Smart eyewear OEM/ODM manufacturer · Shenzhen, China +86 19835872450 sales@cynrin.com
Sport Smart Glasses

S7 Sports AI Camera Glasses

The S7 is CYNRIN's sports-positioned 13MP AI camera glasses platform in cam_tier1, pairing a 260mAh frame cell, magnetic charging with a reference time of no more than two hours and a 5–8h playback band with a removable inner frame built for active first-person capture programmes.

  • 13MP camera in the high-resolution tier of the camera family
  • 260mAh frame cell with a 5–8h reference music playback band
  • Magnetic charging with a reference charging time of ≤2h
  • Removable inner frame for active fit and optical insert options
  • Configurable OEM programme for sports, cycling and outdoor brands
Order a sample
Camera
13MP
Battery capacity
260mAh
Charging method
Magnetic charging
Charging time
≤2h
Music playback time
5–8h
Frame design
Removable inner frame

Charging and playback figures are reference values measured under defined conditions; no connectivity, lens, colour or ingress-rating row is published for the S7, and those items are confirmed in writing per project.

Platform capabilities

A 13MP camera column tuned for active capture

The S7 publishes six specification rows, and each capability below is copied from that record; the removable inner frame is the physical feature that separates it from the other cam_tier1 columns.

13MP first-person camera

The published camera is a 13MP module, placing the S7 with the L1-PRO and L2-ULTRA above the two 8MP columns; no sensor name, video pipeline or storage is published, so imaging claims stay at the 13MP label until configuration.

Positioned for active sport

As the Sports AI Camera Glasses in the family, the S7 is positioned for cycling, running and outdoor first-person footage; the record describes the use case rather than an ingress rating, so waterproof claims are not made without a tested value.

Removable inner frame

The frame design is published as a removable inner frame, the only physical-design row in the S7 record and a fitting structure that lets buyers plan prescription or optical insert programmes around the outer sport frame.

260mAh cell, magnetic ≤2h charge

The 260mAh frame cell charges by magnetic charging with a published reference charging time of ≤2h under defined conditions; the snap dock suits gloved, active use and keeps the charging contact free of an exposed port.

5–8h reference playback band

Music playback is published as a 5–8h band under reference conditions, matching the V06 and the V03-PRO rather than the fixed about-seven-hours value of the L1 columns; the band should be quoted as a range, not a daily guarantee.

S7 sports AI camera glasses worn by a road cyclist in a peloton
Designed around real use

A camera frame built to move with the wearer.

The S7 takes the 13MP imaging tier and frames it for motion. The published record pairs the camera with a removable inner frame, a structure that keeps the outer sport frame stable while allowing optical inserts to be configured per market.

Power is documented as a 260mAh cell with magnetic charging and a ≤2h reference charge, plus a 5–8h playback band for planning a day of active use. No connectivity, lens, colour or ingress-rating value is published for the S7, so those items are confirmed on the configuration sheet rather than borrowed from the flagship column.

  • 01 First-person 13MP capture aimed at cycling and outdoor channels
  • 02 Removable inner frame for insert and fit programmes
  • 03 Magnetic dock charging with a two-hour reference ceiling
S7 on the CYNRIN line

The S7 runs on the shared 13MP camera SMT and magnetic-contact alignment lines, with removable-inner-frame assembly and hinge checks handled as a sport-frame cell on the CYNRIN campus. Catalogue OEM starts at 500 units.

See the manufacturing record
Engineering record

S7 Sports AI Camera Glasses specifications

The published platform specification, grouped by engineering domain and maintained as system data. Values are confirmed in writing per project before tooling or mass production.

01

Imaging & Storage

Camera
13MP
02

Power & Charging

Battery capacity
260mAh
Charging method
Magnetic charging
Charging time
≤2h
Music playback time
5–8h
03

Physical & Optics

Frame design
Removable inner frame

Values are shown from the published CMS product record. Specification changes driven by component or firmware revisions are confirmed in writing on the proforma invoice before tooling or mass production; runtime and charging are reference figures.

Reading the numbers

What the S7 specifications mean in use

Each card pairs a value copied character for character from the S7 published record with its procurement meaning. Charging and playback are reference figures, and connectivity, lens, colour and ingress gaps are confirmed on the configuration sheet per project.

