Smart eyewear OEM/ODM manufacturer · Shenzhen, China +86 19835872450 sales@cynrin.com
AI Camera Glasses

L2 Ultra AI Camera Glasses

The L2-ULTRA is CYNRIN's 13MP AI camera glasses platform for creator and field capture, combining a 290mAh frame cell, a Type-C interface and a charging case published at two capacities, 900 / 1400mAh, with a reference playback span of about seven hours for brand buyers.

  • 13MP camera in the high-resolution tier of the camera family
  • 290mAh frame cell with a reference music playback span of ~7h
  • Charging case published at two capacities, 900 / 1400mAh
  • Type-C interface with a reference charging time within two hours
  • Configurable OEM programme with case choice confirmed per project
Order a sample
Camera
13MP
Battery capacity
290mAh
Charging case capacity
900 / 1400mAh
Charging method
Type-C
Charging time
≤2h (Type-C)
Music playback time
~7h

Playback and charging figures are reference values measured under defined conditions; the two case capacities are configured per project, and lens, colour and frame details are not published and are confirmed in writing.

Platform capabilities

A 13MP column with a two-capacity charging case

The L2-ULTRA publishes six specification rows, and each capability below is copied from that record; the dual case entry is the feature that separates it from every other column in cam_tier1.

13MP first-person camera

The published camera is a 13MP module, the high-resolution tier shared with the L1-PRO and S7; the record names no sensor, photo or video pipeline or storage, so imaging claims beyond 13MP are confirmed on the configuration sheet.

900 / 1400mAh case choice

The charging case is published as a dual value, 900 / 1400mAh, letting one frame platform ship behind two case capacities for different price and packaging tiers; which capacity applies to an order is selected during configuration.

290mAh frame cell

The 290mAh frame battery matches the L1-PRO as the joint-largest published cell in cam_tier1, 30 mAh above the S7 and 70 mAh above the two 8MP columns, giving the 13MP platform a documented power ceiling.

Type-C charging interface

Type-C is the published charging interface, with a reference charging time of ≤2h (Type-C) under defined conditions; naming the interface as well as the time lets buyers plan standard cables and accessories rather than a proprietary dock.

About seven hours playback

The published music playback time is ~7h under reference conditions, equal to the L1-PRO and positioned inside the wider 5–8h bands of the V03-PRO and S7, and it should be quoted as a reference rather than a fixed daily promise.

L2-ULTRA camera glasses shown flat with the 900 and 1400mAh charging case options
Designed around real use

One frame, two charging-case configurations.

The L2-ULTRA answers a packaging problem rather than an imaging one. The camera stays at the published 13MP tier and the frame carries a 290mAh cell, but the charging case is documented at two capacities, 900 / 1400mAh, so a brand can position a lighter case at one price point and a higher-capacity case at another without changing the glasses platform.

Charging is published as Type-C with a reference time within two hours and playback at about seven hours, keeping the power story legible on retail packaging. As with the L1-PRO, no lens, colour, frame material or storage value is published, and those items are confirmed on the configuration sheet rather than taken from another column.

  • 01 Two case capacities serving two price or bundle tiers
  • 02 Creator and field capture on the 13MP camera
  • 03 Standard Type-C accessory and cable programmes
L2-ULTRA on the CYNRIN line

The L2-ULTRA shares the 13MP module SMT and 290mAh cell-aging lines with the L1-PRO, and its Type-C port inspection and dual-capacity case cell-matching run as a parallel case programme on the CYNRIN campus. Catalogue OEM starts at 500 units.

See the manufacturing record
Engineering record

L2 Ultra AI Camera Glasses specifications

The published platform specification, grouped by engineering domain and maintained as system data. Values are confirmed in writing per project before tooling or mass production.

01

Imaging & Storage

Camera
13MP
02

Power & Charging

Battery capacity
290mAh
Charging case capacity
900 / 1400mAh
Charging method
Type-C
Charging time
≤2h (Type-C)
Music playback time
~7h

Values are shown from the published CMS product record. Specification changes driven by component or firmware revisions are confirmed in writing on the proforma invoice before tooling or mass production; runtime and charging are reference figures.

