Smart eyewear OEM/ODM manufacturer · Shenzhen, China +86 19835872450 sales@cynrin.com
Bluetooth Audio Glasses

G07 Bluetooth Audio Glasses

The G07 is CYNRIN's Bluetooth audio glasses built around ultra-slim, detachable temples — one frame, swappable temple styles — carrying Bluetooth 5.4, a 55mAh × 2 dual-cell pack, magnetic charging and ~6h of reference music playback for buyers building style-led audio-glasses ranges on one modular frame.

  • Ultra-slim, detachable temples published as a specification row
  • One frame with swappable temple styles for modular merchandising
  • Bluetooth 5.4 radio with a 55mAh × 2 dual-cell pack
  • Magnetic charging with a ≤2h reference charging ceiling
  • ~6h of reference music playback, catalogue OEM from 500 units
Order a sample
Connectivity
Bluetooth 5.4
Battery capacity
55mAh × 2
Charging method
Magnetic charging
Charging time
≤2h
Music playback time
~6h
Temple design
Ultra-slim, detachable

The G07's published record holds six rows: Bluetooth 5.4, 55mAh × 2, Magnetic charging, ≤2h, ~6h playback and an Ultra-slim, detachable temple design. Runtime and charging are reference figures under defined conditions. Frame weight, frame material, lens options, speaker type and the electrical/mechanical interface details of the detachable temples are not published and are confirmed on the configuration sheet per project.

Platform capabilities

One frame, swappable temple styles

Each capability below is taken from the six published G07 specification rows; the differentiating row is Temple design — Ultra-slim, detachable — which no other column in the ultra-slim table publishes, while the radio and power rows share the common platform.

Ultra-slim, detachable temples

Temple design is published as Ultra-slim, detachable — a value unique to the G07 in the ultra-slim comparison, where the YK12 lists only Slim and the LC twins leave the row unpublished. The published description frames it as one frame with swappable temple styles; the latching and electrical interface details are not published and are confirmed on the configuration sheet per project.

Bluetooth 5.4 radio

The G07 carries the Bluetooth 5.4 link shared with the LC-105-1, LC-105-2, YK12, D11 and D12, so a style-led swappable-temple programme uses the same current-generation pairing and firmware baseline as the rest of the slim family rather than a separate radio platform, while the K02 and E13 remain on Bluetooth 5.3.

55mAh × 2 dual-cell pack

The same 55mAh × 2 configuration published for the LC-105-1, LC-105-2 and YK12 backs the G07, with one slim cell typically placed per temple so the ultra-slim profile survives the detachable joint; cell voltage, chemistry and cycle-life ratings are not published and are confirmed with datasheets per project.

Magnetic charging in ~2h

Magnetic charging seats the cable without an exposed port and the published empty-to-full reference ceiling is ≤2h, matching the LC twins, YK12, K02, D11 and D12; where contact placement sits relative to the detachable temple joint is an engineering detail the spec sheet does not publish and is confirmed in writing per project.

~6h open-ear listening

Reference music playback is ~6h under defined conditions, two hours below the LC-105-1, LC-105-2 and K02 at ~8h even though the G07 uses the same 55mAh × 2 pack as the LC twins; call and standby figures are not published, and no Surround sound row appears for the G07, so audio claims stay with daily open-ear listening and hands-free calls.

G07 concept sketches exploring ultra-slim detachable temple styles for one frame
Designed around real use

One frame face, a wardrobe of temple styles.

The G07 answers a merchandising problem rather than a radio problem: style-led buyers want several looks from one inventory position. Its published answer is an ultra-slim, detachable temple design — one frame with swappable temple styles — running the common Bluetooth 5.4, 55mAh × 2 and magnetic-charging platform the rest of the slim family uses.

Detachability changes how a range is sold: temple sets in different finishes can move separately from the optical front, while the front, radio and charging story stay constant. The G07 publishes ~6h of reference music playback on that shared pack, an honest daily-wear figure buyers merchandise around style modularity rather than maximum runtime.

  • 01 Style-led and fashion-audio ranges built around swappable temple sets
  • 02 One shared front and electronics platform across multiple looks
  • 03 Catalogue OEM from 500 units; temple-style and tooling scope confirmed per project
G07 on the CYNRIN line

G07 frames are assembled on CYNRIN's self-owned 20,000+ m² Shenzhen campus on the shared ultra-slim open-ear audio line, with an added detachable-temple interface and style-set assembly step specific to the G07; catalogue OEM starts at 500 units, and additional temple styles with new tooling are scoped and quoted per project.

