Smart eyewear OEM/ODM manufacturer · Shenzhen, China +86 19835872450 sales@cynrin.com
Sport Smart Glasses

YKC02 Sports Audio Glasses

The YKC02 is a sports smart glasses audio platform with Bluetooth 5.4, published surround sound, a 70mAh × 2 dual-cell layout, magnetic charging and about 8h reference playback, offered as an OEM/ODM configurable line for active audio brands.

  • Bluetooth 5.4 link for stable pairing during running and riding
  • Published surround sound keeps athletes aware of their surroundings
  • Dual-cell 70mAh × 2 power layout printed on the record
  • Magnetic charging docks the frame without handling a plug
  • About 8h reference playback for longer training sessions
Order a sample
Connectivity
Bluetooth 5.4
Battery capacity
70mAh × 2
Charging method
Magnetic charging
Charging time
≤2h
Music playback time
~8h
Features
Surround sound

Playback and charging figures are reference values measured under defined conditions; frame design, lens options and trim are confirmed in writing on the configuration sheet per project.

Platform capabilities

Audio-first sports glasses built around Bluetooth 5.4

YKC02 is the audio-first column of the sports family: its published record contains no camera row and centers on surround-sound playback for training. Every capability below is quoted directly from that record.

Bluetooth 5.4 pairing

The published Bluetooth 5.4 connectivity carries the wireless link to the athlete's phone, giving brands a current-generation pairing baseline for music and call audio across running, riding and gym sessions.

Surround sound on the move

The published feature record lists Surround sound, positioning YKC02 for training where athletes want audio while staying aware of their surroundings rather than accepting the sealed isolation of conventional earbuds.

Dual 70mAh × 2 cells

Battery capacity is published as 70mAh × 2, a dual-cell layout that spreads power across both sides of the frame and supports the about 8h reference playback figure quoted elsewhere in the specification record.

Magnetic frame charging

The published charging method is magnetic charging with no charging case listed, so the frame docks onto contacts for a reference charge within about two hours between training sessions without handling a plug.

Audio-first sport platform

YKC02 publishes no camera row, making it the Bluetooth audio glasses option for sports brands that want a lean, music-first catalogue SKU with a clear 500-unit catalogue OEM entry point and simple channel story.

Runner on a wooded trail wearing YKC02 Bluetooth sports audio glasses during an outdoor training session
Designed around real use

Sound for the session, awareness for the road.

YKC02 is built for athletes who want music and calls without losing awareness of their surroundings, and the published record keeps the story focused: Bluetooth 5.4, surround sound and a 70mAh × 2 dual-cell layout. The frame charges magnetically in a reference time of about two hours, so it docks cleanly at a locker or in a gear area between sessions.

About 8h of reference music playback covers long training days, and the record does not promise any camera or remote-shutter function on this model. Frame design, weight, lens options and colours are not published and are confirmed on the configuration sheet per project rather than borrowed from the camera columns.

  • 01 Running and riding audio that leaves situational hearing open
  • 02 Magnetic docking between sessions at home, gym or event
  • 03 Lean music-first catalogue SKU for sports audio retailers
YKC02 on the CYNRIN line

On the 20,000+ m² Shenzhen campus, YKC02 production seals and acoustic-tests the speaker arms, then runs magnetic-contact checks and RF verification on the Bluetooth 5.4 link before final acoustic inspection; catalogue OEM MOQ 500 units.

See the manufacturing record
Engineering record

YKC02 Sports Audio Glasses specifications

The published platform specification, grouped by engineering domain and maintained as system data. Values are confirmed in writing per project before tooling or mass production.

01

Audio & Connectivity

Connectivity
Bluetooth 5.4
02

Power & Charging

Battery capacity
70mAh × 2
Charging method
Magnetic charging
Charging time
≤2h
Music playback time
~8h
03

Physical & Optics

Features
Surround sound

Values are shown from the published CMS product record. Specification changes driven by component or firmware revisions are confirmed in writing on the proforma invoice before tooling or mass production; runtime and charging are reference figures.

