What are the L1-PRO AI camera glasses?
CYNRIN confirms the L1-PRO as a high-resolution 13MP AI camera glasses platform aimed at creator and first-person content programmes. The published record lists a 13MP camera, a 290mAh frame battery, a 1400mAh charging case, a reference charging time of no more than two hours and a reference music playback time of approximately seven hours. It is offered as a configurable OEM platform, so branding, packaging and the unpublished interface and optical details are agreed on the configuration sheet for each project.
What camera resolution does the L1-PRO publish?
The published camera value is 13MP, placing the L1-PRO alongside the L2-ULTRA and S7 in the higher tier of cam_tier1, while the V03-T5 and V03-PRO publish 8MP. The 13MP label is the full imaging record: no sensor name, photo format, video resolution, frame rate or onboard storage is published for this model. CYNRIN does not transfer the V03-T5's Sony IMX219 sensor detail or its 1200p30 video record to this column, and those items are confirmed per project.
What battery and charging case does the L1-PRO include?
The frame contains a published 290mAh cell, the joint-largest in cam_tier1 with the L2-ULTRA, and the package includes a 1400mAh charging case. The case figure is a single fixed capacity in this record, whereas the L2-ULTRA publishes a dual 900 / 1400mAh entry. The record does not state how many full recharges the case provides, its own charging input or dock mechanism, so those engineering and packaging questions are answered on the configuration sheet rather than estimated.
How long does the L1-PRO take to charge?
The published charging time is ≤2h under reference test conditions, a ceiling shared with the V03-PRO, L2-ULTRA and S7, while the V03-T5 lists about 60 minutes. Importantly, the L1-PRO record does not name a charging interface — neither Type-C nor magnetic is published — so the two-hour value must be quoted on its own. Adapter rating, cable, whether the time applies to the frame or the case, and charge behaviour at low temperature are confirmed in writing per project.
How long does the L1-PRO battery last in use?
The only published runtime is a music playback time of ~7h under reference conditions, matching the L2-ULTRA. The V03-PRO and S7 publish a 5–8h band and the V03-T5 publishes up to five hours at maximum volume. The about-seven-hours figure is a measured playback reference, not an all-day guarantee, and no dedicated video recording time is published for the L1-PRO. Real sessions vary with camera use, volume and pairing, and are confirmed on the configuration sheet for your firmware configuration.
Does the L1-PRO charge by Type-C or a magnetic connector?
Neither interface is published for the L1-PRO. The specification record includes a charging time of ≤2h but no charging-method row, while the L2-ULTRA separately publishes Type-C and the V03-T5 publishes a 2-pin magnetic USB dock. CYNRIN confirms the applicable interface per configuration rather than borrowing a sibling's connector, because the dock type affects accessory bundles, packaging cut-outs and tooling. Buyers with a fixed Type-C or magnetic requirement should state it at the Define gate for written confirmation.
What is the difference between the L1-PRO and the L2-ULTRA?
Both publish a 13MP camera, a 290mAh cell, a ≤2h reference charge and ~7h playback, and both sit in cam_tier1. The difference is in charging: the L1-PRO publishes a fixed 1400mAh charging case and no charging interface, whereas the L2-ULTRA publishes a Type-C interface and a dual 900 / 1400mAh charging case record. Choose the L1-PRO when a single documented case capacity fits the brief, and the L2-ULTRA when a named Type-C interface and a choice of case capacities are required.
What lens, colour and frame options does the L1-PRO offer?
None of those rows are published for the L1-PRO. The record contains no lens options, no colours and no frame material, temple or weight values, and CYNRIN does not copy the photochromic lens of the V03-PRO or the TR/PC frame of the V03-T5 into this column. Lens track, colourway, frame finish and optical certification scope are therefore treated as configuration items, evaluated against the order quantity and confirmed in writing on the proforma invoice before tooling begins.
What is the MOQ for an L1-PRO OEM order?
CYNRIN confirms three entry points. Catalogue OEM configuration starts at 500 units, branded OEM with the buyer's logo and packaging starts at 1,000 units, and ODM engineering changes typically run at 3,000–5,000 units per project. Because the L1-PRO ships frame plus charging case, packaging structure and battery documentation influence which tier a brief falls into; the team maps target quantity, channel and accessory bundle to the correct entry point before any deposit is requested.
Can the L1-PRO be customised for our brand?
Customisation covers logo placement, packaging for the frame and 1400mAh case, documentation scoping and accessory bundling, subject to order quantity. The 13MP camera, 290mAh cell and 1400mAh case remain the shared platform; requests for a specified charging interface, custom lens, a different case capacity or structural changes are treated as ODM projects that typically require 3,000–5,000 units. All such changes are evaluated against the brief and confirmed in writing rather than assumed from sibling models.
Which certifications apply to the L1-PRO?
CE, FCC and RoHS are published as certification capabilities of the manufacturer, not as claims that the L1-PRO is certified in a specific configuration. With a frame battery and a separate 1400mAh charging case in the package, battery transport documentation is reviewed alongside radio and safety reports for the destination market. CYNRIN provides the certification report index at RFQ stage and confirms in writing which reports apply to the exact frame, case and packaging configuration before mass production.
How long can the L1-PRO record video continuously?
No video recording time is published for the L1-PRO, and the record includes no video resolution or storage figure either. The only runtime value is ~7h of music playback under reference conditions, which is a different load profile and cannot be converted into a continuous-capture claim. CYNRIN advises against borrowing the V03-T5's approximate 40-minute figure. Continuous-record limits, clip rollover and thermal behaviour are confirmed on the configuration sheet for the specific firmware before claims are printed.
How do we start an L1-PRO project?
Send your target quantity, destination market, charging interface preference, packaging scope for the frame and 1400mAh case, and any branding requirements. CYNRIN replies with the L1-PRO configuration sheet, sample timing, the applicable MOQ — 500 for catalogue OEM, 1,000 for branded and typically 3,000–5,000 for ODM changes — and the certification and battery-document scope for your market. The programme then moves through Define, Configure, Validate and Produce, with mass production typically scheduled 15–40 days after deposit.