See the manufacturing record
Engineering record

G07 Bluetooth Audio Glasses specifications

The published platform specification, grouped by engineering domain and maintained as system data. Values are confirmed in writing per project before tooling or mass production.

01

Audio & Connectivity

Connectivity
Bluetooth 5.4
02

Power & Charging

Battery capacity
55mAh × 2
Charging method
Magnetic charging
Charging time
≤2h
Music playback time
~6h
03

Physical & Optics

Temple design
Ultra-slim, detachable

Values are shown from the published CMS product record. Specification changes driven by component or firmware revisions are confirmed in writing on the proforma invoice before tooling or mass production; runtime and charging are reference figures.

Reading the numbers

What the G07 specifications mean in use

The six G07 cards quote the published specification word for word. Five rows share the ultra-slim platform with the LC twins and YK12; the sixth — Temple design, Ultra-slim, detachable — is published for the G07 alone. Runtime and charging are reference figures under defined conditions.

Connectivity Bluetooth 5.4

Bluetooth 5.4 links the G07 to a phone for stereo music and call audio on the same current-generation radio the LC-105-1, LC-105-2, YK12, D11 and D12 publish, while the K02 and E13 stay on Bluetooth 5.3. For a swappable-style programme, a common radio means every temple style ships with the same pairing behaviour and the same radio-certification basis rather than one certification file per look.

Codec support, pairing range, multipoint behaviour and the module supplier are not published; firmware features and module identity are confirmed on the configuration sheet per project.

Battery capacity 55mAh × 2

The G07 publishes the same 55mAh × 2 dual-cell pack as the LC-105-1, LC-105-2 and YK12 — two slim cells distributed across the frame, the physical premise for keeping detachable temples ultra-slim rather than thick at the joint. Identical published capacity is also a reminder not to infer runtime from capacity alone: the G07 tunes to ~6h where the LC twins publish ~8h.

How the cells are split relative to the detachable joint, plus cell voltage, chemistry, supplier and cycle-life data, are not published; datasheets and UN38.3 shipping documents are confirmed on the configuration sheet per project before export.

Charging method Magnetic charging

Magnetic charging aligns the cable to the frame by attraction rather than insertion, the same published method used by the LC-105-1, LC-105-2, YK12 and K02; it keeps the ultra-slim temple face free of an open USB socket, which matters on a part designed to detach and be swapped. The D11 and D12 instead publish Type-C, so the family's accessory packs are not identical.

Contact location relative to the temple joint, pin count, magnet arrangement, cable length and spare-charger pricing are not published; the magnetic accessory specification is confirmed in writing per project before retail packaging is finalised.

Charging time ≤2h

The published empty-to-full reference ceiling is ≤2h under defined conditions, identical to the LC-105-1, LC-105-2, YK12, K02, D11 and D12; no column in the table charges faster on the published record, so the detachable-temple construction does not carry a charging-time penalty or advantage. A ≤2h ceiling covers a between-session refill without the record making any fast-charging claim.

Measured charge time shifts with adapter wattage, cable, temperature and cell age; the reference test profile and charger specification are not published and are confirmed on the configuration sheet per project.

Music playback time ~6h

The G07 publishes ~6h of reference music playback, tying the YK12 and running two hours below the LC-105-1, LC-105-2 and K02 at ~8h despite the same 55mAh × 2 pack; the published record does not attribute the gap, so the honest reading is that the G07 is tuned and merchandised for modular style and daily listening, not for the family's maximum runtime. The YK12 additionally publishes Surround sound, a row the G07 does not have.

The figure is measured at a defined volume with a defined paired phone; high volume, call use and weak signal shorten playback, and talk time, standby time and the exact test conditions are not published.

Temple design Ultra-slim, detachable

This is the G07's differentiating published row: the temples are ultra-slim and detachable, matching the description's one-frame, swappable-temple-styles concept. The LC-105-1 and LC-105-2 leave Temple design as Not published, while the YK12 publishes only Slim, so this value is never copied across the table; it is the basis for selling temple sets as style accessories around a single optical front.

Latch mechanism, electrical contacts through the joint, temple-set compatibility, replacement-temple pricing and available style SKUs are not published; interface drawings and the temple-style catalogue are confirmed on the configuration sheet per project.

Choose within the family

G07 vs the ultra-slim CYNRIN audio-glasses platforms

Every cell comes from the published specification record of the model shown — no estimated or borrowed numbers. Gaps stay as Not published rather than being filled from a sibling model.

