What is the YK12 and what does it do?
YK12 is a slim-temple Bluetooth audio glasses model in the CYNRIN open-ear family. It pairs with a phone or laptop over Bluetooth 5.4, plays open-ear audio with a published Surround sound feature and runs on dual 55mAh × 2 cells with about 6h of reference music playback. Magnetic charging restores the frame within a reference time of up to 2 hours, which positions YK12 for everyday office, commute and retail own-brand programmes rather than camera or sports use.
What does the published Surround sound feature on YK12 involve?
The specification record lists Surround sound in the Features row, indicating an open-ear sound-field treatment rather than sealed in-ear audio. It is the only audio-feature value published in the slim-temple comparison, where LC-105-1, LC-105-2 and G07 publish no equivalent row. CYNRIN does not print driver size, sound pressure level or microphone count for YK12, so those acoustic parameters are confirmed on the configuration sheet for each project instead of estimated from the feature name.
What battery capacity does YK12 publish and how long does it play?
The published battery is 55mAh × 2, one nominal 55mAh cell per temple, the same dual-cell figure used by LC-105-1, LC-105-2 and G07; K02 publishes the larger 90mAh × 2. Reference music playback is listed at about 6 hours under defined conditions, matching G07 and sitting below the about-8h columns. Actual runtime moves with volume, call use, signal and temperature, and standby time is not published.
How does YK12 charge and how long does charging take?
YK12 publishes Magnetic charging, the common contact-docking method across the entire slim-temple family, and the reference charging time is up to 2 hours. The magnetic interface seats the contacts without threading a plug, which suits desk docks and retail accessory bundles. Charger wattage, dock geometry and cable specification are not printed, so CYNRIN confirms the charging accessory details on the configuration sheet before tooling is released.
What does the Slim temple design mean for fit and frame options?
The Temple design row reads Slim, describing an everyday low-profile silhouette; G07 is the family column that instead publishes Ultra-slim, detachable. The record gives no temple thickness in millimetres, frame material, hinge type, weight, lens options or colours for YK12, so those cells stay Not published in the comparison. Available trims, tints and prescription options are built around target market and quantity, then documented on the configuration sheet.
How does YK12 compare with G07 and the LC-105 models?
YK12, LC-105-1, LC-105-2 and G07 share Bluetooth 5.4, 55mAh × 2 cells, magnetic charging and a reference charge within about 2 hours. YK12 and G07 publish about 6h playback, while both LC-105 columns publish about 8h. YK12 lists a Slim temple and Surround sound, G07 lists an Ultra-slim, detachable temple, and the LC columns publish no temple or feature rows, so the columns differ on published form and feature values rather than power.
Which devices is YK12 compatible with, and does it need an app?
The record publishes Bluetooth 5.4 as the connectivity value, so YK12 pairs as a standard Bluetooth audio accessory with phones, tablets and computers that support the protocol. A one-revision-older K02 remains on Bluetooth 5.3, but both generations work with mainstream devices. The YK12 specification names no companion application, codec list, multipoint behaviour or range figure, and CYNRIN does not assign app functions from another model; those points are confirmed per project in writing.
Does the YK12 seal or block the ear canal?
YK12 is positioned as an open-ear Bluetooth audio glasses platform and is marketed with a Surround sound feature, so the design intent is listening without sealing the ear canal, letting ambient speech and traffic remain audible. The specification record does not publish a formal acoustic leakage, isolation or safety figure, so CYNRIN does not quote a decibel isolation number. Buyers that need measured open-ear performance request the acoustic test data on the configuration sheet for the configured sample.
What is the MOQ for a YK12 catalogue or branded order?
Catalogue OEM entry begins at 500 units and covers the standard YK12 Bluetooth 5.4 platform with available options and basic logo treatment. Branded OEM with broader logo placement, custom packaging and fuller documentation scope typically starts at 1,000 units. Structural or electronic engineering changes are handled as ODM, typically evaluated in the 3,000-5,000 unit range, with the final threshold confirmed after engineering reviews the brief and target market.
What customisation is available on the YK12 platform?
YK12 supports OEM and ODM configuration across logo placement, colourway, temple trim, lens and accessory selection, packaging, inserts and documentation language. Because the record publishes no colours or lens options for YK12, the option matrix is built around the sales channel and destination market rather than selected from a pre-published list. Changes to temple electronics, the magnetic charging interface or the acoustic stack move the project into ODM scope and its higher MOQ band.
Are certifications and test reports available for the YK12?
CE, FCC and RoHS are listed among CYNRIN's certification capabilities, and applicable reports are verified against the destination market and supplied on request; YK12 is not claimed on the page as certified for any specific region. A shipment into the EU calls for a different report set than a US or other-market shipment, because the tested configuration must follow the final product. CYNRIN confirms the applicable standards, report scope and sample configuration in writing before production.
What sample and mass-production timing applies to the YK12?
Sample timing for the configured YK12 frame and magnetic charging accessory is scheduled and confirmed in writing after the brief is received, including the selected trim and any logo or packaging scope. After deposit, mass production typically runs 15-40 days, varying with order quantity, configuration complexity, documentation and certification coordination. The end-to-end schedule, including samples, inspection and export logistics, is agreed up front rather than promised as a fixed date on the page.
How do we launch a YK12 RFQ with CYNRIN?
Send target quantity, destination market, preferred temple trim and lens scope, channel type and any packaging or charging-accessory expectations. Engineering maps the YK12 Bluetooth 5.4, 55mAh × 2 platform to the brief and replies with the configuration sheet, sample schedule, the applicable 500-unit catalogue or 1,000-unit branded MOQ tier and the certification scope for the region, so the programme can begin at the Define gate with the numbers confirmed in writing.