Reading the numbers

What the L2-ULTRA specifications mean in use

Each card pairs a value copied character for character from the L2-ULTRA published record with its procurement meaning. Charging and playback are reference figures, and lens, colour and frame gaps are confirmed on the configuration sheet per project.

Camera 13MP

The 13MP camera puts the L2-ULTRA in the high-resolution tier of cam_tier1 alongside the L1-PRO and S7, against the 8MP V03-T5 and V03-PRO. As with the L1-PRO, the megapixel label is the entire imaging record — no sensor name, output format, video resolution or storage is published — so differentiation here comes from charging configuration rather than extra camera detail.

Sensor identity, photo and video pipeline and onboard storage are not published; claims beyond the 13MP label are confirmed per project.

Battery capacity 290mAh

The 290mAh frame cell equals the L1-PRO and is the joint-largest in cam_tier1, ahead of the S7's 260mAh and the 220mAh cells in the V03-T5 and V03-PRO. It is a hardware ceiling shared by the two high-end creator columns; runtime still depends on how the 13MP camera and radio are used, and buyers should plan from the ~7h playback reference rather than from capacity alone.

290mAh is a nominal rating with no published voltage; endurance under camera and radio load is confirmed per project.

Charging case capacity 900 / 1400mAh

The dual value 900 / 1400mAh is the only multi-capacity case record in the family: the L1-PRO publishes a fixed 1400mAh and every other cam_tier1 column publishes no case at all. It documents two legitimate case configurations for the same frame, which lets a brand range the L2-ULTRA across two bundle or price tiers while keeping the glasses SKU constant.

The record does not state which SKUs ship which case, recharge counts or case input; capacity selection is confirmed per order.

Charging interface Type-C

Type-C is the published charging interface, shared with the V03-PRO within cam_tier1, while the V03-T5 and S7 publish magnetic charging and the L1-PRO publishes none. A named standard interface removes one of the L1-PRO's configuration unknowns and lets buyers specify common cables, chargers and retail accessory bundles without waiting for a connector decision.

The record names Type-C only; supported adapter wattage, cable specification and case input connector are not published and are confirmed per project.

Reference charging time ≤2h (Type-C)

The published reference charging time is no more than two hours over Type-C, the same two-hour ceiling as the V03-PRO, L1-PRO and S7; the V03-T5 lists about 60 minutes via its magnetic dock. Because the value names the interface in brackets, packaging copy can pair the two-hour ceiling directly with Type-C rather than presenting the connector as an open question.

≤2h is a reference ceiling under defined conditions; whether it covers the frame, the case or both is confirmed on the configuration sheet.

Reference playback time ~7h

The ~7h music playback reference matches the L1-PRO, sits above the V03-T5's up-to-five-hours figure and inside the 5–8h bands published for the V03-PRO and S7. It is the only runtime value published for the L2-ULTRA, so the about hedge should be retained and the figure should not be extended into talk time, standby or video-recording claims.

~7h is measured under defined playback conditions; no video recording time is published and other runtimes are confirmed per project.

Choose within the family

L2-ULTRA vs the high-resolution CYNRIN camera-glasses platforms

Every cell comes from the published specification record of the model shown — no estimated or borrowed numbers. Gaps stay as Not published rather than being filled from a sibling model.

Published specification record per model, flagship and 13 MP platforms. Linked names open that product page.
Specification V03-T5 V03-PRO L1-PRO L2-ULTRA S7
Position Flagship 8 MP AI camera 8 MP photochromic Type-C 13 MP with charging case 13 MP Type-C dual case 13 MP sports camera
Camera 8MP, Sony IMX219 4P 8MP 13MP 13MP 13MP
Battery capacity 220 mAh / 3.85 V 220mAh 290mAh 290mAh 260mAh
Charging case Not published Not published 1400mAh 900 / 1400mAh Not published
Charging interface 2-pin magnetic USB, approx. 60 minutes Type-C Not published Type-C Magnetic charging
Reference charging time Not published ≤ 2h ≤ 2h ≤ 2h ≤ 2h
Reference playback time up to 5 hours at maximum volume under reference test conditions music 5–8h music ~7h music ~7h music 5–8h music
Lens options Blue-light filtering, sunglasses or photochromic Photochromic Not published Not published Not published
Frame / weight TR frame, PC temples and lenses, stainless-steel hinge Flexible Not published Not published Removable inner frame
Colours Not published Orange / Off-white / Black Not published Not published Not published

In cam_tier1 the L2-ULTRA is the only column combining a 13MP camera, a 290mAh cell, a named Type-C interface and a dual 900 / 1400mAh charging case, with a ≤2h reference charge and ~7h playback. Against the L1-PRO it adds the published connector and the lower case-capacity option; lens, frame and colour rows remain Not published in this model's own record and are confirmed on the configuration sheet per project, never copied from a sibling.

