What category of product is the D17?
D17 is a sports smart glasses audio platform, also described as Bluetooth audio glasses, rather than an on-board camera product. The published record lists six rows: Bluetooth 5.4 connectivity, a 115mAh battery, Type-C charging, a reference charge time of about 1h, about 7h of reference music playback and a feature line reading Surround sound; Remote shutter. The shutter is a Bluetooth control for the paired phone camera, so the frame sits in the audio-first sports family alongside YKC02 and ZH12 rather than the 8MP and 13MP camera columns.
What does Bluetooth 5.4 mean for D17 users?
Bluetooth 5.4 is the connectivity version published for D17, matching the YKC02 and ZH12 sports audio columns, while V06 and S7 publish no connectivity row. On D17 the link carries music, call audio and the remote-shutter command that triggers capture on the paired phone. CYNRIN does not quote range, latency or pairing-speed figures because phone hardware, firmware and environment determine all three, and no companion application is published; any app-based setup the shutter requires is confirmed in writing on the configuration sheet per project.
What is the D17 battery capacity and how does it compare?
The published battery capacity is 115mAh in a single cell, which is larger than the 100mAh cell published for ZH12 and uses a different layout from YKC02's 70mAh × 2 dual-cell record, while the V06 and S7 camera columns publish 260mAh cells for imaging loads. Cell size alone is not a runtime promise: CYNRIN quotes 115mAh verbatim and directs buyers to the about-7h reference playback row for endurance planning, since volume, temperature, calls and shutter use change the drain.
How does the D17 charge and how long does it take?
D17 charges through a published Type-C interface with a reference charging time of about 1h, matching ZH12 for the fastest turnaround in the sports table and roughly halving the up-to-2-hour reference figures for YKC02, V06 and S7. No charging case is published for D17. Cable rating, adapter wattage and temperature change the actual result, so the about-1h figure is treated as a reference under defined conditions; included cable and retail charger scope are confirmed on the configuration sheet per project.
What does the D17 remote shutter actually control?
The remote shutter is a Bluetooth control that triggers the camera shutter on the phone paired with D17; it does not mean the glasses contain a camera. D17's published record has no camera row, and the sports comparison lists its camera cell as Not published, unlike the 8MP V06 and 13MP S7 columns. Capture lands in the paired phone's own camera application, which keeps the frame light and audio-first; phone compatibility, trigger protocol and any companion application the function depends on are not published and are confirmed on the configuration sheet per project.
What lens, frame, weight and water-resistance options are published?
None of those parameters are published for D17: its record contains no frame design, weight, lens option, colour or IP rating row despite the sports positioning, and the comparison table prints Not published rather than borrowed values. CYNRIN does not carry over the removable inner frame or colourways published for V06, and never prints an untested water-resistance rating for a headset that sweats through training. Tints, frame finishes, fit dimensions and test-report scope are documented on the configuration sheet and verified on pre-production samples per destination market.
How is the D17 different from the YKC02 and ZH12 sports models?
Versus YKC02, D17 swaps magnetic charging and a 70mAh × 2 dual-cell layout for Type-C and a single 115mAh cell, cuts reference charging from up to 2h to about 1h, lists about 7h playback against about 8h and adds Remote shutter to the shared Surround sound feature. Versus ZH12, both publish Bluetooth 5.4, Type-C, about 1h charging and Surround sound; Remote shutter, while the cells and runtimes differ at 115mAh with about 7h against 100mAh with about 8h. None of the three audio columns publishes an on-board camera.
What is the minimum order quantity for the D17?
500 units is the catalogue OEM entry point for D17, where the published Bluetooth 5.4 sports audio platform is configured with available options and your logo treatment. Branded OEM with broader logo, packaging and multilingual documentation scope typically begins at 1,000 units. ODM programmes involving structural or engineering work, such as speaker-arm redesign or shutter-key remodelling, are evaluated separately and typically land in the 3,000-5,000 unit range, with the exact threshold confirmed after engineering reviews the brief.
Can CYNRIN customize the D17 for our sports brand?
Yes. D17 is offered as an OEM/ODM configurable platform covering logo placement, available colourway and lens selection, packaging structures, documentation languages and charger-accessory scope for the Type-C interface. Because frame design, colours and lens options are not pre-published, the available trim matrix is confirmed against your target quantity, channel and destination market. Acoustic tuning, shutter-key placement or structural changes beyond catalogue configuration are scoped as ODM with separate tooling and NRE review rather than treated as standard OEM.
Which certifications apply to the D17?
CE, FCC and RoHS are listed among CYNRIN's certification capabilities rather than printed as certificates that D17 carries out of the box. Because D17 is a wireless Bluetooth audio device, the applicable reports, standards and configuration scope are verified against each destination market — the EU, US and other regions apply different requirements — and supplied on request. Certification follows the product as configured, including the chosen Type-C cable, adapter and documentation package, so report scope is settled during the Validate gate.
Can the D17 be used for running and cycling without a published IP rating?
D17 is positioned for running and riding audio thanks to its published Surround sound, but its record publishes no IP rating, so CYNRIN does not describe it as waterproof or sweatproof on the page. Buyers selling into rainy or high-sweat channels should request sealing details and an applicable test report on the configuration sheet and verify performance on pre-production samples rather than assume the rating of another sports column. About 7h reference playback and about-1h Type-C charging still suit scheduled training sessions and event demos where the frame dries between uses.
Can we order samples and how long does D17 production take?
Samples are scheduled after the product brief is reviewed, with timing confirmed in writing rather than promised on the page. Once a deposit is in place, mass production for catalogue and branded D17 orders typically runs 15-40 days depending on configuration, packaging scope and order quantity. The exact schedule, covering sample shipment, acoustic and RF verification, remote-shutter pairing checks and certification timing for your destination market, is agreed up front for each programme so the 500-unit entry point has a clear delivery plan.
How do we start an RFQ or D17 project with CYNRIN?
Send your target quantity, intended sports market, preferred colourway or lens configuration, sales channel and certification expectations, plus any Type-C cable or accessory requirements. Engineering maps the D17 catalogue platform to the brief and replies with the configuration sheet, sample timing, the applicable MOQ tier, shutter phone-compatibility notes and the certification scope for your destination market, so the 500-unit entry and any branded OEM or ODM work are clear before deposit.