Published specification record per model across the slim-temple open-ear family. Linked names open that product page.
Specification K02 LC-105-1 LC-105-2 G07 YK12
Position Value BT5.3 open-ear audio Ultra-light BT5.4 open-ear audio LC platform alternate-finish build Ultra-slim detachable-temple audio Slim, surround open-ear
Connectivity BT 5.3 BT 5.4 BT 5.4 BT 5.4 BT 5.4
Battery capacity 90mAh × 2 55mAh × 2 55mAh × 2 55mAh × 2 55mAh × 2
Charging interface Magnetic charging Magnetic charging Magnetic charging Magnetic charging Magnetic charging
Reference charging time ≤ 2h ≤ 2h ≤ 2h ≤ 2h ≤ 2h
Reference playback time ~8h music ~8h music ~8h music ~6h music ~6h music
Temple design Not published Not published Not published Ultra-slim, detachable Slim
Speaker / audio Not published Not published Not published Not published Not published

The G07 shares Bluetooth 5.4, 55mAh × 2, Magnetic charging and the ≤2h ceiling with the LC-105-1, LC-105-2 and YK12, but publishes ~6h playback where the twins reach ~8h (the larger-cell K02 also publishes ~8h) — and it is the only column with an Ultra-slim, detachable temple row, versus the YK12's Slim and Not published for the twins. The G07 also carries no Surround sound row; that value belongs to the YK12 and D11. Treat runtime and charging as reference figures under defined conditions.

Applications

Where G07 fits

The G07's published record — detachable temples, one frame, swappable styles and a shared 5.4 platform — points to routes built on style modularity rather than on maximum runtime or camera features.

Injection moulding line producing ultra-slim G07 detachable temple shells

Temple-set accessory programmes

Distributors can merchandise additional temple styles as accessory sets against one front-frame SKU; each new style that needs tooling is scoped and quoted per project, while the shared Bluetooth 5.4 electronics, 55mAh × 2 pack and ≤2h magnetic charging stay constant across the whole G07 range.

Close detail of surface-mount electronics inside the G07 audio temple

One electronics core, many looks

Because every G07 style runs the same published radio and power hardware, quality and certification work follows one platform record rather than repeating per colourway; buyers expand the lineup by adding temple shells and finishes, and they confirm the mechanical interface and replacement-temple compatibility on the configuration sheet per project.

B2B handshake closing a G07 swappable-style audio glasses programme

Co-brand & seasonal capsules

Fashion and lifestyle partners use the detachable platform for limited or seasonal capsule releases where the partner supplies the style direction and the factory supplies the validated audio front; branded OEM typically starts at 1,000 units, while structural joint changes move into ODM territory and are quoted separately with the temple-tool scope confirmed in writing.

From brief to shipment

G07 programmes move through Define, Configure, Validate and Produce — see the full stages, timelines and deliverables on the OEM/ODM process page.

  1. Define
  2. Configure
  3. Validate
  4. Produce
See the full OEM/ODM process
2018CYNRIN established in Shenzhen
20,000+ m²Self-owned production campus
500 pcsCatalogue OEM entry MOQ
15–40 daysTypical mass-production window
Project documents

