Every smart glasses supplier answers "do you have quality control?" with yes. The question separates no one. What separates a factory with a working quality system from a reseller with a QC-room photo is the second layer of questions — the ones that demand documents, numbers and named processes rather than reassurance. This article is a working question list for procurement teams: the questions to ask a smart glasses supplier, the answers that indicate a real lot-control system, and the red flags in how those answers arrive.
The system behind the good answers is described in depth on the in-process quality page (IQC/IPQC/OQC gates, AQL and traceability) and the testing and reliability catalog. This article is the audit script you can paste into a supplier email or use live on a factory walk; the broader vendor-selection method is the 15-point manufacturer verification checklist.
Questions About the Inspection Gates
"What exactly is checked at IQC, IPQC and OQC on my product?" A real answer is part-specific: which incoming components receive lot-code checks and functional sampling (cells, drivers, boards, optical elements), which stations run first-article and patrol inspection during assembly, and which check set the outgoing AQL sample covers. A generic "we check all materials three times" is a brochure answer. Ask for the inspection record forms — blank forms prove a system exists; filled, lot-numbered records prove it runs.
"What happens to a lot when OQC fails?" The credible answer describes disposition, not denial: the lot is held; critical findings stop shipment pending root-cause analysis; major failures trigger 100% screening or rework and a fresh OQC sample; the buyer is informed before cargo booking. If the answer is "that never happens," treat it as an evasion — every factory experiences failed lots; the difference is whether they have a procedure for them.
"Can my inspector or a third party inspect before shipment?" A manufacturer expects yes and describes access, timing and the inspection standard; a reseller hesitates because the goods may not be on a floor they control.
Questions About AQL and Defect Definitions
"Which AQL values apply per defect class, and who defines the defects?" Listen for the three-class structure — critical (safety, zero acceptance), major (functional and significant cosmetic), minor (tolerance-level appearance) — with sample sizes derived from lot size and inspection level per standard sampling tables. A supplier who proposes values per class for your confirmation understands the method; one who only says "AQL 2.5" may be repeating a number. The mechanics are plain-language on the process quality page.
"Show me a cosmetic standard." Eyewear is worn on the face, so cosmetic zones matter. A serious line has a written standard — allowed zone definitions, viewing distance and light, speck and scratch limits — tied to the sealed golden sample. Without it, "major scratch" is whatever the argument of the day says it is.

Questions About the Golden Sample and Change Control
"How is the golden sample established and where is it kept?" The answer should name PVT timing, physical sealing or marking, retention by both parties, and use as the OQC and third-party comparison standard. The samples process describes how this is set before mass production.
"If a component supplier changes, when do I find out?" The right answer is before substitution, through a change-control clause: approved vendor lists and BOM lock, prior written notification, and certificate-impact assessment where the change touches a certified configuration. Silent component substitution — especially cells and drivers — is the classic reorder-quality failure. Ask whether the cell in the battery file (UN38.3 and shipping documents) is named by batch and vendor.
Questions About Reliability Testing
"Which reliability tests run at DVT, which at PVT, and which continue on production lots?" Factories with engineering depth distinguish design verification (chambers, drop, hinge life, salt spray, ESD — the full catalog on the testing page), type verification on production-intent units, and ongoing aging plus sampling in production. Factories without it point at one aging rack and call everything "quality test."
"Do certificates name my exact configuration, and what triggers re-testing?" Reports should identify the tested build, and re-test triggers should include cell changes, sealing changes for a claimed IP mark, structural revisions and firmware that affects radio behavior. "One certificate covers all our models" is a warning sign; configuration scope is everything.
"Can I see the report index, not just a certificate photo?" Certificate walls in sales decks are easy; a report index with laboratory names, methods, specimen configuration and dates is the evidence a marketplace compliance desk accepts.

Questions About Traceability and Field Response
"If a unit fails in my market, how far back can you trace it?" The chain should run from the unit label to assembly record (line, shift, date), board lot, cell batch and incoming inspection — the five-link structure on the process page. Traceability decides whether a field issue means one replacement or a scoped lot action.
"What is the written response for a field defect pattern?" Expect containment, lot-range scoping, root-cause analysis and corrective action terminology — and a commercial process behind it on the after-sales page. Suppliers who have never thought past "send us a video" are still learning this at your expense.
Questions About Capacity Claims and Marketing Claims
"What is the binding constraint for my build, and what is steady-state versus ramp output?" SMT, assembly labor, aging rack slots and long-lead material each cap output; a serious answer names yours and shows a ramp curve instead of quoting a monthly maximum. The accounting method is on production capability.
"Will you flag marketing claims you cannot substantiate?" This tests integrity more than quality. The correct posture is active: the supplier maps every battery, water, ruggedness and certification claim to a receipt and rewrites or refuses unsupported wording, exactly the discipline in the claims policy. A supplier who will print "waterproof" and "military-grade" on request will also print them for your competitor — and disappear when the listing is challenged.

Red Flags in How Answers Arrive
The delivery of the answer is itself evidence. Watch for: instant generic replies to questions that normally require checking with engineering; refusals to share redacted report pages or record forms; "same as brand X" comparisons without data; certificates under unrelated company names with no manufacturing relationship (the certificate-chain problem described in the verification checklist); no factory walk possible during your actual pilot build; and quality answers that never name numbers, dates or document IDs.
By contrast, strong responses share a rhythm: they specify the configuration first, attach the form or report, name the condition and limit, and confirm final values in a written inspection annex rather than a chat message. That rhythm is more reliable than any single certificate on the wall.
Frequently Asked Questions
How many of these questions should I actually send?
Six to ten is enough to separate systems from salesmanship: one per gate, the AQL values, the golden sample, change control, one reliability question and the traceability question. Suppliers with systems answer quickly and attach documents; the rest deflect.
What if documents are confidential?
Confidentiality is legitimate for third-party and customer-specific information, but redacted report index pages, inspection forms, certificate configuration scope and process descriptions are routinely shared under NDA. Total refusal combined with only marketing-grade photos is the tell.
Does a higher price guarantee a better quality system?
No. Price reflects mix, overhead and negotiation; the quality system is verified directly through these questions and, best of all, an audit during the pilot build. A mid-priced manufacturer with traceable lots and honest claims outperforms a premium reseller renting someone else's certificates.
When is the best time in the order process to ask?
Before deposit and again as written terms: the question set qualifies the supplier pre-order, and the agreed AQL values, golden-sample process and inspection access belong in the contract annex before tooling or material release. The phase calendar marks the checkpoints on the development process page.
Use this list alongside the manufacturer selection playbook, and bring the answers into the RFQ at request a quote — the CYNRIN response includes the inspection annex, report index and claim-substantiation map by default, because every question on this list should be answerable before money moves.