label scope are all negotiated numbers, and all of them are larger than the unit-price saving. The market list is a negotiation as much as a decision. The re-validation cost per variant, and the trigger that causes it, are terms worth settling before the first variant is ordered rather than after. The retention held against the documentation package protects you on the failure that costs most, which is a product that arrives with a marking nobody can evidence.
The numbers that do not move. Certification cost and certification time are a fixed cost per configuration plus a queue at the laboratory, and the elapsed time is set by the laboratory rather than by your order size. A one-off tooling charge is usually amortised across the first order, so the useful questions are over what volume it is amortised and what happens to the tooling, and to the sealing tooling in particular, if the programme is discontinued. The enclosure design itself is not a commercial variable: a supplier who will not change the seal material, the seal geometry or the port design is telling you the ingress performance is fixed, and the programme should be built around that fact rather than against it.
The documents to request before the deposit. The report number with the issuing body, the standard and its edition. The model list the report names. The configuration under test, with the port layout, the contact set and the interfaces described. The sample identity: the batch, the build and the number of units. The seal material, whether it is replaceable, and the expected service life. The certificate numbers for the remainder of the conformity file.
The clauses to write into the purchase order. The report number and the exact model designation attached to the order. A clause requiring notice before any change of seal, port, contact or interface, since each of those invalidates the configuration. A clause requiring per-variant confirmation that a changed variant remains within the covered configuration list. The acceptance criteria from the buyer-run protocol. A clause on who bears the cost when a lot fails the acceptance criteria.
The total cost of an ingress programme is the unit price plus the returns reserve plus the cost of the documentation route plus the re-validation cost of the variants you will actually sell. The trade-offs between those are settled in the quotation rather than after it, and which one to negotiate hardest depends on where your own programme is weakest.
Our published position on ingress, and what to send us
Here, the published material on ingress protection is the part of the specification we can stand behind, and the rest is a question for the supplier's own file. We publish what our documentation states, we mark the rows that are open, and we will not fill an open row with a typical figure from a supplier's general data. A buyer who builds a claim on an estimated number finds the error in the field rather than in the quotation, and the correction costs more than the question did.
The rows we do publish for ingress are short. In our catalogue the IP54 marking appears on the V06 and the S7, as an annotation. We publish no third-party test report number, no standard, no test condition, no sample size and no laboratory behind it, because the company has not confirmed them to us. No other model in the range carries a published ingress marking, and no charging case in the range carries one either. We publish a weight for exactly one model in the whole catalogue: 158 g for the MT6 glasses unit, excluding its foldable charging case.
A spec sheet leaves out the other side of a marking, and that side matters at least as much. A marking on a model is not a statement that the model cannot handle the environment; it is the absence of a claim. And a marking without a report number is a statement rather than a document, and the difference matters the first time somebody asks — a broker, a marketplace, a retailer's technical team or a customs inspection.
We will not describe a splash-protected product as waterproof, rain-capable or immersible, and we will not present a marking as a lifetime guarantee. Every seal ages, we publish no ageing data, and we will not estimate a service life for something that has not been tested.
If you are evaluating this category, send us the models, the quantities and the target market, and we will tell you which configurations exist, which of them are open on the published data, and what the qualification would involve for the ones that are not. Send us the exposure first and the market second, because the exposure decides whether you need the evidence at all. The range is at sport smart glasses and the technical background is under IP ratings and durability.
Related reading
- IP ratings for smart glasses
- How to measure an IP rating
- IP rating supplier verification
- Sport smart glasses range
Send the exposure, the configuration and the target market, and we will say which rows of the ingress evidence are settled and which are yours.