Available on request

Buyer questions

G07 Bluetooth Audio Glasses FAQ

What is the G07 and what makes it different in the audio family?
The G07 is CYNRIN's Bluetooth audio glasses built around ultra-slim, detachable temples — the published description calls it one frame with swappable temple styles. Its six published rows are Bluetooth 5.4, a 55mAh × 2 dual-cell pack, Magnetic charging, a ≤2h reference charging ceiling, ~6h of reference music playback and an Ultra-slim, detachable temple design. The detachable temple row is unique to the G07 in the ultra-slim comparison; it carries no camera or display.
What does detachable temple design mean in practice?
The published Temple design value is Ultra-slim, detachable: the temple assemblies are intended to separate from the optical front so different temple styles can be swapped onto one frame, matching the published one-frame, swappable-styles concept. The specification does not publish the latch mechanism, electrical contact arrangement, compatible temple-set list or replacement-temple pricing. Those interface details and the available style catalogue are confirmed on the configuration sheet and through mechanical samples per project rather than inferred in marketing copy.
How does the G07 compare with the LC-105-1 and LC-105-2?
All three share Bluetooth 5.4, a 55mAh × 2 dual-cell pack, Magnetic charging and the ≤2h reference charging ceiling. The published differences are runtime and temples: the LC twins quote ~8h of reference music playback while the G07 quotes ~6h, and the twins leave Temple design as Not published whereas the G07 publishes Ultra-slim, detachable. Buyers choose the G07 for swappable style and accept the shorter published runtime; the twins are the choice when the buying decision is led by playback time on a fixed-finish frame.
Why is the G07's published runtime ~6h while the LC twins publish ~8h?
The record gives no cause: both publish the same 55mAh × 2 pack and the same ≤2h charging ceiling, yet the G07 and YK12 list ~6h and the LC-105-1, LC-105-2 and K02 list ~8h. The honest explanation is system tuning, acoustics and frame structure rather than capacity, so CYNRIN does not claim the G07 matches the twins. The ~6h figure is a reference value measured at a defined volume with a defined paired phone; talk time and standby time are not published.
Does the G07 have surround sound like the YK12?
No. The YK12 publishes a Features row reading Surround sound, but the G07's record stops at six rows and contains no such feature; the same care applies to the D11, which publishes Surround sound while the D12 does not. G07 copy is kept to open-ear daily music and hands-free calls over the Bluetooth 5.4 link. Speaker type, driver count and codec support are not published for the G07 and are confirmed on the configuration sheet per project if a buyer needs them for channel claims.
Can customers order different temple styles or colours for one G07 frame?
That is the platform's published intent — one frame with swappable temple styles — but the catalogue of style SKUs, finish options, latch compatibility and replacement-temple pricing is not part of the specification record and is not invented for a quote. Temple sets and any additional tooling are scoped during sampling and confirmed on the configuration sheet per project; catalogue OEM of the base G07 starts at 500 units, and custom style programmes are quoted against the specific number of temple variants.
How does magnetic charging work with the detachable temples?
The published charging method is Magnetic charging with a ≤2h empty-to-full reference ceiling: a magnetic cable aligns to contacts on the frame or temple by attraction, the same method the LC twins, YK12 and K02 publish, so the side profile stays free of an open socket. Where exactly the contacts sit relative to the detachable joint, and whether a detached temple charges independently, is not published; the contact drawing and accessory specification are confirmed in writing per project before retail packaging is finalised.
Does the G07 support hands-free calls?
Yes within the published platform language — the G07 is an audio glasses model with daily listening and hands-free calling over its Bluetooth 5.4 link, consistent with the open-ear audio family — but the formal spec rows do not publish microphone count, a separate talk-time figure or wind-noise performance, so headline claims stay at hands-free calls and daily audio. Call-quality evidence under a defined noise profile and any branded microphone tuning are confirmed on the configuration sheet per project.
What frame weight, material, lens and waterproof specifications are published?
None: frame weight, frame material, lens options, operating temperature, speaker type and any IP or water-resistance rating are not among the six G07 rows, and the ultra-slim description is not converted into a gram figure. Sports and cycling channels should request the relevant test reports rather than inheriting ratings from other models. All physical, optical and ingress details are agreed through samples and confirmed on the configuration sheet per project, with the detachable-joint drawing included in that review.
What is the MOQ for a G07 order, including extra temple styles?
Catalogue OEM configuration of the base G07 starts at 500 units with catalogue colours and standard magnetic charging accessories. Branded OEM — custom logo, packaging and documentation — typically starts at 1,000 units. Additional temple styles that need new moulds, fixtures or structural changes are evaluated as ODM work, typically at 3,000–5,000 units, and quoted per variant. The final minimums for a frame-plus-temple-set assortment are confirmed in writing against the concrete brief and style count.
How customisable is the G07 platform for an own-brand range?
Logo placement, frame colour, temple-shell finish, packaging, inserts and documentation are reviewed against target quantity and destination market, with the shared Bluetooth 5.4 electronics and magnetic charging system unchanged; that keeps certification and quality planning on one platform record. Custom temple silhouettes or changes to the detachable interface cross into ODM and carry their own tooling and validation scope. Every custom item, style count and price is confirmed on the proforma invoice before tooling or mass production begins.
Which certifications and lead times apply to the G07?
CE, FCC and RoHS are certification capabilities at CYNRIN, verified per destination market on request rather than blanket claims for a particular G07 build; share target markets at RFQ so the correct radio, RED/EN 18031 cybersecurity and battery-shipping documents — including UN38.3 for the 55mAh × 2 dual-cell pack — are scoped across all temple styles. Sample timing is confirmed once the brief and temple-tool scope are reviewed, and mass production typically runs 15–40 days after deposit, with the style-set schedule agreed in writing.
Project desk

Configure the G07 for your market

Send your target quantity, destination market, the temple styles or finishes you want to explore, packaging scope and whether additional tooling is expected. CYNRIN replies with the G07 configuration sheet, the detachable-interface and temple-style details, sample timing, MOQ confirmation and the certification scope verified for your markets.

Sample
Chat on WhatsApp
Your experience on this site will be improved by allowing cookies.