Camera 13MP

The 13MP camera places the S7 in the high-resolution tier of cam_tier1 alongside the L1-PRO and L2-ULTRA, above the 8MP V03-T5 and V03-PRO. As with the L columns, the megapixel label is the complete imaging record — no sensor identity, photo format, video resolution, frame rate or onboard storage is published — so sport-marketing claims stay at 13MP until the configuration sheet confirms the firmware detail.

Sensor, photo and video pipeline and storage are not published; imaging claims beyond the 13MP label are confirmed per project.

Battery capacity 260mAh

The 260mAh frame cell is 30 mAh below the 290mAh cells in the L1-PRO and L2-ULTRA and 40 mAh above the 220mAh cells of the two V03 columns, making it the middle power tier of cam_tier1. Capacity alone does not set endurance, because the 13MP camera and radio load differ by build, and buyers should plan from the published 5–8h playback band rather than from the cell number in isolation.

260mAh is a nominal rating with no published voltage; endurance under camera and radio load is confirmed per project.

Charging method Magnetic charging

Magnetic charging is the published charging method, shared with the V03-T5 inside cam_tier1, while the V03-PRO and L2-ULTRA publish Type-C and the L1-PRO publishes no connector at all. A magnetic dock suits active use because the contact snaps on without precise port alignment and can be handled with gloves; the record does not name pin layout, adapter wattage or dock accessory content.

The record names magnetic charging only; dock content, cable and adapter specification are not published and are confirmed per project.

Charging time ≤2h

The published reference charging time is no more than two hours with the magnetic dock, the same two-hour ceiling the V03-PRO, L1-PRO and L2-ULTRA carry; the V03-T5 publishes an approximate 60-minute magnetic charge. Because no Type-C suffix is attached to the S7 value, the ceiling is quoted against the magnetic interface, and the frame-only versus docked charging path is a configuration item.

≤2h is a reference ceiling under defined conditions; the measured charge path and adapter scope are confirmed on the configuration sheet.

Music playback time 5–8h

The 5–8h playback band matches the V03-PRO and the sport-cluster V06 and is published as a range rather than a fixed point, unlike the ~7h of the L1-PRO and L2-ULTRA or the V03-T5's up-to-five-hours value. A band is appropriate for a sport build because volume level, temperature and camera use shift the load; retail copy must retain the range and the reference framing.

5–8h is measured under defined playback conditions; talk, standby and video-recording runtimes are not published and are confirmed per project.

Frame design Removable inner frame

The removable inner frame is the only physical-design row published for the S7 and the only frame-structure value in cam_tier1 — the V03-PRO publishes flexible temples, while the other columns publish no equivalent row. An inner-frame structure supports active retention and an optical or prescription insert programme, which matters for sports brands selling to riders who need corrective lenses inside a certified outer frame.

Frame material, weight, lens geometry and insert compatibility are not published; the insert scope is confirmed per project.

Choose within the family

S7 vs the high-resolution CYNRIN camera-glasses platforms

Every cell comes from the published specification record of the model shown — no estimated or borrowed numbers. Gaps stay as Not published rather than being filled from a sibling model.

Published specification record per model, flagship and 13 MP platforms. Linked names open that product page.
Specification V03-T5 V03-PRO L1-PRO L2-ULTRA S7
Position Flagship 8 MP AI camera 8 MP photochromic Type-C 13 MP with charging case 13 MP Type-C dual case 13 MP sports camera
Camera 8MP, Sony IMX219 4P 8MP 13MP 13MP 13MP
Battery capacity 220 mAh / 3.85 V 220mAh 290mAh 290mAh 260mAh
Charging case Not published Not published 1400mAh 900 / 1400mAh Not published
Charging interface 2-pin magnetic USB, approx. 60 minutes Type-C Not published Type-C Magnetic charging
Reference charging time Not published ≤ 2h ≤ 2h ≤ 2h ≤ 2h
Reference playback time up to 5 hours at maximum volume under reference test conditions music 5–8h music ~7h music ~7h music 5–8h music
Lens options Blue-light filtering, sunglasses or photochromic Photochromic Not published Not published Not published
Frame / weight TR frame, PC temples and lenses, stainless-steel hinge Flexible Not published Not published Removable inner frame
Colours Not published Orange / Off-white / Black Not published Not published Not published

In cam_tier1 the S7 is the sport-positioned 13MP column: it shares the high-resolution camera with the L1-PRO and L2-ULTRA but pairs a smaller 260mAh cell with magnetic charging and the family's only published removable inner frame, against the L columns' 290mAh cells and charging cases. The V03-T5 remains the 8MP flagship with published Wi-Fi and app detail the S7 does not carry; connectivity, lens and colour rows are not published in this model's own record and are confirmed on the configuration sheet per project, never copied from a sibling.