Applications

Where L2-ULTRA fits

The selectable case capacity and named Type-C interface suit buyers ranging one certified frame across multiple bundle or price tiers.

L2-ULTRA sample kit showing the frame and both charging case capacities

Two-tier case bundling

Distributors range the same 13MP frame behind the 900mAh and 1400mAh cases, creating entry and premium bundles with one certified glasses platform and a single set of service and spare-parts procedures.

Field technician topping up L2-ULTRA from a charging case on site

Field capture programmes

Field teams use the 290mAh frame plus the chosen charging case to keep the 13MP camera running across site visits, with the ~7h playback reference and the ≤2h Type-C charge framing shift planning.

Industrial deployment kit built around L2-ULTRA camera glasses

Industrial solution bundles

Solution integrators pair the L2-ULTRA with standard Type-C cabling and a declared case capacity, confirming the unpublished lens and frame scope on the configuration sheet before the catalogue MOQ of 500 units is released.

From brief to shipment

L2-ULTRA programmes move through four gates — Define, Configure, Validate and Produce — and the full process, timelines and deliverables are documented on the OEM/ODM process page.

  1. Define
  2. Configure
  3. Validate
  4. Produce
See the full OEM/ODM process
2018CYNRIN established in Shenzhen
20,000+ m²Self-owned production campus
500 pcsCatalogue OEM entry MOQ
15–40 daysTypical mass-production window
Project documents

