Smart eyewear OEM/ODM manufacturer · Shenzhen, China +86 19835872450 sales@cynrin.com
Sport Smart Glasses

ZH12 Sports Audio Glasses

The ZH12 is CYNRIN's sports audio glasses platform, pairing Bluetooth 5.4, a 100mAh frame cell, Type-C charging with a reference time of about one hour and a ~8h music playback span with surround sound and a remote shutter that triggers the paired phone camera for active, open-ear listening programmes.

  • Bluetooth 5.4 connectivity for the paired phone and app
  • 100mAh frame cell with a reference music playback span of ~8h
  • Type-C charging with a reference charging time of ~1h
  • Surround sound open-ear audio plus remote-shutter phone capture
  • Configurable OEM programme for sports and active-lifestyle brands
Order a sample
Connectivity
Bluetooth 5.4
Battery capacity
100mAh
Charging method
Type-C
Charging time
~1h
Music playback time
~8h
Features
Surround sound; Remote shutter

Charging and playback figures are reference values measured under defined conditions; the ZH12 publishes no camera, colour, frame, lens or ingress-rating row, and the remote shutter controls the paired phone rather than a glasses-mounted camera.

Platform capabilities

A Bluetooth 5.4 audio frame with remote capture

The ZH12 publishes six specification rows, and each capability below is copied from that record; it is an audio platform in the sport cluster, not a camera-glasses column, and its shutter triggers the paired phone.

Bluetooth 5.4 pairing

Bluetooth 5.4 is the published connectivity, shared across the three sport audio columns; the record names the radio version but no companion app or codec list, so app and protocol claims are confirmed on the configuration sheet.

Surround sound open-ear

The Features row publishes surround sound as the audio signature for open-ear listening during activity; the record does not name speaker drivers, microphone count or a bone-conduction path, so acoustics detail stays at the published label.

Remote shutter capture

Remote shutter is the second published feature: the glasses trigger the paired phone's camera, letting a wearer capture action shots without reaching for the handset; the ZH12 itself publishes no onboard camera, video or storage row.

100mAh cell, ~8h playback

The 100mAh frame cell supports a published ~8h music playback span under reference conditions, the longest point-value runtime in the sport cluster; the about hedge should be retained because volume and temperature shift the load.

Tuned for active use

As Sports Audio Glasses the ZH12 is positioned for running, cycling and outdoor listening with a Type-C interface and a ~1h reference charge; no ingress rating is published, so sweat and weather claims wait for a tested value.

Cyclist wearing ZH12 sports audio glasses in a peloton
Designed around real use

Open-ear sport audio that borrows the phone's camera.

The ZH12 is built for athletes who want awareness and audio together. Bluetooth 5.4 pairs the frame to the phone, surround sound carries music and calls in an open-ear design, and the remote shutter fires the paired phone camera so the wearer stays in frame handling the glasses rather than the handset.

Power is documented as a 100mAh cell with Type-C charging, a ~1h reference charge and a ~8h playback span for long sessions, and the record publishes no glasses-mounted camera, lens, colour or ingress-rating row; those items are confirmed on the configuration sheet rather than taken from the S7 or V06 camera columns.

  • 01 Bluetooth 5.4 open-ear listening for running and cycling
  • 02 Remote shutter triggers the paired phone camera
  • 03 Type-C about-one-hour charge and about-eight-hour playback
ZH12 on the CYNRIN line

The ZH12 runs on the sport-audio line with sealed speaker-arm assembly, Bluetooth 5.4 pairing checks and Type-C port inspection, plus remote-shutter function tests against reference handsets on the CYNRIN campus. Catalogue OEM starts at 500 units.

See the manufacturing record
Engineering record

ZH12 Sports Audio Glasses specifications

The published platform specification, grouped by engineering domain and maintained as system data. Values are confirmed in writing per project before tooling or mass production.

01

Audio & Connectivity

Connectivity
Bluetooth 5.4
02

Power & Charging

Battery capacity
100mAh
Charging method
Type-C
Charging time
~1h
Music playback time
~8h
03

Physical & Optics

Features
Surround sound; Remote shutter

Values are shown from the published CMS product record. Specification changes driven by component or firmware revisions are confirmed in writing on the proforma invoice before tooling or mass production; runtime and charging are reference figures.