Applications

Where S7 fits

The 13MP camera and removable inner frame suit sports brands and distributors building active-capture ranges around a configurable OEM frame.

Outdoor sports use case for S7 AI camera glasses

Cycling and outdoor retail

Sports brands range the S7 for cycling and running channels, using the 13MP first-person camera and magnetic dock as the shelf story while confirming colour and ingress requirements on the configuration sheet before tooling.

Creator using S7 camera glasses for first-person action photography

Action creator programmes

Distributors supplying action-creator and amateur-athlete segments position the 13MP capture and 5–8h playback band together, keeping video-resolution and continuous-record claims unsaid until the firmware scope is confirmed in writing.

First-person point of view captured while wearing S7 sports camera glasses

Optical insert bundles

The removable inner frame lets buyers plan prescription or optical-insert bundles for corrective-lens wearers, with insert compatibility and frame finish treated as configuration items ahead of the catalogue OEM MOQ of 500 units.

From brief to shipment

S7 programmes move through four gates — Define, Configure, Validate and Produce — and the full process, timelines and deliverables are documented on the OEM/ODM process page.

  1. Define
  2. Configure
  3. Validate
  4. Produce
See the full OEM/ODM process
2018CYNRIN established in Shenzhen
20,000+ m²Self-owned production campus
500 pcsCatalogue OEM entry MOQ
15–40 daysTypical mass-production window
Project documents

