What are the V06 AI camera glasses?
CYNRIN confirms the V06 as an 8MP sports AI camera glasses platform in the sport cluster. The published record lists an 8MP camera, a 260mAh frame battery, magnetic charging, a reference charging time of no more than two hours, a 5–8h music playback band, a removable inner frame and four colours — Orange, White-ice blue, Black and Black-ice blue. It ships as a configurable OEM platform for sports, cycling and running brands, with branding and packaging agreed per project.
What camera does the V06 use?
The published camera value is 8MP, placing the V06 one resolution tier below the S7's 13MP in the sport cluster; the YKC02, D17 and ZH12 audio columns publish no camera row at all. No sensor name, photo format, video resolution, frame rate or onboard storage is published for the V06, and CYNRIN does not transfer the V03-T5's Sony IMX219 or 1200p30 detail into this column. Marketing copy stays at the 8MP label until the configuration sheet confirms the exact firmware.
What do the four published V06 colours mean?
The Colours row is published as Orange / White-ice blue / Black / Black-ice blue, documenting four factory colourways for one V06 frame platform. The V06 is the only column in the sport cluster with a published colour range — the S7 and the three audio columns publish none. The record does not fix a colourway mix, finish type or allocation for any order, so the split between colours, packaging colour coding and lead-time impact are selected at the Configure gate and confirmed in writing.
How long does the V06 battery last?
The frame cell is published at 260mAh and the only runtime value is a music playback band of 5–8h under reference conditions, the same range as the S7. The audio columns publish fixed values of about eight hours for the YKC02 and ZH12 and about seven hours for the D17 on smaller cells without a camera load. The band is a measured range for activity planning, not an all-day guarantee, and no talk, standby or video-recording runtime is published, so those figures are confirmed per project.
How does the V06 charge and how long does it take?
The published charging method is magnetic charging, shared with the S7 and YKC02, and the reference charging time is ≤2h under defined conditions, matching the S7 and YKC02 against the ~1h Type-C charge of the D17 and ZH12. The record does not publish dock content, pin layout or adapter wattage, and it does not state whether the ceiling covers any case accessory, so those details are confirmed on the configuration sheet before retail packaging lists them.
What is the removable inner frame for?
The frame design is published as a removable inner frame, a structure shared with the S7 and aimed at active retention plus optical flexibility. The inner carrier can be used for prescription or optical insert programmes so corrective-lens wearers buy one certified outer sport frame. Frame material, weight, lens geometry and confirmed insert compatibility are not published — they are confirmed on the configuration sheet per project, and structural insert changes are typically scoped as ODM at 3,000–5,000 units.
What is the difference between the V06 and the S7?
Both sport-camera columns share the 260mAh cell, magnetic charging, ≤2h reference charge, 5–8h playback band and removable inner frame. The S7 publishes a 13MP camera while the V06 publishes 8MP, and the V06 alone publishes four colours — Orange, White-ice blue, Black and Black-ice blue — while the S7 publishes no colour row. Choose the S7 for the higher resolution tier and the V06 when a ranged colourway line at the 8MP tier is the channel priority.
Is the V06 a camera product or an audio product like the ZH12?
The V06 is a camera product: its record opens with an 8MP camera row, whereas the YKC02, D17 and ZH12 are sports audio glasses that publish Bluetooth 5.4 and a Features row of surround sound, with the D17 and ZH12 adding remote-shutter control of a paired phone rather than a glasses-mounted camera. Buyers should not present the V06 as a Bluetooth audio platform because it publishes no connectivity row, nor present the audio columns as camera wearables; the two categories serve different shelf adjacencies.
Is the V06 waterproof, and does it support Wi-Fi or an app?
Neither an ingress-protection rating nor a connectivity or companion-app row is published for the V06. Although the frame is positioned for running and cycling, CYNRIN does not apply an IP54-style claim or state Wi-Fi, Bluetooth version or app support without a confirmed configuration; the Bluetooth 5.4 values on the audio columns belong to those records. Both requirements can be raised at the Define gate, and until tested or confirmed the safe position is not published — confirmed on the configuration sheet per project.
What is the MOQ for a V06 OEM order?
CYNRIN confirms three entry points. Catalogue OEM configuration starts at 500 units, branded OEM with the buyer's logo and retail packaging starts at 1,000 units, and ODM engineering changes such as custom structure or optical inserts typically run at 3,000–5,000 units per project. Because the V06 offers four published colourways, the colourway mix, dock accessory content and packaging structure influence which tier applies, and sales maps quantity and market to the correct entry point before a deposit is requested.
Can the V06 be customised for our sports brand?
Customisation covers logo placement, the mix across the four published colourways, magnetic dock bundling, inner-frame insert programmes, packaging and documentation scoping, subject to order quantity. The 8MP camera, 260mAh cell and magnetic charging remain the shared platform; requests for an unpublished ingress rating, added connectivity, a custom colour outside the published four or structural frame changes are treated as ODM and typically require 3,000–5,000 units, with every change confirmed in writing rather than inferred from a sibling.
Which certifications apply to the V06?
CE, FCC and RoHS are published as certification capabilities of the manufacturer, not as claims that the V06 is certified in a specific configuration. For a sport-marketed model the applicable radio, safety and battery-transport reports are reviewed against the destination market, and any ingress-protection statement requires its own test report for the exact colourway-independent hardware. CYNRIN provides the certification report index at RFQ stage and confirms the applicable report scope in writing before mass production.
How do we start a V06 project?
Send your target quantity, destination market, activity focus, preferred colourway mix from the four published finishes, magnetic dock and accessory requirements and any optical-insert scope. CYNRIN replies with the V06 configuration sheet, sample timing, the applicable MOQ — 500 for catalogue OEM, 1,000 for branded and typically 3,000–5,000 for ODM changes — and the certification report scope for your market. The programme then moves through Define, Configure, Validate and Produce, with mass production typically scheduled 15–40 days after deposit.