Reading the numbers

What the ZH12 specifications mean in use

Each card pairs a value copied character for character from the ZH12 published record with its procurement meaning. Charging and playback are reference figures, and camera, colour, lens and ingress gaps are confirmed on the configuration sheet per project.

Connectivity Bluetooth 5.4

Bluetooth 5.4 is the published connectivity, identical to the D17 and YKC02 audio columns in the sport cluster, while the S7 and V06 camera columns publish no connectivity row at all. The radio version tells buyers the frame is a current-generation audio peripheral, but the record names no codec, companion app, multipoint behaviour or Wi-Fi, so those claims are configuration items rather than published facts.

Codec, app, multipoint and supported-phone scope are not published; pairing detail is confirmed on the configuration sheet.

Battery capacity 100mAh

The 100mAh frame cell sits between the audio cluster's 115mAh D17 and the YKC02's 70mAh × 2 dual-cell arrangement, and far below the 260mAh camera columns that must also power an imager. Despite the smaller cell the ZH12 publishes the longer ~8h playback, which reflects an audio-only load profile; capacity should not be compared across camera and audio categories without that context.

100mAh is a nominal rating with no published voltage; endurance under radio and audio load is confirmed per project.

Charging method Type-C

Type-C is the published charging method, shared with the D17 but not the YKC02, S7 or V06, which publish magnetic charging. A standard Type-C interface lets sports buyers bundle common cables and chargers rather than a proprietary dock, and it removes a connector decision at retail; adapter wattage, cable specification and any dock accessory are not named in the record.

The record names Type-C only; supported adapter wattage and cable specification are not published and are confirmed per project.

Charging time ~1h

The published charging time is about one hour over Type-C, matching the D17 and roughly half the ≤2h ceiling carried by the magnetically charged YKC02, S7 and V06. The about hedge belongs in every retail mention because the figure is measured under defined conditions with reference adapters, and the record does not state a charge percentage target or account for use while charging.

~1h is a reference figure under defined conditions; adapter scope and charge target are confirmed on the configuration sheet.

Music playback time ~8h

The ~8h music playback span matches the YKC02 as the longest published point value in the sport cluster, ahead of the D17's ~7h and the camera columns' 5–8h bands. It is the only runtime value published for the ZH12, so it should not be extended into talk time, standby or any recording duration — the frame has no camera — and the about hedge must be kept on packaging.

~8h is measured under defined playback conditions; talk and standby runtimes are not published and are confirmed per project.

Features Surround sound; Remote shutter

The Features row combines surround sound and remote shutter, exactly matching the D17's published feature set, while the YKC02 lists surround sound alone. The remote shutter is a Bluetooth control of the paired phone camera — it does not give the glasses an onboard imager — so retail copy must distinguish ZH12 capture-by-phone from the S7 and V06, which carry genuine 13MP and 8MP glasses cameras.

Speaker and microphone hardware, shutter app scope and supported camera functions are not published and are confirmed per project.

Choose within the family

ZH12 vs the CYNRIN sports glasses platforms

Every cell comes from the published specification record of the model shown — no estimated or borrowed numbers. Gaps stay as Not published rather than being filled from a sibling model.

Published specification record per model across the sports family. Linked names open that product page.
Specification V06 S7 YKC02 D17 ZH12
Position 8 MP sports camera 13 MP sports camera Surround audio, magnetic Fast-charge shutter audio Sports audio remote shutter
Camera 8MP 13MP Not published Not published Not published
Connectivity Not published Not published BT 5.4 BT 5.4 BT 5.4
Battery capacity 260mAh 260mAh 70mAh × 2 115mAh 100mAh
Charging interface Magnetic charging Magnetic charging Magnetic charging Type-C Type-C
Reference charging time ≤ 2h ≤ 2h ≤ 2h ~1h ~1h
Reference playback time 5–8h music 5–8h music ~8h music ~7h music ~8h music
Frame design Removable inner frame Removable inner frame Not published Not published Not published
Audio / control feature Not published Not published Not published Not published Not published
Colours Orange / White-ice blue / Black / Black-ice blue Not published Not published Not published Not published

In the sport cluster the ZH12 is the Bluetooth 5.4 audio column with the longest published playback point value: a 100mAh cell, Type-C ~1h charge and ~8h playback with the same Surround sound; Remote shutter feature row as the D17, which instead uses an 115mAh cell at ~7h. Against the S7 and V06 it has no glasses-mounted camera — its shutter triggers the paired phone — and it carries no published colour, frame-design or ingress row, so those items are confirmed on the configuration sheet per project and never copied from the camera columns.