Reading the numbers

What the YKC02 specifications mean in use

Each card pairs a value printed in the YKC02 specification record with what it changes for sports procurement, and flags the rows the record leaves open. Playback and charging figures are reference values measured under defined conditions.

Connectivity Bluetooth 5.4

Bluetooth 5.4 is the published wireless link for YKC02, matching the D17 and ZH12 sports audio columns while the V06 and S7 camera columns publish no connectivity row at all; buyers receive a current-generation pairing baseline across phones for music and call audio.

Version alone does not guarantee range or pairing speed in the field, since phone hardware, firmware and environment affect both; companion app support is not published and is confirmed on the configuration sheet per project.

Battery capacity 70mAh × 2

The record publishes a 70mAh × 2 dual-cell layout, distinct from the single 115mAh D17 cell, the 100mAh ZH12 cell and the 260mAh cells on the V06 and S7 camera columns, reflecting YKC02's lean audio-first power architecture split across both sides of the frame.

CYNRIN quotes 70mAh × 2 exactly as published and does not total or reinterpret the number; how the two cells are managed by firmware is not published, so plan runtime from the about-8h playback row.

Charging method Magnetic charging

Magnetic charging is the published interface for YKC02, shared in the sports table with the V06 and S7 camera columns and contrasting with the Type-C path published for D17 and ZH12; wearers dock the frame onto contacts without handling a plug between sessions.

No charging case is listed for YKC02, so dock or cable accessories are not assumed; the mating accessory and any case option are confirmed in writing on the configuration sheet per project.

Charging time ≤2h

A reference charge within about two hours restores the frame between morning and evening sessions, matching the V06 and S7 reference time while the Type-C D17 and ZH12 columns publish about one hour, a difference buyers can use to plan turnaround at retail and events.

Reference figure measured under defined conditions with a specified charger; dock alignment, ambient temperature and charger rating shift the result. The path covered is the frame only, since no case is published.

Music playback time ~8h

About 8h of reference playback places YKC02 alongside ZH12 at the longest published runtime in the sports table, above D17's about 7h and the 5-8h bands on the camera columns, supporting full training days and multiple sessions before a magnetic recharge.

Measured at a defined volume and pairing profile; high volume, calls, cold and background scanning reduce real runtime. Standby time and talk time are not published in the YKC02 specification record.

Features Surround sound

Surround sound is the single published feature for YKC02, and the deliberate absence of a camera or remote-shutter row separates it from D17 and ZH12, whose record lists Surround sound; Remote shutter, and from the 8MP and 13MP camera columns in the same comparison.

The record does not publish driver size, open-ear architecture or an IP rating, so CYNRIN does not claim them; acoustic tuning, enclosure sealing and lens options are confirmed on the configuration sheet per project.

Choose within the family

YKC02 vs the CYNRIN sports glasses platforms

Every cell comes from the published specification record of the model shown — no estimated or borrowed numbers. Gaps stay as Not published rather than being filled from a sibling model.

Published specification record per model across the sports family. Linked names open that product page.
Specification V06 S7 YKC02 D17 ZH12
Position 8 MP sports camera 13 MP sports camera Surround audio, magnetic Fast-charge shutter audio Sports audio remote shutter
Camera 8MP 13MP Not published Not published Not published
Connectivity Not published Not published BT 5.4 BT 5.4 BT 5.4
Battery capacity 260mAh 260mAh 70mAh × 2 115mAh 100mAh
Charging interface Magnetic charging Magnetic charging Magnetic charging Type-C Type-C
Reference charging time ≤ 2h ≤ 2h ≤ 2h ~1h ~1h
Reference playback time 5–8h music 5–8h music ~8h music ~7h music ~8h music
Frame design Removable inner frame Removable inner frame Not published Not published Not published
Audio / control feature Not published Not published Not published Not published Not published
Colours Orange / White-ice blue / Black / Black-ice blue Not published Not published Not published Not published

YKC02 is the audio-first magnetic column: Bluetooth 5.4, a 70mAh × 2 dual-cell layout, about 8h reference playback and Surround sound with no camera and no remote shutter published, unlike the Type-C D17 and ZH12 columns. Frame design and colours read Not published because those rows are absent from its record, not because they are zero or borrowed from V06.