Available on request

Buyer questions

L2 Ultra AI Camera Glasses FAQ

What are the L2-ULTRA AI camera glasses?
CYNRIN confirms the L2-ULTRA as a 13MP AI camera glasses platform in the high-resolution camera tier. The published record lists a 13MP camera, a 290mAh frame battery, a charging case published at two capacities, 900 / 1400mAh, a Type-C charging interface, a reference charging time of no more than two hours and a reference music playback time of approximately seven hours. It ships as a configurable OEM platform, with the case capacity, branding and packaging agreed per project on the configuration sheet.
What does the 900 / 1400mAh charging case value mean?
The published charging case capacity is written as 900 / 1400mAh, meaning the same L2-ULTRA frame platform is supported by two case configurations rather than one fixed accessory. This is the only dual-capacity case record in cam_tier1: the L1-PRO publishes 1400mAh alone and the other columns publish no case. The record does not assign a case to a specific SKU, quote recharge cycles or name the case input, so the capacity selected for your order and its packaging claims are confirmed in writing.
What camera does the L2-ULTRA use?
The published camera value is 13MP, placing the L2-ULTRA with the L1-PRO and S7 above the 8MP V03-T5 and V03-PRO. No sensor name, photo resolution or format, video resolution, frame rate or onboard storage is published for this model, and CYNRIN does not transfer the V03-T5's Sony IMX219 4P detail to this column. Marketing copy should stay at the 13MP label until the configuration sheet confirms any further imaging parameters for the exact firmware.
How does the L2-ULTRA charge and how long does it take?
The published charging interface is Type-C, and the charging time is ≤2h (Type-C) under reference conditions — the same two-hour ceiling as the V03-PRO, L1-PRO and S7, against the V03-T5's approximate 60-minute magnetic charge. The record does not state whether the two-hour value covers the frame only or the frame seated in the 900 / 1400mAh case, so adapter wattage and the frame-versus-case charge path are confirmed on the configuration sheet before tooling.
How long does the L2-ULTRA battery last?
The frame cell is published at 290mAh and the only runtime value is a music playback time of ~7h under reference conditions, equal to the L1-PRO. The V03-PRO and S7 publish a 5–8h band and the V03-T5 publishes up to five hours at maximum volume. The about-seven-hours figure is a measured playback reference, not an all-day guarantee, and no talk time, standby time or video recording time is published, so those values are confirmed per project rather than estimated from capacity.
What is the difference between the L2-ULTRA and the L1-PRO?
The two models share the 13MP camera, 290mAh frame cell, ≤2h reference charge and ~7h playback. The L1-PRO publishes a single 1400mAh charging case and names no charging interface, so the connector is a configuration item. The L2-ULTRA publishes a Type-C interface and a dual 900 / 1400mAh case record. Choose the L1-PRO when one fixed case capacity is enough; choose the L2-ULTRA when a standard connector and two documented bundle tiers are part of the channel plan.
Which case capacity ships with a standard L2-ULTRA order?
Neither case capacity is marked as standard in the published record; the value is documented as 900 / 1400mAh precisely because the frame supports both configurations. CYNRIN confirms which capacity applies to each order at the Configure gate, along with case packaging, labelling and battery documentation for freight. Buyers should not assume one option is the default, and any retail claim about recharge cycles or extra days of use is held until the chosen configuration is confirmed in writing.
What lens, colour and frame options does the L2-ULTRA offer?
No lens options, colours, temple design, frame material or weight rows are published for the L2-ULTRA. As with the L1-PRO, CYNRIN does not copy the photochromic lens and colourways of the V03-PRO or the materials record of the V03-T5 into this column. Optical, colour and frame-finish requirements are treated as configuration items, evaluated against order quantity — ODM for structural change typically starts at 3,000–5,000 units — and confirmed on the proforma invoice.
What is the MOQ for an L2-ULTRA OEM order?
CYNRIN confirms three entry points. Catalogue OEM configuration starts at 500 units, branded OEM with the buyer's logo and packaging starts at 1,000 units, and ODM engineering changes typically run at 3,000–5,000 units per project. Because the programme includes a selectable 900 / 1400mAh case, the case mix, packaging structure and battery documentation influence which tier applies; the sales team maps target quantity and channel to the correct entry point before a deposit is requested.
Can the L2-ULTRA be customised for our brand?
Customisation covers logo placement, the choice between the two published case capacities, packaging for frame and case, documentation scoping and accessory bundling, subject to order quantity. The 13MP camera, 290mAh cell and Type-C interface remain the shared platform; requests for custom lens tracks, additional colours, an unpublished case capacity or structural changes are treated as ODM and typically require 3,000–5,000 units. Every change is evaluated against the brief and confirmed in writing rather than inferred from sibling models.
Which certifications apply to the L2-ULTRA?
CE, FCC and RoHS are published as certification capabilities of the manufacturer, not as claims that the L2-ULTRA is certified in a specific configuration. Because the package contains a frame cell and a separate 900 / 1400mAh charging case, battery transport documentation for both declared cells is reviewed alongside the radio and safety reports for the destination market. CYNRIN provides the certification report index at RFQ stage and confirms the applicable report scope in writing before mass production.
How long can the L2-ULTRA record video continuously?
No video recording time is published for the L2-ULTRA, and the record names no video resolution or onboard storage. The single published runtime is ~7h of music playback under reference conditions, which is a different load profile and cannot be restated as continuous capture. CYNRIN advises against borrowing the V03-T5's approximate 40-minute figure; continuous-record limits, thermal behaviour and clip rollover for the chosen 13MP firmware are confirmed on the configuration sheet per project.
How do we start an L2-ULTRA project?
Send your target quantity, destination market, preferred case capacity from the published 900 / 1400mAh options, packaging scope and any branding requirements. CYNRIN replies with the L2-ULTRA configuration sheet, sample timing, the applicable MOQ — 500 for catalogue OEM, 1,000 for branded and typically 3,000–5,000 for ODM changes — and the certification and battery-document scope for your market. The programme then moves through Define, Configure, Validate and Produce, with mass production typically scheduled 15–40 days after deposit.
Project desk

Configure the L2-ULTRA for your market

Send your target quantity, destination market, preferred case capacity, Type-C accessory scope and packaging requirements. CYNRIN replies with the L2-ULTRA configuration sheet, sample timing, the applicable MOQ and the certification report scope for your market.

Sample
Chat on WhatsApp
Your experience on this site will be improved by allowing cookies.