Applications

Where ZH12 fits

The open-ear audio and phone-camera remote shutter suit sports brands and distributors building active-lifestyle audio ranges around a configurable Bluetooth frame.

Trail runner wearing ZH12 sports audio glasses for open-ear music

Running and trail audio

Running brands position the ZH12 for open-ear awareness with ~8h reference playback spanning long sessions, using the one-hour Type-C charge to frame event-day top-ups and keeping any sweat-resistance claim to a tested value.

Running application scene for ZH12 Bluetooth audio glasses

Group ride and run capture

Cycling and run clubs use the remote shutter to trigger paired-phone shots mid-activity, marketing the frame as an audio wearable that controls capture rather than carrying a camera, which keeps the category story honest at retail.

Outdoor cyclist wearing ZH12 sports audio glasses

Active-lifestyle bundles

Distributors bundle the ZH12 with standard Type-C cables and sport accessory packs, confirming branding, packaging and any colour or ingress requirement on the configuration sheet before the catalogue OEM MOQ of 500 units is released.

From brief to shipment

ZH12 programmes move through four gates — Define, Configure, Validate and Produce — and the full process, timelines and deliverables are documented on the OEM/ODM process page.

  1. Define
  2. Configure
  3. Validate
  4. Produce
See the full OEM/ODM process
2018CYNRIN established in Shenzhen
20,000+ m²Self-owned production campus
500 pcsCatalogue OEM entry MOQ
15–40 daysTypical mass-production window
Project documents