Applications

Where YKC02 fits

The published surround-sound and long-reference-playback record points YKC02 squarely at running, riding and gym-floor audio deployments rather than capture use.

Cyclists riding in a peloton while wearing YKC02 sports audio glasses

Group ride audio

Cycling groups pair YKC02 over Bluetooth 5.4 for music and call prompts while published surround sound keeps riders aware of the peloton and traffic, with about 8h reference playback covering long routes without a recharge.

Cyclist resting while YKC02 sports audio glasses dock on magnetic charging contacts

Magnetic turnaround

Between sessions the frame docks on magnetic contacts for a reference charge within about two hours, a plug-free routine suited to gym bags, locker rooms and event booths where desk space and spare cables are in short supply.

Runner wearing YKC02 Bluetooth audio glasses on an outdoor training run

Running playlist wear

Runners use the audio-first 70mAh × 2 platform for music with no on-board camera, matching brands that want a lean sports audio SKU with a 500-unit catalogue OEM entry point and a straightforward retail story for training customers.

From brief to shipment

Every YKC02 programme moves through Define, Configure, Validate and Produce, with timelines for each gate on the full OEM/ODM process page before you send a brief for the sports audio platform.

  1. Define
  2. Configure
  3. Validate
  4. Produce
See the full OEM/ODM process
2018CYNRIN established in Shenzhen
20,000+ m²Self-owned production campus
500 pcsCatalogue OEM entry MOQ
15–40 daysTypical mass-production window
Project documents