Available on request

Buyer questions

S7 Sports AI Camera Glasses FAQ

What are the S7 AI camera glasses?
CYNRIN confirms the S7 as the sports-positioned 13MP AI camera glasses platform in cam_tier1. The published record lists a 13MP camera, a 260mAh frame battery, magnetic charging, a reference charging time of no more than two hours, a 5–8h music playback band and a removable inner frame design. It ships as a configurable OEM platform for sports, cycling and outdoor brands, with branding, packaging and unpublished options agreed per project on the configuration sheet.
What camera does the S7 use?
The published camera value is 13MP, placing the S7 with the L1-PRO and L2-ULTRA above the 8MP V03-T5 and V03-PRO. No sensor name, photo resolution or format, video resolution, frame rate or onboard storage is published for this model, and CYNRIN does not transfer the V03-T5's Sony IMX219 sensor or 1200p30 video detail into this column. Marketing copy stays at the 13MP label until the configuration sheet confirms the firmware for the exact order.
How long does the S7 battery last?
The frame cell is published at 260mAh and the only runtime value is a music playback band of 5–8h under reference conditions, the same range as the V03-PRO and the sport-cluster V06. The L1-PRO and L2-ULTRA publish a fixed ~7h and the V03-T5 up to five hours at maximum volume. The band is a measured range rather than an all-day guarantee, and no talk time, standby time or video recording time is published, so those figures are confirmed per project instead of being estimated from capacity.
How does the S7 charge and how long does it take?
The published charging method is magnetic charging, shared with the V03-T5, and the reference charging time is ≤2h under defined conditions — the same two-hour ceiling carried by the V03-PRO, L1-PRO and L2-ULTRA. The record does not publish pin layout, adapter wattage or whether the two-hour value covers a specific dock accessory, so cable, dock and charge-path details are confirmed on the configuration sheet before packaging copy is finalised.
What is the removable inner frame for?
The frame design is published as a removable inner frame, the only physical-design row in the S7 record and the only frame-structure entry across cam_tier1 besides the V03-PRO's flexible temples. The structure keeps the outer sport frame in place during activity and provides a carrier that buyers can plan optical or prescription inserts around. The record does not name insert compatibility, lens geometry or frame materials, so those items are not published — confirmed on the configuration sheet per project.
Is the S7 waterproof or sweat resistant?
No ingress-protection, waterproof or sweat-resistance row is published for the S7. CYNRIN does not apply an IP54 or similar claim to this model without a test report for the exact configuration, even though it is positioned for sport. Buyers whose retail copy requires weather or sweat resistance should raise the requirement at the Define gate so sealing scope and a tested rating can be quoted; until then the safe position is that ingress protection is not published — confirmed on the configuration sheet per project.
What is the difference between the S7 and the V03-T5 or L1-PRO?
All three carry a first-person camera, but at different tiers. The S7 and L1-PRO publish 13MP against the V03-T5's 8MP, while the V03-T5 alone publishes Sony IMX219 sensor detail, 1200p30 video, 4GB storage, Bluetooth 5.3 plus Wi-Fi and a companion app, none of which appears in the S7 record. The L1-PRO adds a 290mAh cell and a 1400mAh charging case; the S7 uses a 260mAh cell, magnetic charging and a removable inner frame aimed at sport channels.
What colours and lens options does the S7 offer?
No colours, lens-options, temple-design or frame-material rows are published for the S7, and CYNRIN does not copy the V03-PRO's photochromic lens or its Orange, Off-white and Black colourways into this column. Colour, lens finish and frame materials are treated as configuration items and evaluated against order quantity; structural or custom optical changes are typically ODM engagements at 3,000–5,000 units, with the final scope confirmed on the proforma invoice.
Does the S7 support Wi-Fi or a companion app?
No connectivity or companion-app row is published for the S7. The V03-T5 publishes Bluetooth 5.3 with 2.4 GHz Wi-Fi and the HeyCyan app, but those values belong to that column and are not carried across to the S7. Buyers planning app-connected features or wireless transfer should state the requirement at the Define gate; until a firmware configuration is confirmed, connectivity is not published — confirmed on the configuration sheet per project.
How many S7 units does an OEM engagement require?
Three quantity bands are open for S7 programmes. The lowest, 500 pieces, covers catalogue configuration of the published 13MP, 260mAh magnetic-charge build with the buyer's logo applied. Retail-ready branding with printed packaging to match sits at about 1,000 pieces. When a project needs a reworked frame or optical-insert tooling it moves into ODM territory, which is quoted per brief and most often lands between 3,000 and 5,000 pieces. Dock content and document scope can shift a project between bands, so sales fits the tier to your volume and market before any deposit is taken.
How far can a sports brand customise the S7?
Sports-brand programmes commonly configure logo position, frame and box colours, bundled magnetic docks, inner-frame insert schemes and the document pack, always relative to order size. The 13MP camera, 260mAh cell and magnetic charging stay fixed as the shared platform underneath. A wanted weather rating, added wireless connectivity, a different cell or a structural redesign cannot be borrowed from a sibling model; those are ODM items, generally scoped at 3,000-5,000 pieces, and each one is confirmed on paper before it is quoted.
What certification and test reports support the S7?
The manufacturer publishes CE, FCC and RoHS as certification capabilities, which is not the same as a blanket certified status for every S7 build. Because this frame is marketed into active use, the radio, safety and battery-transport paperwork is matched to the selling region at RFQ stage. Any sweat- or water-resistance claim is ring-fenced: it needs its own tested rating against the exact hardware and is never assumed from the sports positioning. The report index is handed over at RFQ and the final scope is fixed in writing before mass production.
What is the first step to launch an S7 programme?
Open with a short brief covering the quantity band, destination market, the activity the glasses are sold for, dock and accessory expectations, packaging scope and whether optical inserts or branding work are involved. The written reply is the S7 build sheet plus a sample plan, the MOQ band (500 catalogue / 1,000 branded / roughly 3,000-5,000 for ODM) and the certification-report scope for the region. From there the four written gates run in order, and series production usually starts 15-40 days following the deposit.
Project desk

Configure the S7 for your market

Share the activity you are buying for, the quantities and markets on your roadmap and any dock, insert or packaging must-haves. We come back with the written S7 build sheet, sample plan, MOQ band and the list of certification reports relevant to where you will sell.

Sample
Chat on WhatsApp
Your experience on this site will be improved by allowing cookies.