Available on request

Buyer questions

ZH12 Sports Audio Glasses FAQ

What are the ZH12 sports audio glasses?
CYNRIN confirms the ZH12 as a sports audio glasses platform in the sport cluster. The published record lists Bluetooth 5.4 connectivity, a 100mAh frame battery, a Type-C charging interface, a reference charging time of about one hour, a reference music playback time of about eight hours and a feature set of surround sound plus remote shutter. It ships as a configurable OEM platform for sports and active-lifestyle brands, with branding and packaging agreed per project on the configuration sheet.
What does Bluetooth 5.4 mean for the ZH12?
Bluetooth 5.4 is the published connectivity value, shared with the D17 and YKC02 audio columns, while the S7 and V06 camera columns publish no connectivity row. The version indicates a current-generation radio for pairing with the phone, but the record names no supported codecs, companion app, multipoint or LE Audio behaviour. Buyers needing those details for packaging or app-store claims should treat them as configuration items, not published — confirmed on the configuration sheet per project.
How long does the ZH12 battery last?
The frame cell is published at 100mAh and the only runtime value is a music playback time of ~8h under reference conditions, equal to the YKC02 and about an hour longer than the D17's ~7h. The camera columns publish a 5–8h band on much larger cells because they also power an imager. The about-eight-hours figure is a measured playback reference, not an all-day guarantee, and no talk time or standby time is published, so those values are confirmed per project rather than estimated from capacity.
How does the ZH12 charge and how long does it take?
The published charging method is Type-C, shared with the D17 but different from the magnetic charging on the YKC02, S7 and V06. The reference charging time is ~1h under defined conditions with reference adapters, matching the D17 and roughly half the ≤2h ceiling of the magnetically charged columns. The record does not name adapter wattage, cable specification or a charge-percentage target, so those details are confirmed on the configuration sheet before packaging copy is finalised.
What is the surround sound feature?
The Features row publishes surround sound as the ZH12 audio signature for open-ear listening during activity, the same wording used on the D17. The record does not name speaker driver size, microphone count, audio codec or a bone-conduction acoustic path, so CYNRIN does not claim conduction architecture or driver specifications that are absent from the published row. Detailed acoustics for the exact firmware configuration are confirmed on the configuration sheet per project.
What does the remote shutter do?
The remote shutter is a Bluetooth control that fires the camera of the phone paired to the ZH12, letting a runner or rider trigger a photo without handling the handset. It is published as part of the same Surround sound; Remote shutter feature row carried by the D17. The function depends on the paired phone and its camera application; the record does not publish supported apps, shutter range or video-trigger behaviour, and crucially it does not add a camera to the glasses themselves.
Does the ZH12 have a built-in camera?
No camera, video or storage row is published for the ZH12; it is a sports audio glasses platform. The remote-shutter feature controls the paired phone camera, so any photo or video is captured by the phone, not by a sensor in the frame. Buyers should not present the ZH12 as AI camera glasses: the S7 publishes a 13MP camera and the V06 an 8MP camera, and those imaging values do not transfer to this audio column.
What is the difference between the ZH12 and the D17?
The two audio columns share Bluetooth 5.4, Type-C charging, a ~1h reference charge and the identical Surround sound; Remote shutter feature row. The D17 publishes a larger 115mAh cell but a shorter ~7h playback span, while the ZH12 publishes a 100mAh cell with ~8h playback. Because the records publish no firmware or driver detail, the runtime difference should be quoted as published rather than explained with an unproven claim; choose between them on the published power and positioning values.
What is the difference between the ZH12 and the YKC02?
Both publish Bluetooth 5.4 and a ~8h music playback span, but the YKC02 uses a 70mAh × 2 dual-cell arrangement with magnetic charging and a ≤2h reference charge and lists surround sound without a remote shutter. The ZH12 uses a single 100mAh cell, charges over Type-C in about one hour and adds the remote-shutter phone-camera control. Buyers choose the YKC02 for dual-cell magnetic charging and the ZH12 for standard Type-C, faster reference charging and capture control.
What colours, frame options and ingress rating does the ZH12 offer?
No colours, frame design, lens, weight or ingress-protection rows are published for the ZH12, and the V06's four colourways and the camera columns' removable inner frame are not carried into this audio column. Although the frame is positioned for running and cycling, no sweat or water rating is claimed without a test report. Colour, frame finish and sealing requirements are treated as configuration items — structural changes typically fall under ODM at 3,000–5,000 units — and are confirmed in writing.
What is the MOQ for a ZH12 OEM order?
CYNRIN confirms three entry points. Catalogue OEM configuration starts at 500 units, branded OEM with the buyer's logo and retail packaging starts at 1,000 units, and ODM engineering changes such as custom acoustics, sealing or frame structure typically run at 3,000–5,000 units per project. Cable and accessory bundling, packaging and certification scope influence which tier applies, and the sales team maps target quantity and destination market to the correct entry point before a deposit is requested.
Can the ZH12 be customised for our sports brand?
Customisation covers logo placement, frame and packaging colourway, Type-C cable and accessory bundling, documentation scoping and retail pairing instructions, subject to order quantity. Bluetooth 5.4, the 100mAh cell, Type-C charging and the surround sound plus remote shutter features remain the shared platform; requests for an added glasses camera, an ingress rating, an unpublished colour or structural acoustic changes are treated as ODM and typically require 3,000–5,000 units, confirmed in writing rather than inferred from a sibling.
Which certifications apply to the ZH12?
CE, FCC and RoHS are published as certification capabilities of the manufacturer, not as claims that the ZH12 is certified in a specific configuration. Because the product carries a Bluetooth radio and a 100mAh cell, radio, safety and battery-transport reports are reviewed against the destination market, and any water or sweat statement requires its own ingress test for the exact build. CYNRIN provides the certification report index at RFQ stage and confirms the applicable report scope in writing before mass production.
Project desk

Configure the ZH12 for your market

Send your target quantity, destination market, audio and remote-shutter requirements, Type-C accessory scope and packaging needs. CYNRIN replies with the ZH12 configuration sheet, sample timing, the applicable MOQ and the certification report scope for your market.

Sample
Chat on WhatsApp