Available on request

Buyer questions

YKC02 Sports Audio Glasses FAQ

What category of product is the YKC02?
YKC02 is a sports smart glasses audio platform, also described as Bluetooth audio glasses, rather than a camera product. The published record lists Bluetooth 5.4 connectivity, a 70mAh × 2 battery layout, magnetic charging, a reference charge time of about two hours, about 8h of reference music playback and a single feature entry reading Surround sound. There is no camera row in its specification, which positions it for athletes who want audio while staying aware of their surroundings.
What does Bluetooth 5.4 mean for YKC02 users?
Bluetooth 5.4 is the connectivity version published for YKC02, the same version listed for the D17 and ZH12 sports audio columns, while the V06 and S7 camera columns publish no connectivity row. It gives buyers a current-generation wireless baseline for pairing with phones during running and riding. CYNRIN does not quote range, latency or pairing-speed numbers because those depend on the paired phone, environment and firmware; no companion app is published, so app behaviour is confirmed on the configuration sheet per project.
What is the YKC02 battery capacity and how is it arranged?
The published battery capacity is 70mAh × 2, meaning a dual-cell layout with a 70mAh cell on each side of the frame rather than one central battery. Inside the sports table this is distinct from the single 115mAh cell published for D17, the 100mAh ZH12 cell and the 260mAh cells on the V06 and S7 camera columns. CYNRIN quotes 70mAh × 2 exactly as printed and publishes no combined total or cell-management detail, which is why runtime planning should use the about-8h playback row.
How long does the YKC02 battery last during a workout?
The published music playback time is about 8h as a reference value measured under defined conditions, which ties YKC02 with ZH12 for the longest reference runtime in the sports table and sits above D17's about 7h and the 5-8h bands on the V06 and S7 camera columns. CYNRIN treats it as a reference rather than a guarantee, since high volume, calls, cold weather and background scanning shorten real results. Talk time and standby time are not published and are confirmed on the configuration sheet if they matter to your channel.
How does the YKC02 charge and how long does it take?
The published charging method is magnetic charging, with no charging case listed in the record, so the frame docks onto magnetic contacts rather than plugging in a Type-C cable like the D17 and ZH12 columns. The published reference charging time is up to 2 hours. Charger rating, dock alignment and temperature shift the actual result, and any charging accessory beyond the basic dock is confirmed in writing on the configuration sheet per project rather than assumed from the camera models.
What lens, frame, weight and water-resistance options are published?
None of those parameters are published for YKC02: the record contains no frame design, weight, lens options, colours or IP rating row, even though it is a sports model. CYNRIN therefore does not borrow the removable inner frame or colourways published for V06, and never prints an IP rating that has not been tested for this configuration. These stay as gaps and are documented on the configuration sheet, where available tints, frame finishes and test-report scope are confirmed per project and destination market.
How is the YKC02 different from the D17 sports audio glasses?
Both publish Bluetooth 5.4 and Surround sound, but the power records differ: YKC02 uses a 70mAh × 2 dual-cell layout with magnetic charging, a reference charge time up to 2 hours and about 8h playback, while D17 publishes a single 115mAh cell, Type-C charging, about 1 hour charging and about 7h playback. The feature rows also differ, with D17 listing Surround sound; Remote shutter and YKC02 listing Surround sound only, so neither a camera nor a shutter function should be assumed on YKC02.
What is the minimum order quantity for the YKC02?
Catalogue OEM entry for YKC02 starts at 500 units, where the published Bluetooth 5.4 sports audio platform is configured with available options and your logo treatment. Branded OEM with fuller logo, packaging and documentation scope typically begins at 1,000 units. ODM work involving structural or engineering changes, such as acoustic or frame redesign, is evaluated separately and typically lands in the 3,000-5,000 unit range, with the exact threshold confirmed after engineering reviews the brief.
Can CYNRIN customize the YKC02 for our sports brand?
Yes. YKC02 is offered as an OEM/ODM configurable platform covering logo placement, colourway, available lens and accessory selection, packaging structures and multilingual documentation. Because frame design and colours are not pre-published, the available trim matrix is confirmed against your target quantity, sales channel and destination market. Acoustic or structural changes beyond the catalogue configuration are scoped as ODM with separate tooling and NRE review rather than treated as standard OEM.
Which certifications apply to the YKC02?
CYNRIN lists CE, FCC and RoHS among its certification capabilities rather than claiming YKC02 is certified out of the box. The applicable reports, standards and configuration scope are verified against your destination market and provided on request, because the EU, US and other regions apply different requirements to a wireless audio device and certification follows the product as configured, including any chosen charger and documentation package.
Does the YKC02 include a camera or remote shutter for photos?
No camera or remote shutter is published for YKC02. Its Features row contains Surround sound only, and the specification record has no camera row, unlike the V06 and S7 columns with 8MP and 13MP cameras and the D17 and ZH12 columns whose feature record reads Surround sound; Remote shutter. YKC02 is positioned as an audio-first sports model, so any photo or capture capability your programme requires would use a different catalogue platform, confirmed with engineering during the Define gate.
Can we order samples and how long does YKC02 production take?
Samples are scheduled after the product brief is reviewed, with timing confirmed in writing rather than promised on the page. Once a deposit is in place, mass production for catalogue and branded orders typically runs 15-40 days depending on configuration, packaging scope and order quantity. The exact schedule, including sample shipment, acoustic verification and certification timing for your destination market, is agreed up front for each YKC02 programme.
How do we start an RFQ or YKC02 project with CYNRIN?
Send your target quantity, intended sports market, preferred colourway or lens configuration and sales channel, along with certification expectations and any accessory requirements. Engineering maps the YKC02 catalogue platform to the brief and replies with the configuration sheet, sample timing, the applicable MOQ tier and the certification scope for your destination market, so the 500-unit entry point and any branded OEM or ODM work are clear before deposit.
Project desk

Configure the YKC02 for your market

Send your target quantity, colourway and lens preferences, sales channel and destination market. The team replies with the YKC02 configuration sheet, sample timing, MOQ tier and the certification scope applicable to your build.

Sample
Chat on WhatsApp
Your experience on this site will be improved by allowing cookies.